Essential Knowledge and Tools for Continuous Improvement at Eastern Michigan University Training presented by John C. Dugger III, Ph.D. on behalf of the.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Denver Health Lean Training Created by: Katie Stanek, Lean Facilitator
P D S A REVIEW ACT PLAN STUDY DO Plan Continuous Improvement
Agenda - January 28, 2009 Professional Learning Community – Jefferson HS Learning by Doing What does the data tell us? ITED results SIP Goals Data Questions.
Performance Management
CAUSE & EFFECT DIAGRAM (Fishbone or Ishikawa Diagram) Dr
East Central Regional Hospital
A3 Training Session. Introduction…. We all are involved in… – Looking for ways to save resources – Finding ways to improve quality – Fixing problems –
How to Map a Sales Process That Creates Value for Customers! July 2003.
Orientation for New Site Visitors CIDA’s Mission, Value, and the Guiding Principles of Peer Review.
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Group Techniques John A. Cagle California State University, Fresno.
Overview: Plan-Do-Check-Act Cycle.
PHD Performance Management Program Matt Gilman Spencer Soderlind Brieshon D’Agostini October 19, 2011 PDCA Training Series 2 DO 1.
Total Quality Management
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 13 Tools for Process Improvement.
Putting It all Together Facilitating Learning and Project Groups.
Chapter 10 Quality Improvement.
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
TSM: Safety Management in a Quality Management Setting
Başak Karakaya Industrial Engineering Department
QUALITY ASSURANCE PROJECT Conducting Effective Meetings The purpose of this module is to enhance participants’ knowledge and skill in observing team meetings.
Quality Improvement: Problem Solving
INTRODUCTION Performance management is a relatively new concept to the field of management.
Uncovering the Promise of Faculty Success Online Lawrence C. Ragan, Ph.D. Penn State’s World Campus NERCOMP Boston 2005.
The Importance and Value of Process Improvement. Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Tools for Process Improvement
QS 702 Phase II: Encouraging the Integration of Technology Into Higher Education.
Quality management Lecture 3.
Performance Technology Dr. James J. Kirk Professor of HRD.
Everyone Has A Role and Responsibility
Quality Directions Australia Improving clinical risk management systems: Root Cause Analysis.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
C ONTINUOUS Q UALITY I MPROVEMENT M ODEL The Deming cycle: Originally developed by Walter Shewart, but renamed in 1950s because Deming promoted it extensively.
A COMPETENCY APPROACH TO HUMAN RESOURCE MANAGEMENT
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
Communications Skills (ELE 205)
Problem Solving.
Copyright 2003 – Cedar Enterprise Solutions, Inc. All rights reserved. Business Process Redesign & Innovation University of Maryland, University College.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Chapter 8 Problem-Solving Using Define, Measure, Analyze, Improve, Control.
Communications Skills (ELE 205) Dr. Ahmad Dagamseh Dr. Ahmad Dagamseh.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Facilitate Group Learning
Quality Circle and 8 D Methodology Dr. Mohamed Riyazh Khan - DoMS.
Traditional Economic Model of Quality of Conformance
Chapter 13 Tools for Process Improvement MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1.
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
Advances In Software Inspection
Dances with Faculty: Empowering Success in the Online Environment Lawrence C. Ragan, Ph.D. & Marilynne Stout, Ph.D. Penn State’s World Campus.
By Dr Anjali Bansal Quality Circles.
Insert name of presentation on Master Slide The Model for Improvement Wednesday 16 June 2010 Presenter: Dr Jonathon Gray.
PGY-3 Service Projects David E. Kolva, MD Practice Management Seminar.
Success in the Online Environment Lawrence C. Ragan, Ph.D., Penn State’s World Campus Mount St. Vincent University April 12th 2005.
Fundamentals of Monitoring and Evaluation
Total Quality Management
Quality Certification
Quality Improvement: Problem Solving
OPS/571 Operations Management
Measuring Project Performance: Tips and Tools to Showcase Your Results
Quality Improvement: Problem Solving
TOTAL QUALITY MANAGEMENT
The 7 Basic Quality Tools ~ The DMAIC Process
Ch. 8 - Controlling.
Presentation transcript:

Essential Knowledge and Tools for Continuous Improvement at Eastern Michigan University Training presented by John C. Dugger III, Ph.D. on behalf of the Continuous Improvement Advisory Committee October 13, 2006

Sequence of Activities Assess knowledge of training participants Share Assumptions and Reasons for Training Reveal Roots of IDEA Model Present Example of AQIP Project Reveal the Components of the Identify Step Break Reveal the Components of the Develop Step Present Evaluation and Action Steps Apply IDEA Model to proposed CI: Ex. AQIP project Assessment of Learning Assessment of Training

Pre-assessment Use the next ten minutes to complete the test that is being distributed. Please do not discuss this instrument until today’s training is complete.

Are you confused about all the jargon from the "experts”?

An expert is a man who has made all the mistakes which can be made in a very narrow field. Niels Bohr (1893)

Assumptions You are motivated and are high performers. A basic understanding of the “schools” of management thought is useful to leaders and teams. Some background information enhances understanding and the capacity to apply new concepts. You like to learn and apply what you learn. You will question things that you do not understand.

