Problem Description The process of saucemix delivery is high in Non-Value Adding (NVA) activity (98%). The process highlights long distances travelled.

Slides:



Advertisements
Similar presentations
Welcome Wheeling, WV P&DF Area Mail Processing (AMP) Study January 13, 2010.
Advertisements

Welcome Hickory, NC P&DF Area Mail Processing (AMP) Study November 19, 2009.
Welcome Dallas, TX P&DC Area Mail Processing (AMP) Study July 1, 2009.
Factory Objectives Value of Asset Management Strategies.
Test Automation Success: Choosing the Right People & Process
Value Stream Mapping A Laboratory Tool Laurie Peterson-Wright Colorado Department of Public Health and Environment Laboratory Services Division.
Standard Work Standard Operations Training Pack. Aims & Objectives Target Audience Production staff, ME & Training personnel Aim To give attendees the.
IMPROVEMENT PLAN UPDATESPO Richard Latham Bridget Eggers Tyler Brent Valeria Gonzalez.
Daylight Savings Time Transition Planning. The Daylight Savings Operational Risks Affect on transaction cash flow? Affect on service delivery? Affect.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
Time System What is this all about? The purpose of this project is to automate how Evergreen collects, records and manages employees’ dates and times worked.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
The Australian/New Zealand Standard on Risk Management
Lean Manufacturing Chris Poteet Scott Carroll.
Agenda Define Efficiency. Where do we start? –Expenditures –Revenue Establish Performance Indicators. Cost savings measures. Things to think about. Bottom.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
How to Effectively Implement Set-up Reduction in Any Organization.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Town of Chapel Hill Fleet Best Practices and Idle Reduction Strategies.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Case Study _ Smart Art Team Type: Cross FunctionalTeam Size: 6 members Project Meetings: 12 Primary Metric: Specific customer complaint on average every.
Think management system Personnel Management System Financial Management System Risk Management System Environmental Management System.
Think management system Personnel Management System Financial Management System Risk Management System Environmental Management System.
Manufacturing Input Ingredients Process Mixing, chopping, baking
On Target Group Coaching
June 20, 2012 Outsourcing Physical Plant Should I ???
An Efficient pooling system of Reusable Transport Items for a better environment.
What is DOWNTIME? Scott Thor © Variance Reduction International, Inc. (VRI), All Rights Reserved.
LeanSigma® Fundamentals
Sustainability and Engineers Chris Smith Manager, Global Sustainability, Shell/Royal Academy of Engineering Visiting Teaching Fellow.
P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.
Risk Management Production Process. Lecture content Recap on last week What is risk management? Quantitative risk evaluation – Decision trees Expected.
Estimating Project Benefits ISE Sr. Design
Duncan Gerrard Director of International Sales An Operational View (Not Technical ) APD Communications APD COMMUNICATIONS.
MANAGING BUSINESS RISKS AN OVERVIEW CSU, Northridge January, 2004 Chris Brady University Risk Manager.
Cost Management Session 3. Overview Theory Exercise: 1.39; 1.42; 1.50;
Niblock & Associates, LLC ©2010 Niblock & Associates, LLC Christian M. Paulsen 1.
Injury Prevention and Injury Management A system of processes that targets workplace physical injury reduction.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
Business Process Management
AIR POLLUTION PREVENTION AND CONTROL
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Welcome Lima, OH P&DF Area Mail Processing (AMP) Study January 6, 2010.
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
Operational Strategies: Lean Production A2 Business Studies.
Workplace injuries are at least a 50 Billion dollar problem in Australia. Work Safe Australia.
Municipal Research and Services Center How Interlocal Agreements Can Work for Public Hospitals Local Government Partnerships Municipal Research.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
6 S System The Visual Workplace Directorate of Training and Education
Introduction to OEE (Overall Equipment Effectiveness)
A sustainable safety performance for railways Angelo Pira Project Officer at the European Railway Agency (ERA)
Ergonomics Risk Management: Strategies and Interventions at Workplace Level Back to Basics Conference June 13 th 2014 Frank Power Inspector (Projects Manager)
Toolbox Meetings What is a toolbox meeting? An informal 5 to 15 minute meeting held by supervisors used to promote safety.
Human Error Reduction – A Systems Approach.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
2016 Maintenance Innovation Challenge
Ken Shoquist VP, CIO Information Technology Board Meeting October 2003
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
CSPEC meeting - Coatings
Topics To Be Covered 1. Some Thoughts on Production Management
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

Problem Description The process of saucemix delivery is high in Non-Value Adding (NVA) activity (98%). The process highlights long distances travelled (3,350 miles) resulting in potential high risk accidents and high labour content of approximately £22,032 PA over 3 shifts.

What does good look like? A process that delivers the sauce mix to the machine autonomously that is safe and easy to clean being quality friendly. This will result in zero accidents, zero downtime and savings in excess of £123,000 over 3 years.

Team Kevin BrownMark WalshAmy LangridgeDavid Stephens

Measurables MeasurementCurrentActual Cost£41,000 PA£123,000 savings over three years for 3 lines QualityRelies on Two Eye Check Manual input into system Transport & Load issues Two tier delivery system to avoid cross contamination remove unnecessary wastage Safety14 near misses and 1 serious safety breach resulting in employee dismissal Zero accidents and near misses for this task ProductivityTime consuming delivery system safety issues and intensive manual labour Automated delivery system limited labour input.

Deliverables Improve environment, quality, cost & delivery of safety Meet cost saving targets Implement sustainable saucemix delivery process

Cost V Benefit LOW 369 MEDIUM 246 HIGH 123 LOWMEDIUMHIGH COST BENEFIT

Critical success factors Quality acceptance Safety acceptance Ergonomically compliant Buy in from works director Workforce acceptance Union agreement Maintenance engineering Environmental impact Cost saving focus (Labour, Waste & Materials)

Action Plan ItemActionResponsibility Flow processMap out flow processCompleted by team Equipment Cost out and spec delivery system Budget quote received based on one line CommunicationConsult with stakeholders Review Present findings to management DecisionFinalise decision process

Progress Chart

COSTS 156metres travelled studied on Line secs to do this task We estimated costs based on doing this twice an hour Cost per hour: 156m x 2 = 312 metres / per hour 214 secs x 2 = 428 secs per hour (7.1 min per hour) Cost for one shift 312 x 8 = 2,496 metres per shift 7.1 mins x 8 = 56.8 mins per shift Cost per 24 hour period 2,496 x 3 = 7,488 metres per shift 56.8 mins x 3 = mins (2.84 hours per 24 hour shift) Cost for 3 lines for 24 hour period 7,488 metres x 3 = 22,464 metres 2.84 hours x 3 = 8.52 hours Costs for 3 lines for 5 day week 22, 464 x 5 = 112, 320 metres 8.52 hours x 5 = 42.6 hours per week Annual cost 112, 320 metres x 48 = 5, 391, 360 metres or 3,350 miles 42.6 hours x 48 = 2,448 hours per year Based on average day salary of around £9 per hour:2,448 x 9 = £22,032

Potential Estimated Savings Leasing for 4 IBC lifters – £10,000 Training for lifters - £2,000 Maintenance of lifters - £5,000 Labour costs - £22,000 Others (straps, holiday costs, etc) - £2,000 Reduction of accidents / near misses – cost of trained operators, claims, increased insurance premiums Estimated saving of £41,000 per year, over 3 years £123,000

Examples of theory