Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.

Slides:



Advertisements
Similar presentations
Storm Water Management
Advertisements

SMP Sizing in Redevelopment Projects Scenarios are countless Tools –Simple method –CN back calculation –Peak Discharge Rate Chapter 10 Criteria List of.
Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
SUNY ESF Workshop Shohreh Karimipour, P.E. Enhanced Phosphorus Removal Standards NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION.
Permeable Paving. Low Impact Development (LID)  Low impact development (LID) is an approach to managing stormwater runoff to protect water quality.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
Construction of Facilities Dan Cloak Environmental Consulting Construction Workshop, May 2, 2012.
CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
Design of Vegetative Filtering Systems-Open Channels and Filter Strips Prepared by the Center for Watershed Protection.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
UW LID Workshop Bioretention Flow Control Modeling May 2008
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Soil Conservation Service Runoff Equation
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Low Impact Development Best Management Practices
 Development replaces permeable desert with impermeable roofs and pavement  Increases peak and total stormwater discharge  Classical approach: large.
Surface Water Drainage Latest policy and practice in respect of surface water drainage and delivery of competitive solutions August 2013 Claire Cornmell.
Better Site Design Sustainability & Stormwater
Managing the Environmental & Project Development Process StormwaterManagement.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Design of Stormwater Filtering Systems Center for Watershed Protection
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Design of Infiltration Practices
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Vegetated Filters Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
The Green Corridor Project
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
STORMWATER MANAGEMENT
Local Plans, Regulations, or Policies Supporting Green Infrastructure City and County of Honolulu Department of Facility Maintenance – Storm Water Quality.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Storm Water Runoff Storm Water Runoff
 Holds water in the landscape so it infiltrates (drain) into the ground.
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
City of Clarksville Storm Water Management Manual Revisions 2014.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
LIMITING IMPERVIOUS SURFACE COVERAGE USING POROUS TECHNOLOGIES
Storm Water Storage and Treatment
Permeable Paving.
Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) November 18, 2018 Jay Dorsey.
Kickoff example Create a new file
Intro MIDS Calculator Use
MIDS Calculator Use - Intermediate
Presentation transcript:

Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011

Horsley Witten Group, Inc. Chapter 5 - Acceptable BMPs

Horsley Witten Group, Inc. Minimum Design Criteria Required Elements and Design Guidance –If required elements can’t be met, select a different BMP Six Categories –Feasibility –Conveyance –Pretreatment –Treatment –Landscaping –Maintenance

Horsley Witten Group, Inc. Section 5.2: Wet Vegetated Treatment Systems

Horsley Witten Group, Inc. WVTS: Design Notes Shall not be located within jurisdictional waters, except may be allowed in previously developed upland buffers Restricted in cold-water fisheries watersheds –Discharges prohibited w/in 200 ft of jurisdictional waters –Beyond 200 ft, discharge up to the CPv through an underdrained gravel trench outlet LUHPPL runoff requires a 3-ft separation to gw, no separation distance required for non-LUHPPL runoff Permanent pool volumes shall not be included in storage calcs for peak flow management (CPv/Qp)

Horsley Witten Group, Inc. Shallow WVTS: Design Notes Minimum flowpath of 2:1 (length to width) High surface area to volume ratio –Pretreatment (10% of WQv) –Deepwater zones (25% of WQv) –Remaining 65% WQv combination of shallow pool and ED Shallow depths over most of surface area –35% 6 inches or less –65% 18 inches or less Complex internal microtopography Plant with emergent vegetation Consumes most land of any BMP option –1.5% of DA

Horsley Witten Group, Inc. Gravel WVTS: Design Notes Min. ratio of 1:1 (length to width), min. flowpath (L) of 15 ft Pretreatment: 10% WQv Remaining 90%, a combination of one or more basins/chambers filled with gravel and open ED Outlet invert just below gravel surface Surface area must be minimum 0.35% of DA May use organic soil Plant with emergent vegetation

Horsley Witten Group, Inc. Section 5.3: Infiltration

Horsley Witten Group, Inc. Infiltration - Design Notes Field verification of soil permeability/texture essential Pretreatment essential – minimum 25% of WQv Bottom of infiltration facility cannot be located in fill*, must have 3’ separation from gw and bedrock* Size based on design infiltration rates (Table 5-3) Guidance: Keep drainage areas to each practice small, may reduce some potential problems * Reduced requirements for residential areas

