NATHAN BLACKETER JEFF MORRIS BRIAN WILDER The Great Plains Lions Eye Bank.

Slides:



Advertisements
Similar presentations
Project Management with VIVA PPM Tool (Project Portfolio Management)
Advertisements

Project Management Concepts
A Short Course in Project Management
Facilitated by Joanne Fraser RiverSystems
SharePoint Project Management. EPM Live provides Microsoft-Base Project Management solutions that allow individuals, teams, workgroups, and organizations.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
What is a project? Project Management Institute definition
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Chapter 3: The Project Management Process Groups
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Management and Scheduling
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
EPM Live – Positioning for Enterprise Project Management Presented by: Sasha Lomas, PMP ASL InfoTech inc. March 3, 2010.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Systems Analysis and Design in a Changing World, 6th Edition
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
L545 Systems Analysis & Design Week 4: September 23, 2008.
Project Management Process Overview
IT Project Management Cheng Li, Ph.D. August 2003.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
The Project Plan IT Project Management COSC
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Basic of Project and Project Management Presentation.
Chapter 13 Software Project Management. Project Management “Process” Why do we need project management? Why can’t we just follow one of the software development.
Upgrade to a Web-Based System for OSU Transportation Services.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Project Life Cycle.
Starting Comparing different projects that need to be done in the company Make project selection: Coding Performance Improvement Project.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
Final Presentation Prepared by: Arezoo Gazerzadeh Syed Ahmed Floyd J. Srubar Damian Ottley Ramakrishna Gudikandhula.
Project Goal Criterion 1  Cost-Cost Estimation  ROI = %  Net Present Value at Store Level=14,  Starts Paying Back in Third Year of Installation.
Project Launch Presentation. Overview  Group Members: Joshua Booth Jiajia Jiang Weijuan Shi  Client: G & T Security.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
What is project management?
Project Management.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
Chapter 2 Project Management Methodologies. A project life cycle PlanDesignDevelop Integrate (including test) DeployMaintain They can be iterative and.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
How Project Management Tool Helps Sticking To Basic Project Management Principles  Organizations can consider using project management tool to facilitate.
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Project Management PTM721S
Workplace Projects.
Systems Implementation,
CIS 348 MENTOR The power of possibility/cis348mentor.com
Systems Analysis and Design
CIS 517 RANK Lessons in Excellence-- cis517rank.com.
CIS 210 Systems Analysis and Development
Project management Learning Unit 5.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

NATHAN BLACKETER JEFF MORRIS BRIAN WILDER The Great Plains Lions Eye Bank

Definition & Conceptualization

What We Did Analyzed potential business with problems Analyzed potential solutions for problems GPLEB was selected as client  Identified business need  GPLEB stakeholder meeting  Develop feasible solution

Problem GPLEB filing system  Bulky, inefficient  Wastes time, space, resources GPLEB statistical method  Numerous logs  Manual tallies

Solution BMW custom software solution  Relational Database  Web-based Reporting  One-click reporting  PDF format Documentation  Generation of necessary chart work  Secured on server

Benefits Expected Streamline Operations Increase accuracy Improved efficiency

Planning & Budgeting

What We Did Conducted stakeholder interviews Presented Project Proposal Assigned resources based on work load Secured 50% of budget Utilized Agile Methodologies Successful Phase Completion

Methodology

WBS

Tracking Gantt Chart

Progress Tracking

Network Diagram

Budget Task NameCost Eye Bank System$19, Implementation$14, Documentation$3, Training$800.00

Break-even Analysis

Execution & Control

What We Did Utilized Open-Source Software Existing server utilized Existing OS utilized  Started with LAMP  Ended with WAMP Implemented eRaider

Technology Applied Custom Web-based software solution  WAMP setup  CakePHP  MVC model Weekly and Daily Backups  Local and external servers  Amazon S3 services PDF Reports  Daily, Weekly, Monthly and Yearly reports  Local, State, and National Reports  FPDF

Progress to Date Working prototype Daily SCRUM meetings 100 % client acceptance thus far Analysis stage complete Starting Implementation

Earned Value Analysis

Status About 6 days into project TAC: 32 days total ETAC: 46.5 days Project Behind Schedule  SPI: 0.69 Project Under Budget  CPI: 1.001

Termination & Closure

What We Will Do Finish up Implementation phase Create Documentation Conduct Training Distribute Acceptance Testing

Updated Completion Date Should have 26 days left Currently, more like 40 days Estimated Finish Date: May 26, 2009

Lessons Learned Microsoft Project Planning Stakeholder signatures Team member cooperation