One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Rapid Infrastructure Development/Enhancement (RIDE) Dr. Albert J. Bush, III.

Slides:



Advertisements
Similar presentations
Actions and Retrofit of Post Earthquake-Damaged Bridges
Advertisements

No. 7 of 19 Soil Stabilization and Base Reinforcement by Ryan R. Berg, P.E. The information presented in this document has been reviewed by the Education.
Jimmy E. Fowler Coastal and Hydraulics Laboratory
No. 18 of 19 Geosynthetics in Asphalt Pavements by Prof. S.F. Brown FEng University of Nottingham The information presented in this document has been reviewed.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Airfields and Pavements Research Overview J. Kent Newman, Phd.
GEOTECHNICAL ENGINEERING Session 07 Subject: S0012 / Introduction to Civil Engineering Year: 2007.
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
April 16, 2014 Carmeuse Lime & Stone, Inc. – Rail Industrial Access Project 1 Rail Industrial Access Program Application Briefing.
POWERPOINT PRESENTATION
Roads. Existing pavement design methods cater to relatively high volumes of traffic with damaging effect quantified in terms of ESA (equivalent standard.
Trestle Rebuilds The Continuing Quest to Fill the Gap
Warehousing Decisions
Global City Teams Challenge Funding Opportunities.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
CONCRETE PROTECTION MATERIALS & TECHNIQUES CE 402 DONE BY AHMED AL-HAWAS FAYEZ AL-SAIKHAN.
FRP Reinforcement of Concrete
Fiber-Reinforced Polymer (FRP)
Foundation Engineering CE 483
FOUNDATION.
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
Approaches to Historic Bridge Rehabilitation Case Study #4
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
REPAIRS AND REHABILITATION OF STRUCTURES UNIT – II
1 Pavement Lifting & Soil Stabilization Control SOIL STABILIZATION, LIFTING OF PAVEMENT STRUCTURES AND UNDERGROUND INFRASTRUCTURE REPAIRS USING DEEP INJECTION.
Sustainability/Logistics – Transportation and Distribution Management (4b) Technology Enabled Capability Demonstration Alan Santucci
A swinging cable and wooden plank bridge in a New Zealand rain forest.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Early Performance of Concrete Pavement Overlays in Minnesota Tom Burnham, P.E. Minnesota Department of Transportation 15 th Annual TERRA Pavement Conference.
BUILDING STRONG SM Portland District Flood Damage Reduction Making Stormwater Management Systems Reduce Flood Damages D. Leslie Miller, P.E. Flood Preparedness.
Shellpot Bridge Agreement: A Case for Public-Private Cooperation A web presentation by Michael Kirkpatrick, Planner III, Delaware Dept. of Transportation.
EPA Infrastructure Pvt. Limited
Design Considerations for a Lightweight Modular Causeway Section (LMCS) James N. Pratt Coastal and Hydraulics Laboratory US Army Engineer Research and.
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Dr. Jimmy E. Fowler Dr. Jimmy E. Fowler Coastal and Hydraulics Laboratory Army Engineer Research and Development Center (601)
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
980th Engineer Battalion LTC Jeffrey Hartsell CSM Thomas Champion
US Army Corps of Engineers BUILDING STRONG ® CORPS OF ENGINEERS Alaska District - Partner Projects Julie Anderson, PE Alaska District Corps of Engineers.
USE OF GEOGRIDS IN FLEXIBLE PAVEMENT
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Airfield Damage Repair (ADR) 1.
Previous Slide TRADOC DCSINT Office of the Deputy Chief of Staff for Intelligence U.S. Army Training and Doctrine Command TRADOC DCSINT.
Road Investment Decision Framework
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
GEOTECHNICAL ENGINEERING Session 07
Resistance and Tractive Effort
Bridge Pile Foundation Evaluation for a Soil Remediation Project
CONCRETE PROTECTION MATERIALS & TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Gulf Coast (and Florida) Transportation Recovery With Dale McClung, Director of Design Solutions September 13, :15 PM.
Transportation.
U.S. Army Engineer Research and Development Center’s APT Research
Transportation Engineering-II
Transportation, Distribution, and Logistics
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Construction Management & Inspection
Adjustments required for program or funding changes Options
HVS Testing at ERDC – Last Five Years
Materials Innovation Hub Challenge Martin Richardson
Steering Committee Brief to the DoD M&S Conference 2008
Louisiana Accelerated Pavement Research Facility
Presentation transcript:

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Rapid Infrastructure Development/Enhancement (RIDE) Dr. Albert J. Bush, III

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Sealift in Force Projection is Limited By Lack of Adequate Port Facilities Sealift is Required for Large Throughput Volumes and Force Sustainment PROBLEM General: Infrastructure Problems: Existing Ports May Have Limited Infrastructure (Demand>>>Capacity) Links to Transportation Networks Are Inadequate For Required Throughput Existing Facilities May Be War-Damaged Storage Facilities or Marshalling Yards Are Nonexistent or Inadequate Rail Facilities Are Easily Sabotaged

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation PROBLEM Concept: Damaged Rail Facilities Damaged Storage Areas Bomb Damaged Roads Inadequate/Damaged MHE

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation PROBLEM Reality: (Circa 1944)

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation APPROACH Rapid Infrastructure Development/Enhancement (RIDE): 4 Wheels of RIDE:  Rapid Structural Repair Pier EnhancementPier Enhancement Advanced MaterialsAdvanced Materials  Emergency Crater Repair PiersPiers Marshalling Yards and RoadsMarshalling Yards and Roads  Storage Facility Development Reduced Logistics DesignReduced Logistics Design  Assessment and Repair of Railroads Determine Rail Condition & Capacity Determine Rail Condition & Capacity Expedient Construction of Rail Linkages Expedient Construction of Rail Linkages

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Rapid Structural Repair Demonstrate advanced materials for expedient repair of roads and piers. Objective: - Leverage Technologies Developed Under LOC Work Packages - Modify Techniques and Procedures For Port Facilities Approach: - Rapid Setting Cements & Polymer Resins - Fiber-Reinforced Plastic (FRP) Panels - Geosynthetic-Wrapped Columns Technologies:

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Emergency Crater Repair Demonstrate materials and techniques for expedient crater repair. Objective: - Determine Structural Requirements For Road Repairs - Reconfigure Airfield Bomb Damage Repair Kits Developed In 1980s - Evaluate New Materials Approach: - Reduced Footprint Multi-Purpose (MP) Mat - Heavy Duty DURA-BASE/AM2 Mat for Temporary Decking - Advanced Anchoring Systems - Composite Reinforcement Materials Technologies:

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Storage Facility Development Demonstrate materials and techniques for rapid construction of marshalling yards and storage facilities. marshalling yards and storage facilities. Objective: - Determine Structural Requirements Based Upon Traffic - RTCH Loads Require 30-inches of Crushed Stone Over Soft Soil - Evaluate Lightweight Composites to Reduce Cross Sections Approach: - Geosynthetic Separators/Reinforcement/Drainage for Heavy Loads - Chemical Stabilizers For Heavy Loads - Composite Mat Systems For Distributed Container Loads Technologies:

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Assessment & Repair of Railroads Demonstrate rapid assessment technologies and construction materials for railroad development/enhancement. for railroad development/enhancement. Objective: - MTMC Anticipates 80% of OCONUS Throughput By Rail - ADCSOPs - Develop/Demonstrate Hand-Held Rail Assessment Technologies - Demonstrate Rapid Track Construction with Geosynthetics Approach: - Simplistic Hand-Held Tools For Rail Condition Assessment - Plastic Cross-Ties For Track Alignment - Geotextiles/Geogrids/Lightweight Fill For Rapid Ballast Construction Technologies:

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation RIDE Funding Original RIDE Work Package: ERDC Groups:  Airfield and Pavements Branch – GSL  Structural Mechanics Branch – GSL  Concrete Materials Branch - GSL  Construction Engineering Research Laboratory (CERL)

One Corps, One Regiment, One Team ……. Serving Soldiers, the Army, the Nation Summary Demonstrate Materials & Techniques to Rapidly Develop/Enhance Infrastructure. Objective: Focus Areas: Metrics:  Rapid Structural Repair  Emergency Crater Repair  Storage Facility Development  Assessment and Repair of Rail Facilities Capability Rapid Assessment Reduced Materials Weight Weight Volume Volume Time TimeAffordabilityTRL Minimum Goal Proposed Objectives Proposed Objectives 20% Reduction 25% Reduction 30% Reduction 20% Reduction 5 to 6 25% Reduction 30% Reduction 40% Reduction 30% Reduction 5 to 7