PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
CHAPTER 17 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Developing a Project Plan
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
WEEK 15A – PROJECT MANAGEMENT (CHAPTER 3) Characteristics, tools, Pert/CPM, critical path, slack calculation, crashing SJSU Bus David Bentley1.
18-1Project Management Chapter 18 Project Management.
MGMT 483 Week 8 Scheduling.
1 Operations Management Lesson 5 Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Operations Management
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Project Management Techniques.
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
Project Management Chapter 17.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Operations Management
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
CHAPTER EIGHTEEN Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
18-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
17 Project Management.
Projects: Critical Paths
17 Project Management.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Stevenson 17 Project Management.
Project Management Chapter 17
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Presentation transcript:

PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM

What is Project? What is the different between normal business activities and Project? Project Unique, one time operations design to accomplish a specific set of objectives in a limited time frame.

Examples of project… 1. Building a house 2. Building a factory 3. Add assembly line in the factory 4. Merging to companies 5. Managing political campaign 6. Designing a new product 7. Soft ware development

Work Breakdown Structure Program Project 1Project 2 Task 1.1 Subtask Work Package Level Task 1.2 Subtask Work Package

u What are the tools? –Work breakdown structure –Network diagram –Gantt charts –Risk management

Key Decisions u Deciding which projects to implement u Selecting a project manager u Selecting a project team u Planning and designing the project u Managing and controlling project resources u Deciding if and when a project should be terminated

Project Manager Responsibility WorkQuality Human ResourcesTime CommunicationsCosts

Project Control: Gantt Chart Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Time a b a b c c d d d

17-9 PERT and CPM PERT: Program Evaluation and Review Technique CPM: Critical Path Method u Graphically displays project activities u Estimates how long the project will take u Indicates most critical activities u Show where delays will not affect project

17-10 The Network Diagram u Network (precedence) diagram – diagram of project activities that shows sequential relationships by the use of arrows and nodes. u Activity-on-arrow (AOA) – a network diagram convention in which arrows designate activities. u Activity-on-node (AON) – a network diagram convention in which nodes designate activities. u Activities – steps in the project that consume resources and/or time. u Events – the starting and finishing of activities, designated by nodes in the AOA convention.

17-11 The Network Diagram (cont’d) u Path –Sequence of activities that leads from the starting node to the finishing node u Critical path –The longest path; determines expected project duration u Critical activities –Activities on the critical path u Slack –Allowable slippage for path; the difference the length of path and the length of critical path

17-12 Project Network – Activity on Arrow Locate facilities Order furniture Furniture setup Interview Hire and train Remodel Move in Figure 17.4 AOA

17-13 Project Network – Activity on Node Locate facilities Order furniture Furniture setup Interview Remodel Move in 4 Hire and train 7S Figure 17.4 AON

17-14 Network Conventions a b ca b c a b c d a b c Dummy activity

Questions answered by PERT/CPM 1. When will the entire project be completed? 2. What are the critical activities or tasks in the project, that is, the ones that will delay the entire project if they are late? 3. Which are the non-critical activities, that is, the ones that can run late without delaying the entire project’s completion? 4. What is the probability that the project will be completed by a specific date?

Questions answered by PERT/CPM 5. At any particular date, is the project on schedule, behind schedule, or ahead of schedule? 6. On any given date, is the money spent equal to, less than, or greater than the budgeted amount? 7. Are there enough resources available to finish the project on time? 8. If the project is to be finished in a shorter amount of time, what is the best way to accomplish this at the least cost?

To Find Critical Path ??? To find the critical path, need to determine the following quantities for each activity in the network: 1. Earliest start time (ES): the earliest time an activity can begin without violation of immediate predecessor requirements. 2. Earliest finish time (EF): the earliest time at which an activity can end. 3. Latest start time (LS): the latest time an activity can begin without delaying the entire project. 4. Latest finish time (LF): the latest time an activity can end without delaying the entire project.

CPM with Three Activity Time Estimates

Expected Times