The information contained in this document is highly confidential and privileged. No part of this document may be copied or circulated without express.

Slides:



Advertisements
Similar presentations
The 4 T’s of Test Automation:
Advertisements

Test Yaodong Bi.
An Introduction to Endeavor Commerce History:Sage Premier Technology Partner since 2002, 2007 Endorsed Technology Partner Mission:Extending fast, accurate.
Web Development Engineering Processes Introduction to Web Development Outsourcing Processes.
Test Automation Success: Choosing the Right People & Process
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
> 10 May 2015 > Presentation to Abhiman Ghanshyam Business Development Manager Innovant Consulting Automated Testing.
Technical Communication Anupama Gummaraju - as a service in the IT consulting industry.
Roadmap to Continuous Integration Testing and Benefits Gowri Selka, Walgreens Natalie Koltun, Walgreens May 20th, 2014 ©2013 Walgreen Co. All rights reserved.
© Copyright 2014 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Accelerated Testing in.
REMINDER Check in on the COLLABORATE mobile app Purchasing Approvals Functionality and Best Practice Prepared by: Ed McDonough Director, Solution Delivery.
Development Processes UML just is a modeling technique, yet for using it we need to know: »what do we model in an analysis model? »what do we model in.
Copyright © 2009 Rolta International, Inc., All Rights Reserved a c c e l R12™ Upgrade Approach.
Web Service Testing Solution Accelerator
Introduction to Software Testing
Understanding of Automation Framework A Storehouse of Vast Knowledge on Software Testing and Quality Assurance.
Raj Bank Universal Core Banking System FCBS LabsInnova Info Technology Ltd. Banking Systems & Consulting
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
NYC Technology Forum Introduction to Test Automation 11/2/07 All rights reserved Not to be reproduced without permission Bill Rinko-Gay Solutions Director,
Copyright © Panaya Oracle ® E-Business Suite Testing: How to Get Your Business Users On-Board Amir Farhi Director, Product Marketing.
Survey Programming Capabilities. Survey Programming In Datamatics, Survey Programming (SP) team constitutes experienced programmers who have extensive.
Effective Methods for Software and Systems Integration
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Automation Fundamental Concepts &
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Copyright 2013, Net.Orange, Inc. All rights reserved.Confidential and proprietary. Do not distribute without permission. Net.Orange App Development Net.Orange.
1 11-Jul-08 COPYRIGHT NOTICE Copyright © 2008 Polaris Software Lab Limited All rights reserved. These materials are confidential and proprietary to Polaris.
Testing – A Methodology of Science and Art. Agenda To show, A global Test Process which work Like a solution Black Box for an Software Implementation.
RUP Implementation and Testing
Rational Unified Process Fundamentals Module 4: Disciplines II.
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph.
Maintenance and Support Week 15 CMIS570. User Training Need to consider the same 2 groups: End users Use the system to achieve the business purpose Creating,
Maintenance and Support Week 15 CMIS570. User Training Need to consider the same 2 groups: End users Use the system to achieve the business purpose Creating,
Building Hotel reservation System !!! The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
TM Copyright © 2009 NMQA Ltd. Behaviour Driven Testing with.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
Confidential Continuous Integration Framework (CIF) 5/18/2004.
July, 2008 Impati – Software Test Solutions. July, Contents Testing Service Overview and Approach Test Services and Industries Key Services Offering.
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Model Based Testing implementing with tools Ruud van Houwelingen 1 December 2, 2009.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
Software Testing Process
ITC Software ITC AUTOMATION TESTING SERVICES Date (Day Month, Year) Place (City, Country)
SPECTO IT TRAINING Contact us: INDIA: , USA : ,
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
RSA Professional Services RSA SecurID Solution Design and Implementation (D&I) Services.
Project Execution Methodology
ITIL: Service Transition
Engaging Business Analysts in Test Automation
Methodologies and Algorithms
BA Continuum India Pvt Ltd
Understanding of Automation Framework
DEFECT PREDICTION : USING MACHINE LEARNING
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
SENIOR MANAGER - SOFTWARE TESTING PRACTICE
E2E Testing in Agile – A Necessary Evil
Advantages OF BDD Testing
Introduction to Software Testing
MBML_Efficient Testing Methodology for Machine Learning
Automated Testing and Integration with CI Tool
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
IT and Development support services
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
Open Source Tool Based Automation solution with Continuous Integration and end to end BDD Implementation Arun Krishnan - Automation Manager Maria Afzal-
Training 01: Project Lifecycle & Business Technology Analysis
Open Source Tool Based Automation solution with Continuous Integration and end to end BDD Implementation Arun Krishnan - Automation Manager Maria Afzal-
Presentation transcript:

The information contained in this document is highly confidential and privileged. No part of this document may be copied or circulated without express written permission from Anantara Solutions Pvt. Ltd. This document is for discussion purposes only. Test Automation of SCON Test Automation of SCON - Project Proposal Anantara Solutions Private Limited

Table of contents 1. About Anantara2. The Business Landscape3. Business Problem4. Proposed Solution5. Project Requirements6. Similar Accomplishments7. Our Approach8. Proposed Schedule9. Assumptions and Risks10. Deliverables Summary11. Deliverables from Siemens12. Proposed Team for Phase-1 2 Copyright Anantara Solutions Private Limited All rights reserved.

About Anantara  <> 3 Copyright Anantara Solutions Private Limited All rights reserved.

