COMS Transceiver – RF DataTech LRT470 Frequency: 432-442MHz Operation: Half-Duplex Max. RF Transmit Power: 750mW Typical Power Draw at 750mW RF: 3.5W Bandwidth:

Slides:



Advertisements
Similar presentations
MUHAMMAD AHMED HUSSAIN
Advertisements

Overview of this presentation: Introduction to the BLUEsat Project What are the objectives of this thesis project Overview of testing and integration.
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Satellite Communication
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
Team Flying Camels Nawar Chaker Pete Dokter Tim Jacobs Adam Swartley Paul Savage Capstone Project February 24, 2005.
BillikenSat – II Pico-Satellite that conforms to the CubeSat standard Team Leader: Darren Pais Electrical Eng.: Ben Corrado Payload: Rob Arechederra MISSION:
2010 Olin Student Projects Keith Gendreau Fred Huegel Kurt Rush
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Vex 1.0 © 2006 Carnegie Mellon Robotics Academy Inc. Test Bed Assembly.
Modular Nanosatellites as Amateur Radio Communication Platforms Funded by the New Hampshire Space Grant Consortium Gus Moore; Todd Kerner, KB2BCT; Amish.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
CAPACITY planning using BTS (DTRU)
System Level. Total Costs 3 fully powered and steering, 4 idler modules Prototyping Costs (1 fully powered and steering, tested on bench): –Power.
MULTIPURPOSE DIGITAL CDMA FM REMOTE CONTROLLER FIRDOUS KAMAL MIZAN MIAH EE – 513 4/19/2005 COMMUNICATION ELECTRONICS.
Team Members Jordan Bennett Kyle Schultz Min Jae Lee Kevin Yeh.
2 A. Prof. Hala Abdel-monem Elsadek Microstrip Department Head, Electronics Research Institute Institute /Company: Electronics Research Institute l December.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
Electricity and Magnetism Electrostatics Capacitance and Capacitive Circuits.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Summer Projects Review: Current Status. ADCS ADCS calibrated in uniform magnetic field using support hardware to mimic the computer onboard the satellite.
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
Justin Kenny – IME  Project Description + Goals  Block Diagram + Descriptions  Schematic + Layout  Construction, Testing + Problems.
1 2 nd Virgo+ review, Cascina 17/10/2007 H. Heitmann New Quadrant Diodes New Quadrant Diodes Motivations & Requirements Status & Plans: see Nikhef talk.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Subsystem Design Review 1 December 2015 Drawing Package Subsystem Design Review Deployment and Intelligent Nanosatellite Operations (DINO)
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
The Design of an Electronic Bicycle Monitor (EBM) Team P118: Gary Berglund Andrew Gardner Emrys Maier Ammar Mohammad.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
2c) Energy and Potential Difference in Circuits Part 1 Current and Charge.
TPC electronics Status, Plans, Needs Marcus Larwill April
K UMU A ’ O C UBESAT Amy Blas March 7, W HAT IS C UBE S AT ? 10x10x10 centimeter cube Launched in lower earth orbit (LEO) Started last semester.
Physics Support Materials Higher Electricity and Electronics b Electric Fields and Resistors in Circuits 3,3, 4, 5, 6, 7, 11, 12, 13, 14, 15, 16, 17, 18,
1) A binary transmission system uses a 8-bit word encoding system. Find the Bandwidth and the SNR dB of the system if the channel capacity is bps.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
H.Ohoka, H.Kubo, M.Aono, Y.Awane, A.Bamba, R.Enomoto, D.Fink, S.Gunji, R.Hagiwara, M.Hayashida, M.Ikeno, S.Kabuki, H.Katagiri, K.Kodani, Y.Konno, S.Koyama,
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
AMSAT-SA Digital Transponder, telemetry and command system.
Cosmic Microwave Technology, Inc.
EagleSat’s Electronic Power Subsystem
Calorimeter Mu2e Development electronics Front-end Review
From: A fast high-voltage switching multiwire proportional chamber
The open loop gain of this op-amp is 105 and the bandwidth is 10 Hz
Redundancy Switching Components
WP02 PRR: Master Oscillator and RF Reference Distribution
Power Block Implementation
Electronic Circuit-II
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
Image Stabilization System (ISS)
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Terry Cotter LO/IF Group Leader
Development of Gas Electron Multiplier Detectors for Muon Tomography
ELEC207 Linear Integrated Circuits
CubeSat vs. Science Instrument Complexity
AMICSA, June 2018 Leuven, Belgium
Electronic Circuit-II
Suggestion on your presentation of the TT&C subsystem
Presentation transcript:

COMS Transceiver – RF DataTech LRT470 Frequency: MHz Operation: Half-Duplex Max. RF Transmit Power: 750mW Typical Power Draw at 750mW RF: 3.5W Bandwidth: ≤ 25kHz Modem – PIC 16C711 from RF DataTech Modulation: 4800bps GMSK Summer Review 6 th Aug SRC SPACE ACADEMY Architecture

Link Budget Down-Link Ebno required = 9.6 dB for a bit error rate of [Jan_King_Calculator.xls; /Jan_King_Calculator.xls ] Modem chip from RF DataTech is a Microchip PIC. A board will be built to interface it to the transceiver and MCU. A circuit diagram has been supplied by RF DataTech. Summer Review 6 th Aug SRC SPACE ACADEMY Up-Link

Concept Variable voltage dual output power supply – zero to 800V Preamp Shaping amp DiscriminatorBuffer HV Power supply Power controller V/I Status monitor To MCU From MCU MCP Incident dust particles cause plasma-induced electron cascade in single microchannel plate (MCP) with single terminal anode. Charge pulse from anode goes through electronics chain, which produces a pulse-height signal to be read by the MCU PAYLOAD Summer Review 6 th Aug SRC SPACE ACADEMY

1 st July 8 th July 17 th July 14 th July 21 st 22 nd July 24t h July 25 th 1 st August 6 th August Lab work Gain calculations Electronics testing MCA setup Detector assembly Vacuum pumpdown HV supply setup Electronics redesign First Power-up Detector repair and reassembly Second power-up? Test plate voltage 700V Gap voltage 100V Maximum safe plate voltage 850V Summer Review 6 th Aug SRC SPACE ACADEMY

Flight design Detector body height = 4.3mm Mass (assuming density is similar to aluminium) = 14g Approximate specifications: Power consumption: Plate supply = 70mW Support electronics = 50mW Detector area (assuming 46mm diameter disk) = 16.6cm 2 Open area = 10.5cm 2 Summer Review 6 th Aug SRC SPACE ACADEMY

Budget Summer Review 6 th Aug SRC SPACE ACADEMY SubsystemTotal CostCost to Date MECH/OBDH£2992£ ADCS£70 PSU£12000£ COMS CAM PAY £850 £184 £3,400 Launch Testing and development £20,000 £5,000 (excluding Heidelberg) Contingency (30%)£13,242 TOTAL COST£57,738£ Remaining Costto Completion £32157 to Orbit £52157

Mass Budget Internal Configuration Slot No.Spacing (mm)SubsystemMass (kg)Connector Masses (kg) Area (mm squared) Bottom OBDH0.074? COMS – 215.0PSU + BATTERY – 315.0ADCS + MODEM + PAY so far 3 – 415.0PAYundefined undefined 4 - Top12.9DETECTOR + ANTENNA undefined StructureMech ExternalSolar Panels Total Reserve Summer Review 6 th Aug SRC SPACE ACADEMY

Next Steps Summer Review 6 th Aug SRC PSU Fix BCR1 Go through battery charge / discharge cycles Select and purchase Solar Cells Test PSU with the solar cells OBDH Flight board needs to be tested MCU needs to be programmed Subsystems need to be physically interfaced Subsystems need to be run from MCU ADCS Power consumption test whilst connected to the Flight Control Board Axes sensitivity deviation test Refining of electrical components on ADCS board PAY Laboratory Calibrations Heidelberg accelerator testing Support Electronics construction Detector body prototyping and construction SPACE ACADEMY