Project Title; Capacity Building for Establishment of Criteria and Indicators (C&I) of Sustainable Forest Management (SFM) in DPR Korea.

Slides:



Advertisements
Similar presentations
19-20 September 2013, IBGE, Rio de Janeiro, Brazil
Advertisements

Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
GEF PROJECT TEMPLATES ANDGUIDELINES George Manful (PhD) Senior Task Manager, Climate Change UNEP UNFCCC Asia and Pacific Regional Workshop on Preparing.
INTRODUCTION Organogram of DoF My role In the Department of Forestry
Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites description the 2 nd PP meeting Portugal, 8-10 July 2013 Hydro-Engineering.
Inita Paulovica Deputy Resident Representative Turkmenistan.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
International Cooperation in China’s Poverty Reduction Jiang Xiaohua Director General Foreign Capital Project Management Center Of LGOP October 19, 2007.
Katoomba Group Training Initiative Climate Change, Markets and Services Welcome and Introduction Course Introduction and Guidelines Participant Introduction:
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
U. S. Support for National Communications Susan Wickwire U.S. Environmental Protection Agency June 9, 2003.
Korea Energy Economics Institute Country Experiences in Mitigation Assessment : Republic of Korea SUYI KIM.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
UNFCCC Workshops on Synergies and Cooperation with other Conventions Espoo, Finland, 2-4 July 2003 Biological Diversity Perspectives David Cooper, CBD.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Quality Assurance at the University St. Kliment Ohridski Elizabeta Bahtovska National Bologna promoter TEMPUS SCM C-032B06 West Balkan Bologna Promoters.
IUCN projects to support biodiversity in forests of Central Europe Piotr Tyszko, Ph.D. Project Officer IUCN Office for Central Europe.
CONTENTS Introduction Introduction Changes in Forest Cover Changes in Forest Cover Reforestation Reforestation Community Forestry Community Forestry Forest.
Adaptation in Eastern and Southern Africa Supporting ground level and policy change Jo-Ellen Parry, Program Manager
Reducing Vulnerability at the Community Level Jo-Ellen Parry, Program Manager Adaptation in Eastern and Southern Africa.
The State of the World’s Forest Genetic Resources The Global Plan of Action FAO
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 Capacity Development for Policymakers,
Zin Myo Thu Programme Coordinator FAO Myanmar The Outcome of the Project TCP/MYA/3204.
In the Name of God, Most Gracious, Most Merciful.
Dr. Howard Nelson Biodiversity Specialist Ministry of Planning, Housing and the Environment Trinidad and Tobago.
Institutional Evaluation of medical faculties Prof. A. Сheminat Arkhangelsk 2012.
Forest Policy, other instruments and NLBI Rekha Pai (IGF) MoEF.
Peter Gondo. Session1: INTRODUCTION TO THE NLBI/FOREST INSTRUMENT BACKGROUND AND ORIGIN OF THE NLBI PURPOSE OF THE NLBI G UIDING P RINCIPLES OF THE NLBI.
GEF IN TAJIKISTAN Dr. Neimatullo SAFAROV CBD and CPB National Focal Point Republic of Tajikistan.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Update from the International Blue Carbon Policy Working Group 1 st workshop July, 2011 J. Tamelander.
Session 4 Mainstreaming Climate Change Adaptation and Biodiversity Conservation in National, Sectoral and Donor Strategies.
United Nations Environment Programme Regional Cooperation and Coordination Experiences Marieta Sakalian Programme Management/Liaison Officer Biodiversity.
3rd GEF ASSEMBLY « Prioritization and identification of national priorities under the RAF: the experience of Cameroon » By: Justin NANTCHOU NGOKO GEF Operational.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
RECALL Resilient European Communities Against Local Landslides KICK OFF MEETING Projects selected under the 2014 Call for Proposals for Prevention & Preparedness.
SEVERAL ISSUES OF CAPACITY BUILDING FOR CDM IN RESEARCH AGENCIES AND UNIVERSITIES Mr. Nguyen Mong Cuong Institute of Meteorological and Hydrology Mr. Bui.
20 February 2009 Tanzania Natural Resource Forum Carbon-Forestry Working Group 1 Conceptual and Practical Challenges in the Operationalization of REDD.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Revisions Proposed to the CIS Plan by the Global Office Misha V. Belkindas Budapest, July 3-4, 2013.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
Presented at UNCCD COP12, Ankara, Turkey by the Land Degradation Focal Area Team Global Environment Facility GEF-6 Programming Update & UNCCD Enabling.
R-PLAN and REDD activities Review Lao PDR Flag of your country.
1 FOREST MONITORING IN THE CONTEXT OF CLIMATE CHANGE Don Wijewardana United Nations Forum on Forests Secretariat.
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
The Global Forest Resources Assessment 2010 (FRA 2010) Mette L. Wilkie, FAO.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Research Activities in Response to IPCC TAR John Christensen UNEP.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
1 National Risk Assessment Workshop April 30, 2013 Korea Adaptation Center for Climate Change.
Introduction to Malawi REDD+ Process and Outlook
Kenya’s REDD+ Readiness Activities
Sustainable Development Goals (SDGs) and implications for South Africa
The French National Agency on Water and Aquatic Environments
Overview Rationale Context and Linkages Objectives Commitments
The Urban Forest Management Plan
QUANTIFYING TROPICAL WETLAND BIOMASS AND CARBON STOCKS
EU Biodiversity Strategy to 2020 Towards implementation & monitoring
AN INTRODUCTION TO THE IUCN RED LIST OF ECOSYSTEMS
Civil Protection Financial Instrument – Prevention Projects
Helene Skikos DG Education and Culture
Overview Rationale Context and Linkages Objectives Commitments
United Nations Voluntary Fund on Disability (UNVFD)
Country Experiences in Mitigation Assessment : Republic of Korea
Forest and Landscape Restoration (FLR)
Presentation transcript:

