Draft Planning Guidelines

Slides:



Advertisements
Similar presentations
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Advertisements

1Comprehensive Disaster Risk Management Framework National Disaster Management Systems 111 Institutional Arrangements and Organizational Structures Session.
Linking the Plan to the Budget
PDF-WG Work Plan Development Agenda and Results Framework PDF-WG Consultation Workshop 18 June 2013 PHILIPPINES DEVELOPMENT FORUM Working Group.
Yolanda Recovery and Rehabilitation Plan Immediate Interventions 1 November 27, 2013.
2 nd National Staff Meeting April 19 – 21, 2006 Tagaytay City Updates on FOURmula 1 for Health (NSM Resolution No ) Mario C. Villaverde, MD,MPH,MPM,CESO.
PROJECT UPDATES As of May 2014 Support to the Local Government Units for More Effective and Accountable Public Financial Management (LGU PFM 2 Project)
 Theme of the 2013 Philippine Development Forum (PDF): “President Aquino’s Social Contract: Progress and Challenges in Achieving Inclusive Growth” 
By PROF. LEONOR MAGTOLIS BRIONES Co-Convenor Social Watch Philippines BUDGET ANALYSIS for ALTERNATIVE BUDGETS and PARTICIPATORY BUDGETING: Part I Presentation.
Philippines Development Forum Working Group on Decentralization & Local Government Meeting, June 25, 2012 The Cabinet Clusters: Transparent, accountable,
Inita Paulovica Deputy Resident Representative Turkmenistan.
Enhancing Competitiveness for Inclusive Growth Working Group on Decentralization and Local Governance Sub-Theme 2.
The Philippine Experience Employment-led Post-disaster Recovery: The Philippine Experience Hon. Rosalinda Dimapilis-Baldoz Secretary Department of Labor.
Social accountability ANSA EAP Operations Team Orientation for Barangay Officials from Sta. Mesa 10 April 2010, Ateneo School of Government F O R B A R.
Department of Social Welfare and Development PROTECTIVE SERVICES BUREAU Guidelines in the Implementation of Protective Services for the Grassroots Participatory.
Theme: HUMAN DEVELOPMENT AND POVERTY REDUCTION ChallengePolicy Action Role / Support of Stakeholders JOB CREATION (decent and productive jobs) AND NEED.
16 April 2017 Enhancing Inter-LGU Cooperation in Improving Maternal and Child Health Services in the Cordilleras TWO major topics / characteristics of.
Tourism Convergence Program: Facilitating Local Economic Growth.
Comprehensive Disaster Risk Management Framework Module 2: Philippines Application The Philippine Disaster Management System: Institutional and Organizational.
OBJECTIVES BUDGET REFORM - making the national budget more responsive to local needs LOCAL GOVERNANCE REFORM - providing incentives for local good governance.
Urbanization as a Social Determinant of Health Marilyn Rice, MA, MPH, CHES Senior Advisor in Health Promotion Coordinator, Urban Health & Health Determinants.
Working Group on Growth and Investment Climate (WG-GIC) WG-GIC Accomplishment Report Undersecretary Zenaida C. Maglaya 1 st WG-GIC Meeting for 2012 Audio-Visual.
Normative regulation at national and local level for Roma inclusion Primaria Orasului Cernavoda.
Look,Listen and Learn Project Regional Conference November 2005 Birchwood Hotel, Johannesburg By Fred Kalibwani SADC FOOD SECURITY POLICY PROCESSES.
Proposed SWG-LIR Work Plan Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,
2014 Grassroots Participatory Budgeting Process(GPBP) in KC/NCDDP areas.
Thailand Strategies for Pro-Poor Growth Banchong Amornchewin Thailand International Development Cooperation Agency.
BOTTOM-UP BUDGETING Planning Guidelines for FY 2015.
Agenda  Motivation and Overview (using Education as an example)  Discussion by Selected Intervention Area  Energy Services.
Appreciating the Enhanced BGPMS
Christopher T. Pablo Senior Urban Development Specialist World Bank
Grassroots Participatory Budgeting (GPB) RESULTS FRAMEWORK.
Management and Coordination of the Philippine Statistical System ROMEO S. RECIDE Director Bureau of Agricultural Statistics Bureau of Agricultural Statistics.
SARGEN LPRAT ORIENTATION 16 January 2014
2013 NEO Program Monitoring & Evaluation Framework.
Promoting CARICOM/CARIFORUM Food Security (Project GTFS/RLA/141/ITA) (FAO Trust Fund for Food Security and Food Safety – Government of Italy Contribution)
NATIONAL STATISTICAL COORDINATION BOARD Inter-regional Workshop on the Production of Gender Statistics 6 August 2007, New Delhi, India USER-PRODUCER GROUP.
NEW TOWN DEVELOPMENT AND URBAN RENEWAL Country Report Tuguegarao City, Cagayan Philippines.
Planning Tool, Department of Labor and Employment Annex 6: As presented during the Joint NEDA-SDC and HDPRC Cluster Meeting, 09 January 2014.
Orientation – Workshop On Pilot Testing of the BGPMS.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
Social Justice and Basic Needs “Pro-Poor” Package LEGISLATIVE AND EXECUTIVE DEVELOPMENT ADVISORY COUNCIL 27 JULY 2004.
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
INVESTING IN THE PHILIPPINES IN 2009 PHILIPPINE EMBASSY PRAGUE CZECH-ASIA FORUM 2009 KAMPA HOTEL, PRAGUE 02 MARCH 2009 INVESTING IN THE PHILIPPINES IN.
DTI Implementing Guidelines for 2014 Grassroots Participatory Budgeting Process (formerly known as BuB) Atty. Marvie M. Fulgencio.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
DBM – DILG – DSWD – NAPC Joint Memorandum Circular No. 3 series of 2012.
1 UNDAF PRIORITY WORKING GROUP 5 HUMAN CAPITAL 4 December 2011.
‘ By Abdou Karim LO Minister of State for Reform and Technical Assistance AfCoP/MfDR Co-Chair.
SECRETARY MEL SENEN SARMIENTO. SPEECH OF SECRETARY MEL SENEN SARMIENTO Department of the Interior and Local Government Convention Seminar of Association.
Undersecretary Zenaida C. Maglaya 1 st Meeting of the SWG-LIR Board Room, BOI Penthouse 18 August 2011, 9:00 a.m. SUB-WORKING GROUP ON LOCAL INVESTMENT.
GRASSROOTS PARTICIPATORY BUDGETING PROCESS: a status report.
Updates on the PDF- Decentralization and Local Governments (PDF-DLG) Work Plan 1 st Meeting of PDF-DLG DILG-NAPOLCOM Center, Quezon City April.
Overview on Community-Based Monitoring System (CBMS) Bureau of Local Government Development (BLGD)/ Department of the Interior and Local Government (DILG)
Proposed Consultative Process for Work Plan PDF WG Core Group Meeting 12 April 2013 PHILIPPINES DEVELOPMENT FORUM Working Group on Decentralization.
Financial Projections and Financing Requirements for National Programs GONU The Sudan Consortium May 5 th – 7 th, 2008.
Bamboo Industry Development for South Cotabato Project (a project supported by Rural Micro Enterprise Promotion Programme/ RUMEPP) (RuMEPP is a programme.
Bottom-up-Budgeting (BUB) for Barangays
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
GROWING SEEDS OF HOPE for the Vulnerable and Marginalized Peoples in Caraga and Region X Northern Mindanao Community Initiatives Resource Management Project.
IBOD Programs and Services Department of Science and Technology Technology Application and Promotion Institute.
Planning the ABND exercise in Philippines Core Group 19 June, 2014.
ORGANIZING AND STRENGTHENING OF LOCAL COUNCILS FOR THE PROTECTION OF CHILDREN (LCPC)
Preparations for Regional Budget workshops
BuB and KC-NCDDP Technical Briefer
Session 3: Steering Structures
Office of the Presidential Assistant for Rehabilitation and Recovery
KIRIBATI IW R2R PROJECT OUTLINE OF PRESENTATION: PROGRESS
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Apo View Hotel, Davao City, February 13-14, 2009
Presentation transcript:

Draft Planning Guidelines BOTTOM-UP BUDGETING Draft Planning Guidelines for FY 2015

OBJECTIVES 1 BUDGET REFORM - making the national budget more responsive to local needs LOCAL GOVERNANCE REFORM - providing incentives for local good governance - strengthening the devolution of basic services delivery DEMOCRATIC AND EMPOWERMENT PROJECT - creating a conducive environment for people’s participation - generating demand for good governance at the local level 2 3

PARTICIPATORY POVERTY REDUCTION PLANNING OBJECTIVES BUDGET PROCESS LOCAL GOVERNMENTS BUDGET FORMULATION LEGISLATIVE APPROVAL IMPLEMENTATION EVALUATION / ACCOUNTABILITY PARTICIPATORY POVERTY REDUCTION PLANNING COMMUNITY / CIVIL SOCIETY ORGANIZATIONS

Cities & Municipalities COVERAGE 2013: 609 2014: 1,233 2015: 1,634 2016: 1,634 2017: ??? Cities & Municipalities

COVERAGE Participating Agencies (for FY 2015): Oversight Agencies: DA, DAR, DEPED, DOE, DENR, DOH, DILG, DOLE, DSWD, DOT, DTI, TESDA and NEA Oversight Agencies: DBM, DILG, DSWD, NAPC and NEDA 5