The Business Landscape SAP 41 (Main Manufacturing) SAP 41 (Main Manufacturing) M.C.M. SHARE (Oracle Siebel) SCON Configure VB App E-Commerce Country Specific Instances of SAP SAP 40 - USA SAP 45 – Germany SCON: Quotation Generation application uses complex algorithm for various product types; details fetched from SHARE

The Business Landscape SAP system maintains all details of products and prices Diagrams & Literature are maintained in MCM, which provides the data to e- commerce website & the SHARE Siebel system Siebel system manages quotations through SCON, a VB application SCON is driven by complex and detailed logic for quotations, which has validation requirements

The Business Problem Logic is complex in SCON quotation module 60-70% of the changes impact SCON Around 200 test cases in SCON, low test coverage per release cycle 60-75% effort of new releases goes into validation of quotations Long cycle time for Manual Test Runs of highly business-critical system Complete manual regression testing of SCON not achieved usually 6 Copyright Anantara Solutions Private Limited All rights reserved.

Proposed Solution Phased approach towards automation of SCON regression testing Phase1 Pre-POC Understand the requirements in detail and develop automation plan Phase2 POC Develop a proof-of- concept demonstrating the identified test cases Phase3 Project Develop the test automation framework and deliver the complete solution for regression testing of SCON 7 Copyright Anantara Solutions Private Limited All rights reserved.

Project Requirements Understand the ecosystem involving SAP-MCM-Share-SCON Develop understanding of quotation logic using onsite interactions and documentation Identify complete list of test scenarios with prioritiesValidate existing order management systemDesign automation solution for regression tests of SCON Deploy data generation for quotation module, which is complex and has extensive testing cycles Handover of automation solution to Siemens with detailed training artefacts

Our Approach: Pre-POC to Project Initiation Pre-POC (2-3 consultants working onsite for 3 weeks) Study the requirements, environment and identify tests to be automated Will cover requirement analysis and designing the approach for POC Deliverable: Proposal presented for the POC phase Proof Of Concept (offshore team over approx. 10 weeks) Automation solution development of identified POC tests Test automation environment set up, and automation approach finalized Deliverable: Demonstration of identified paths for automation Project (offshore team with onsite coordinator) Implementation of automation for complete set of test cases Cost of consulting plus expenses Deliverable: complete solution with extensive training videos

Our Approach: Pre-POC to Project Initiation 10 Copyright Anantara Solutions Private Limited All rights reserved.

Proposed Pre-POC phase schedule 11 Copyright Anantara Solutions Private Limited All rights reserved.

Assumptions and Risks Assumptions Current state of defects to be provided along with the system Parallel development will be minimum during automation development Availability of SMEs, documentation and stage data for automation development Risks Variations in planned scope of POC or project can impact timelines Access to Siemens environment for offshore team Availability of Siemens team for regular review of progress 12 Copyright Anantara Solutions Private Limited All rights reserved.

Deliverables Summary Pre- Phase Complete requirement analysis Identification of apt automation tool Identification of automation methodology Identification of test cases for POC Definition of POC objectives and scope POC Demonstration of test scenarios identified Methodology for complete automation Project Plan with estimates and list of identified test cases Project Complete automation of identified scenarios Documentation of automation usage 13 Copyright Anantara Solutions Private Limited All rights reserved.

Deliverables from Siemens Training/ demonstration on: SCON functionalities Logic of quotation- generation Integration with SHARE and other systems Availability of:Availability of: Subject Matter Experts Documentation Source code Top management buy-in for: Automation tool to be used Automation approach 14 Copyright Anantara Solutions Private Limited All rights reserved.

Case Study 15 Copyright Anantara Solutions Private Limited All rights reserved. SIMILAR BUSINESS CHALLENGE Configuration driven AUT - 3 million test flows - New flows with every new customer/study - Manual testing causing business loss - Complete coverage through manual testing impossible - Long regression test cycles SIMILAR BUSINESS CHALLENGE Configuration driven AUT - 3 million test flows - New flows with every new customer/study - Manual testing causing business loss - Complete coverage through manual testing impossible - Long regression test cycles TEST AUTOMATION DESIGNED FOR AUTReduced testing cycle from 6 weeks to 5 days per releaseSaves 3 person years of test effort per yearTotal savings in testing costs USD 1.2 million at current rateSolution adapts to customizations (Self-navigation feature)Executes test-flows automatically for all regression/study testsGenerates test data on the flyCovers both positive and negative testsExecutes comprehensive workflow branches and conditional testsCreates XML based reports – compatible with web/MS * References available on request

Our Team for Pre-POC Deepak Mehta Principal Consultant 16+ years experience in test strategy design, planning and execution PMP Certified, rich experience in Consulting, project planning and execution Hands-on with multiple technologies with specific expertise in systems integration, test automation, & system design 16 Copyright Anantara Solutions Private Limited All rights reserved.

Our Team for Pre-POC Amit Kulshrestha Senior Consultant 11+ years experience in test strategy design, planning and execution Adept in requirement analysis and solution designing Expertise in functional test automation, database testing, manual testing Development experience with VB 6.0 Hands-on with QTP, WinRunner, Test Complete Exposure to performance testing of web applications 17 Copyright Anantara Solutions Private Limited All rights reserved.

18 Thank you Helping You Compete Better ! Copyright Anantara Solutions Private Limited All rights reserved.