Horsley Witten Group, Inc. Design Notes (cont’d) ** 100% WQv treatment requred by separate BMP in these areas Cannot be used if contributing drainage is a LUHPPL Higher maintenance burden Stabilize site prior to installation Must meet variety of setbacks * (Table 5-2) May be used for larger storm events if infiltration rate > 8.3 in/hr**, mounding analysis may be required * Reduced requirements for small-scale BMPs in res. areas

Horsley Witten Group, Inc. Section 5.3: Permeable Paving Two main categories: Porous asphalt and pervious concrete Pavers 1.Permeable solid blocks (min. void ratio 15%) or reinforced turf 2.Solid blocks with open-cell joints>15% of surface 3.Solid blocks with open-cell joints<15% of surface with 1” surface storage

Horsley Witten Group, Inc. Permeable Pavements – Design Notes May be used as infiltration and/or detention system For infiltrating practices: –Field verification of soil permeability/texture essential –Bottom of facility cannot be located in fill* and must have 3’ separation from gw and bedrock* –Size based on design infiltration rates (Table 5-3) –Cannot be used if contributing drainage is a LUHPPL –Must meet variety of setbacks* (Table 5-4) Frequent maintenance necessary to retain permeability (vacuum) Use only on low traffic/speed areas with gentle slopes (<5%) Generally not designed to accept runoff from other areas * Reduced requirements for resid. areas

Horsley Witten Group, Inc. Section 5.5: Filtering Practices Sand/organic filters Bioretention areas/Tree filters

Horsley Witten Group, Inc. Filter Sizing Equation A f = (WQ v ) (d f ) / [(k) (h f + d f ) (t f )] Where:A f = surface area of filter bed (ft 2 ) d f = filter bed depth (ft) k = coef of permeability of filter media (ft/day) h f = average height of water above filter bed (ft) t f = design filter bed drain time (days) (2 days is recommended)

Horsley Witten Group, Inc. Sand/Organic Filter: Design Notes Pretreatment essential (25% WQv) Sized for temporarily holding at least 75% of WQv, including pretreatment Minimum depth of 18” (12” allowed in some instances) Use a conservative permeability coefficient Need maintenance access to filter bed Useful to treat LUHPPL runoff

Horsley Witten Group, Inc. Bioretention: Design Notes Pretreatment essential (25% WQv) Sized for temporarily holding at least 75% of WQv, including pretreatment 6”-9” ponding above surface Typically, 2’-4’ planting soil bed (12” allowed in some instances) Specific engineered soil media Use a conservative permeability coefficient Detailed landscape plan required

Horsley Witten Group, Inc. Bioretention Planting Soil and Mulch Loamy Sand to a Sandy Loam –85-88 % sand –8-12 % silt –0-2 % clay Well-aged graded compost (25% of soil mix) Layer of well-aged, shredded hardwood mulch

Horsley Witten Group, Inc. Section 5.6: Green Roofs Design Notes Designed to manage WQv without bypass Safely convey runoff from larger storm events to a downstream drainage system No pretreatment required

Horsley Witten Group, Inc. Section 5.7: Open Channels

Horsley Witten Group, Inc. Pretreatment: 10% WQv Use filter sizing equation 2 ft ≤ Bottom Width ≤ 8 ft Minimum 30” engineered bio soil (12” allowed in some instances) Maximum 12” deep average surface ponding depth Select the most appropriate native seed mix for expected swale conditions (Appendix B) Do not use on slopes greater than 4% w/o cells or checkdams Erosion control fabric for steeper grades May need some topsoil, fertilization, and irrigation to get grass established Dry Swale: Design Notes

Horsley Witten Group, Inc. Dry Swale

Horsley Witten Group, Inc. Wet Swale: Design Notes Constructed in groundwater Pretreatment: 10% WQv Permanent pool may be included in WQv calculations 2 ft ≤ Bottom Width ≤ 8 ft Generally, <1% slope Planted with emergent vegetation (Appendix B)

Practices Approved for Other Criteria Storage Practices – Chapter 7  Stormwater Basins  Underground Storage Devices  Infil. for Recharge/Storage Pretreatment Practices – Chapter 6  Grass Channel  Filter Strips  Sediment Forebay  Deep Sump Catch Basins  Proprietary Devices

Horsley Witten Group, Inc. Questions?