Continuous Improvement Program Requires commitment of top management Process focused Utilizes teamwork Requires controlled experimentation before formal change

Brief History of Management Thought Scientific Management Bureaucratic Management Administrative Management Human Relations Management Contingency Management

Two approaches to designing a management system Product/Service focus Quality checks at end Process focus Quality checks throughout

Product/Service-Focus 1.Work is checked at end. 2.Rework/interventions occur frequently. 3.Groups work in silos—little communication. 4.Large group sessions consist primarily of finger-pointing. 5.Example—Admissions decision at East Bahaman State U. InputProcess IProcess 2 Quality Control Rework Output

Process Focused InputProcess IProcess 2Output Quality Control 1.Work standards are developed and are checked at every step. 2.Rework occurs only in rare instances. 3.Groups periodically meet to promote better service. 4.Large group work is focused and systematic. 5.Example—Admissions decision at Perfect U.

Historical Development Shewhart Proposed stopping “end check” approach (Product/Service focus) and replacing it with a process focused approach. Deming Embraced Shewhart and proposed the “Shewhart” cycle as a tool to guide a process-focused approach The cycle included four steps (Plan, Do, Check, and Act) This has since been expanded by some to the FOCUS- PDCA Approach

Shewhart FOCUS-PDCA Cycle FFind a process that needs improvement OOrganize a team that knows the process CClarify knowledge of the process by charting UUncover causes of poor performance SStart the P-D-C-A cycle PPlan a pilot to test the improvement DDo what is necessary to implement CCheck whether performance improved AAct to adopt, adjust, or abandon the change

Comparison of Shewhart Cycle and EMU IDEA Model Shewhart CycleEMU IDEA Model F Find a process that needs improvement CIAC and/or Administration O Organize a team that knows the process C Clarify knowledge of the process by charting I Identify issues and areas of opportunity for improvement. U Uncover causes of poor performance S Start the P-D-C-A cycle P Plan a pilot to test the improvement D Develop and assess potential solutions and implement best alternative. D Do what is necessary to implement C Check whether performance improved E Evaluate the results against the initial goals. A Act to adopt, adjust, or abandon the change A Act to adopt, adjust or abandon.

Teamwork Tools Code of Cooperation/Charter (Handout) Mission and Goals Roles Meeting Record Agenda control Action items

Our EMU Model

First Step Identify issues and areas of opportunity for improvement.

Identify Step Process analysis tools–systems model, cause and effect, charting, mapping Problem Identification Designing Data Collection Activities Use of Pareto Diagram Histograms Identification of Measures Using qualitative and quantitative measures

Analyzing Processes InputProcessOutput

Process Variables People Methods Materials Output Machines Environment Input

Process Variables to Analyze VariablesAdmissions Example PeopleApplication clerks MaterialsForms MethodsOperation sequence MachinesComputer/Software EnvironmentPhysical, psychological, emotional, etc.

Fishbone Diagram The Fishbone diagram was invented by Japanese quality guru Kaoru Ishikawa, and is named "Fishbone" because the diagram looks like a fish's skeleton. The Fishbone diagram is a tool for identifying as many root causes of quality or other problems as possible.

Fishbone Diagram Example

Pareto Charts Purpose Of A Pareto Chart A Pareto chart is used to graphically summarize and display the relative importance of the differences between groups of data. Sample Pareto Chart for rejections due to incomplete application forms

What Questions the Pareto Chart Answers What are the largest issues facing our team or business? 80/20 Rule - What 20% of sources are causing 80% of the problems? Where should we focus our efforts to achieve the greatest improvements?

Brief Exercise An analysis of the East Bahaman State University admissions area suggests that there is a problem with employee tardiness. Data were collected regarding reasons for tardiness and 168 cases of tardiness were documented. What reasons do you think were given by employees for their tardiness?

East Bahaman State U. Chart

What is a performance measure? A tool to help you control the outcomes of your association. It enables you to be the driver rather than a passenger on your organization’s journey. It establishes parameters for the “end” that you desire for your organization.

Why are performance measures important? If it can't be measured, it can't be managed. What gets measured gets watched. What gets watched gets done.

Second Step Develop and assess potential solutions and implement best alternative

Develop strategy for improvement Brain-storm possible interventions/improvements List criteria for success Select the best intervention Design the experiment Carry out the experiment

Third Step Evaluate the results against the initial goals.

Evaluate Design data collection approach Collect data that will be used to compare pre and post intervention. Analyze data Compare results with what was expected/desired.

Fourth Step Act to adopt, adjust or abandon.

Act Based on the results of the evaluation, adopt, adjust or abandon the intervention. If the intervention is adopted, do the following: Standardize the intervention (new process) Carefully document Error proof the process If the decision is to adjust, then start the IDEA cycle again.

Exercise Review the exercise sheet Complete the sheet Get into your AQIP groups Review each item to determine the level of agreement Report the level of agreement

Test and Training Evaluation Complete the test. Complete the training evaluation

Thank you for your attention and participation!