Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.

Slides:



Advertisements
Similar presentations
Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Advertisements

A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Drip System Approvals: County Perspective October 19, Onsite Water Conference Anne Lowry, REHS Chatham County Environmental Health.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Construction of Facilities Dan Cloak Environmental Consulting Construction Workshop, May 2, 2012.
CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Landscape Pitfalls Myths, Mistakes, and Misconceptions.
Soils Well-designed systems capture sediment near the entrances Sediment loads vary by facility Regular visual checks are the key City of Portland Environmental.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
Making Bioretention Work Sustainability for all the places between the buildings.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Quiz 1 (Use the terms & concepts list in the MESA Day Handbook along with the “Rainwater Harvesting for Drylands” resource book) On-Site Challenge: Water.
E4014 Construction Surveying
What’s New in the Fifth Edition Dan Cloak Environmental Consulting May 23, 2011.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Low Impact Development Best Management Practices
 Development replaces permeable desert with impermeable roofs and pavement  Increases peak and total stormwater discharge  Classical approach: large.
Stormwater Management
Bioretention Design Getting the Details Right. Coordination of Plans Curb elevations, grade breaks, architectural plans consistent with delineation of.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Bioretention soil test demonstration Carlton Thompson and Jeff Cowling.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
C.3 in MRP 2.0 What to Expect (as of March 17, 2015) Dan Cloak.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Sanitary Engineering Lecture 16
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
BUILDING YOUR RAIN GARDEN. Garden Location Where does water flow from? Where does water travel or collect? Observe your yard during a rainfall event.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Design of Stormwater Filtering Systems Center for Watershed Protection
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Rain Gardens Credits- All images in this presentation are from the following manual: Rain Gardens- A How-to Manual for Homeowners Your Personal Contribution.
Low Impact Development Training Module 3: Bioretention System Construction Dennis Chestnut.
To Meet NPDES Retention and Hydromodification Management Requirements Tom Dalziel Program Manager, Contra Costa Clean Water Program Dan Cloak Dan Cloak.
Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Design of Infiltration Practices
Structures Protect Structural Integrity Wood/less durable check dams vs. stone/more durable check dams Green Girl LDS.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Pavement Analysis and Design
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Problem: surface ponding. Solution: surface or subsurface drainage.
Produced by the Northwestern Indiana Regional Planning Commission Community Partnership Produced by the Northwestern Indiana Regional Planning Commission.
The Green Corridor Project
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
For Bioretention Facilities Dan Cloak Environmental Consulting May 23, 2011.
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Basic Hydraulics: Storm Water Management concepts
ASCE LID Conference LID Analysis Considerations in Western Washington November 17, 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
 Holds water in the landscape so it infiltrates (drain) into the ground.
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
SUBSURFACE INFILTRATION VAULTS: PUTTIN’ WATER IN IT’S PLACE OBJECTIVES Water Flow In Vaults STRENGTH ANALYSIS SEDIMENTATION AND INFILTRATION SLOPE FUNCTION.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Design and Construction of Composite Lined Landfills
LIMITING IMPERVIOUS SURFACE COVERAGE USING POROUS TECHNOLOGIES
Green Infrastructure Contractor Training Program 5WKS COST FREE
Central Coast Region Stormwater Control Measure Sizing Calculator
Components of Stormwater Management Systems
WORKSHOP I: Green Infrastructure Overview and Maintenance
Natural Environment: 0% Impervious Surface Built Environment:
Central Coast Region Stormwater Control Measure Sizing Calculator
Presentation transcript:

Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling

Inspecting Construction of Bioretention Facilities

Construction Checklist Include the Checklist in the plans –Suggest getting the checklist on a plan sheet in the plans to give the contractor heads up about what is inspected and when. –Make clear at the pre-construction meeting the steps for inspection. –Have a separate meeting with the contractor and sub-contractors prior to starting the excavation for the bioretention facilities.

Construction Checklist Use checksheet Similar to bldg Workcard Binder or Plans

Construction vs Inspection Sequence

Layout Layout (Certification may be required) Square footage of the facility meets or exceeds minimum shown in Stormwater Control Plan. Site grading and grade breaks are consistent with the boundaries of the tributary Drainage Management Area(s) shown in the Stormwater Control Plan. Preliminary inlet elevation of the facility is low enough to receive drainage from the entire tributary Drainage Management Area(s). Locations and elevations of overland flow or piping, including roof leaders, from impervious areas to the facility have been laid out and any conflicts resolved. Rim elevation of the facility is laid out to be level all the way around, or elevations are consistent with a detailed cross-section showing location and height of interior dams. Locations for vaults, utility boxes, and light standards have been planned so that they will not conflict with the facility. Facility protected as needed from construction-phase runoff and sediment.