Project Title; Capacity Building for Establishment of Criteria and Indicators (C&I) of Sustainable Forest Management (SFM) in DPR Korea

Background Forest areas have rapidly decreased during 1990~2005 due to the shortages of food and energy, and not less forest had been deforested and degraded. The form of deforestation /forest degradation decrease in forest land area is tree stocking, land plant cover, soil organic matter and field moisture-holding capacity, serious soil erosion and landslide, soil drying and compaction, destruction of food chain

The form of deforestation /forest degradation Decrease of adaptation capability to the abnormal climate phenomenon due to climate change The influence of deforestation /forest degradation Continuation of the loss, segmentation, isolation and qualitative deterioration of habitats due to degradation /destruction of forest ecosystems The main factor of deforestation /forest degradation the shortage in the capacity for sustainable management of forest resources and in the financial resource

Justification The Branch of Forest Science (BOF), State Academy of Science as one and only national organization responsible for forest science The task of Branch of Forest Science assurance of successful scientific forest policy-making and its performance nationwide and provision of scientific and technological information on tree breeding, tissue culture, establishment and management of economic forests, mechanization of forestry, afforestation and reforestation, forest protection, forest ecosystem management and organizing of forest management. The composition of Branch of Forest Science 7 central institutions, one doctoral course and 4 local institutions

The Institute of Forest Management (IFM) as an affiliated organ of BOF The composition of IFM 7 departments (nursery, seedling growing, forest ecosystem management, afforestation/reforestation, watershed management, reorganizing forest management and digital forest comprehensive analysis,), 6 pilot forests and 150 members The experiences in international corporation - The run of technical cooperation program FAO/TCP/DPR/0169(A) as a qualified national expert for modeling and demonstration of participatory integrated watershed management under the aid of IUFRO and FAO - The assessment of mitigation function of forest in drawing of the second national report on climate change under the aid of UNEP and the registration of Mt. Paekdu Biosphere Reserve to International Biosphere Reserve

The topics of IFM - Development of the strategy for restoration and management of disturbed/degraded forests - Building-up a forest management information system, - Solution of scientific and technological problems rising in the establishment of scientific and advanced framework of national SFM strategy The problem of IFM - The research work on the development and adoption of forest certification scheme, assessment of forest value and establishment of early-warning system in watershed level and mitigation methodology is only on the search step. - The financial and equipment shortage has been a big problem in the foundation of new research department that will take charge of the SFM study and in the doing of detailed research depending on the advanced approach.

Goal and objective establishing SFM information center and making it as a dissemination base to collect and analyze the advanced world scientific achievements on SFM as soon as possible and present scientific and technical methods for dissemination nationwide.

Outcome and Action Outcome 1 Establishing of SFM information center with powerful brain/hardware capacity in IFM, Forest Science Branch, SAOS, DPR Korea. Activity scientists capable of SFM research to be elected. Activity 1.2 An office for the SFM research to be supplied with. Activity 1.3 1st international training to be taken place on the selection, survey and monitoring of SFM C&I s. Activity 1.4 Justification of 7 Montreal process Criteria to be consulted. Activity 1.5 Justification and applicability of 67 Montreal process Indicators to be consulted. Activity ha of demonstration site to be selected in the Taedong county, South Pyongan province, western low-land region of DPR Korea, in which SFM C&I s are practically measurable. Activity 1.7 Equipments necessary for SFM C&I measurement to be procured Activity 1.8 1st national workshop to be taken place for the development of SFM C&I s.

Outcome 2 SFM C&I s to be surveyed, and demonstration base to be established in the demo-site for the SFM in the low- land region, and the guideline to be made Activity 2.1 Assessment of biomass in the project site tobe conducted. Activity 2.2 Assessment of greenhouse gas sequestration and emission in the pilot site to be conducted in accordance with the IPCC guideline on the forest soil and biomass respectively, and errors by forest kind to be corrected through on –the-site survey, and guideline to be made. Activity 2.3 Biodiversity assessment to be conducted and conservation and management measures to be taken in the site. Activity 2.4 Forest value of the pilot site to be assessed and the guideline to be made. Activity2.5 Advanced management system on the sustainable management approach to be established in the pilot and its proposal to be submitted. Activity 2.6 The report to be made on the current state and priority of SFM in the pilot site.

Outcome 3 collection and analysis to be conducted of worldwide advanced science and technology information for solving fuels and food necessary for livelihood of rural people, while restoring and managing forest ecosystem, and the report to be made. Activity 3.1 2nd international training to be taken place on the advanced approaches to the restoration of forest ecosystem. Activity 3.2 reasonable ecosystem restoration models to be developed on the principle of silvo-agro, silvo-herb linkage to meet the need of forest ecosystem restoration and the inhabitants. Activity 3.3 tree species to be selected and planted according to the reasonable silvo-agro, silvo-herb model in the pilot site. Activity 3.4 the reasonable management method to be selected and the management to be implemented according to the model in the pilot site. Activity 3.5 2nd national workshop to be held and the report to be submitted on the restoration of forest ecosystem in the western low- land region.

Outcome 4 capacity-building for the international approaches to the establishment of early-warning system for disaster prevention in the watershed, to the adoption of forest certification scheme, and to the assessment of forest ecosystem value to be enhanced. Activity 4.1 3rd international training to be held on the advanced model for the forest ecosystem value assessment that has recently been used worldwide. Activity 4.2 advanced SFM technologies to be propagated and awareness-raising activities to be enhanced through local research bodies and technology propagating bodies and publications.

Sustainability of the action The role and involvement of all stakeholders Beneficiaries/associat es, stakeholders PositionRole/Activities IFM Direct beneficiaries Development of SFM C&I s and Establishing SFM assessment system Establishing early-warning system against natural disasters and demonstrating mitigation methodologies Developing and renewing of forest value assessment models Dissemination and technical guidance of advanced eco-friendly techniques Capacity building and writing for awareness raising Forest management organizations Indirect final beneficiaries Consulting and organizing to apply results in action site State Academy of Sciences associate Organizing to implement the action under the close connection with the government

Risk analysis The action could be successfully implemented under the following assumption. –The action will be approved. –The close contact between applicant, partners and sub- contractors will be provided. –The research capacity for the new technology will be enhanced. –Financing activities of donors to be determined for the successful implementation of the project. –The equipments for the action performance will be offered and technical training and study tour etc. are carried out through the steering instrument. –The equipments and buildings will be provided to beneficiaries and assure the action sustainability. There would be some risks for action implementation: - Physical risks; Weak technical capacity and physical capacity to O & M new equipment and to supply some spare parts for the action sustainability.

- Environmental risks; - Political risks; - Economic risks; The finance, manpower, material and equipments may be restricted without preceded planning. Difficult to purchase all the equipments and materials at the action site. Difficult to keep the delivery date of equipment and materials from aboard. - Social risks ; Difficult to ensure the action sustainability without providing purchased equipments and buildings to associates Weaken connection with education, publication, reporting and technique diffusion organizations as to be attention of performance in the action site

Measures for risk mitigation and sustainability To minimize the physical/economic risks; Performed activities for capacity building of researchers based on the pre-planning To minimize the environmental risks To minimize the political risks; To minimize the social risks; - Arrangement of O & M team responsible and their capacity building should be included in the action. - Ensure to transfer ownership of purchased equipments and buildings to associates and final beneficiaries - Planning the data collection and edition for guideline on new applied techniques and site reporting, introducing widely the achievement/experience through all kinds of publications, academic symposium and visit, and express these on policy making as form of advise - Expect that unwilling contents including natural disaster, the assumptions, risks, and measures mentioned in the sustainability can be controlled by the action applicant, associate and stakeholders and have enough possibility for implementation. - The unexpected aspects in the concept not can be revised and supplemented while developing the detained action document.

Estimated Budget №Cost 1Human resource 2Travel 3Equipment and supplies 4Local office 5Other costs, services 6other 7Sub-total direct eligible cost of the Action(1-6) 8Provision for contingency reserve(maximum 5% of 7, subtotal of direct eligible costs of the Action ) 9Total direct eligible costs of the Action(7+8) 10Administrative costs(maximum 7% of 9, total direct eligible costs of the Action) 11Total eligible costs(9+10)