Excavation Excavation (Certification may be required) Excavation conducted with materials and techniques to minimize compaction of soils within the facility area. Excavation is to proper area and depth. Slopes or side walls protect from sloughing of native soils into the facility. Moisture barrier, if needed, added to protect adjacent pavement or structures. Native soils at bottom of excavation are ripped or loosened to promote infiltration.

Overflow Inlet/Surface Connection to Storm System Overflow inlet is at specified elevation (typically no lower than two inches below facility rim). No knockouts or side inlets are in overflow riser. Inlet location selected to minimize surface flow velocity (near and offset from inlet recommended). Grating selected to exclude mulch and litter (beehive or atrium-style grates with ¼" openings recommended). Inlet is connected to storm drain via appropriately sized piping. Facility emergency overflow path designed to avoid flood damage.

Underdrain Underground Connection to Storm Drain/Outlet Orifice Perforated pipe underdrain (PVC SDR 35 or approved equivalent) is installed with holes facing down. No filter fabric is installed around the underdrain. Perforated pipe is connected to storm drain (treatment-only) or orifice (treatment-plus-flow-control) per plans. Underdrain pipe is at elevation shown in plans. In facilities allowing infiltration, preferred elevation is above native soil (but low enough to be covered at least 2 inches by Class 2 perm); in sealed planter boxes or bioretention facilities with liners, preferred elevation is as near bottom as possible. Cleanouts are in accessible location(s) and connected via sweeps. Structures (arches or large diameter pipes) for additional subsurface storage are installed as shown in plans and specifications and have the specified volume.

Drain Rock (12” Layer) Rock is installed as specified. Class 2 permeable, Caltrans specification recommended, OR 4"-6" pea gravel is installed at the top of the crushed rock layer. Rock is smoothed to a consistent top elevation. Depth and top elevation are as shown in plans, accounting for depth of soil mix and mulch to follow and required top reservoir depth. No filter fabric is placed between the subdrain and soil mix layers.

Soil Media Mix Soil media mix is as specified. Quality of mix is confirmed by delivery ticket or on-site testing as appropriate to the size and complexity of the job. Mix is installed in lifts not exceeding 12". Mix is not compacted during installation but may be wetted thoroughly to encourage consolidation. Mix is smoothed to a consistent top elevation. Depth of mix (18" minimum) and top elevation are as shown in plans, accounting for depth of mulch to follow and required top reservoir depth.

Irrigation Irrigation system is installed so it can be controlled separately from other landscaped areas. Smart irrigation controllers and drip emitters are recommended. Spray heads, if any, are positioned to avoid direct spray into outlet structures.

Planting Plants are installed consistent with the approved planting plan. Any trees and large shrubs are staked securely. No fertilizer is added. Compost tea may be used. No native soil or clayey material are imported into the facility with plantings. 1" to 2" mulch may be applied following planting. Mulch selected to avoid floating. Maintain final design elevation of soil mix following planting. Curb openings are free of obstructions.

Final Engineering Inspection Drainage Management Area(s) are free of construction sediment; landscaped areas are stabilized. Inlets are installed to provide smooth entry of runoff from adjoining pavement, have sufficient reveal (drop) from the adjoining pavement to the top of the mulch or soil mix, and are not blocked. Inflows from roof leaders and pipes are connected and operable.

Final Engineering Inspection (Cont’d) Temporary flow diversions are removed. Rock or other energy dissipation at piped or surface inlets is adequate. Overflow outlets are configured to allow the facility to flood and fill to near rim before overflow. Plantings are healthy and becoming established. Irrigation is operable. Facility drains rapidly; no surface ponding is evident. Any accumulated construction debris, trash, or sediment is removed from facility.

Construction Material Submittal

Class II Perm

Soil Submittal

ProgressiveBioretention Area under Construction

SOB Bioretention Area under Construction

Bioretention during storm Bullet 1 Bullet 2

LDS bioretention during storm

Bioretention Area City Hall Downspout

Vic Stewarts Bioretention Area