BUDGET CAP Allocations per city/ municipality - Formula: No. of poor x P700 (Rounded up to nearest million) - Minimum of P15million, Maximum of P50 million 6

HARMONIZATION WITH LOCAL PLANNING PROCESSES Two modes of BuB Regular: LPRAT as a sub-committee of the LDC (Non-functionality of LDC should not be an obstacle for the LPRAT to meet) Enhanced Process To be undertaken in 270 municipalities that have graduated from or are currently implementing KALAHI-CIDSS LPRAT to serve as a technical working group of an “Enhanced LDC”; Final decisions to be made in the “Enhanced” LDC

LPRAT Under Regular BuB, LPRAT composed of: Mayor, Sanggunian Appropriations Committee Chair, local department heads and representatives of NGAs at the city/municipal level (50% of LPRAT members) Representatives of CSOs elected during the CSO assembly + 1 business group representative (50% of LPRAT members) Elected officials, their immediate relatives (spouse, parent, sibling, child) and LGU employees are ineligible to be elected as CSO representatives

Regular BuB Process

STEPS 1: Civil Society Assemblies Orientation on BuB Election of LPRAT representatives and 3 CSO signatories to the LPRAP (including LPRAT co-chair) Report of LCE on status of 2013 BuB Projects Poverty Situation Analysis

STEPS 2: Local Poverty Reduction Action Planning Workshop Use LPRAP workshop modules which will be distributed Multi-year planning (submission of indicative list of projects for 2016 and 2017) Project Identification 80% within Menu of Programs (to be reviewed and validated by RPRAT) 20% outside of the Menu (to be reviewed and validated by NPRAT)

STEPS 3: Submission of List of Priority Projects and other supporting documents (hard and soft copy) Cover letter signed by mayor List of projects using template signed by LCE and 3 CSO representatives on every page Project brief for each project Report on compliance with participatory processes Conduct of CSO assembly – attendance sheet, photo of participants, documentation of election report, LGU report on status of BuB 2013 projects Conduct of LPRAP workshop – photo of participants, attendance sheet, minutes or highlights of the LPRAP workshop

STEPS 4: Consolidation of list of projects by DILG RO and submission to NAPC and distribution to RPRAT members 5: Validation, Review and Replacement of Projects Review / Validation by RPRAT and NPRAT RPRAT meeting/workshop with LPRAT to replace rejected projects Submission to NAPC of final list of projects

STEPS 6: Adoption of final list of priority projects by local Sanggunian (to be submitted to DILG RO) 7: Integration into the National Budget 8: Provision of funding for LGU Counterpart in local budget

Counterpart Requirements For Municipalities: cash counterpart will be a % of the local development fund Proportion of BuB plus KALAHI-CIDSS funding to LDF Required Cash Counterpart Up to 100% of LDF 10% of LDF Over 100% up to 150% 15% of LDF Over 150% 20% of LDF For Cities: cash counterpart will be 40% of the BuB budget cap

Counterpart Requirements Counterpart funding need not be allocated on a per project basis. Cash counterpart may be used to fund projects that are 100% funded by the LGU. Projects to be funded by the LGU cash counterpart should be determined by the LPRAT, effectively adding it to the ‘BuB Funding Pot’. KALAHI-CIDSS will no longer ask for other cash counterpart, however, additional non-cash counterpart may be required

Project Identification Project Identification: NEGATIVE LIST Projects below P500,000 Expansion of Pantawid Pamilya, Social Pension for Indigents Senior Citizens, PhilHEALTH coverage, vaccination programs Housing Projects Construction of school buildings, classrooms and rural health units Farm to Market Roads Law enforcement, fire protection and jail management related projects Construction of city hall, training centers and other multi-purpose buildings Purchase of motor vehicles, except those used for rescue in times of disaster International Training, scholarships

Governance Requirements Attain Seal of Good Housekeeping for 2013 assessment Develop a PFM Improvement Plan or attain 2014 targets if already developed Counterpart requirements are provided for BuB 2014 budget Submission of proper financial and physical accomplishment reports for LGU implemented BuB 2014 projects Compliance with intent of BuB for meaningful participation Conduct of CSO assembly and LPRAT workshop Conduct of Quarterly LPRAT meetings IDENTIFIED PROJECTS WILL NOT BE FUNDED AND WILL NOT BE IMPLEMENTED IF THESE CONDITIONS ARE NOT MET

Enhanced BuB Process (For Municipalities that have graduated from or are currently implementing KALAHI-CIDSS)

Variances in the Process Barangay level planning Conduct of barangay poverty situation analysis and barangay assemblies (to be facilitated/ conducted by DSWD KALAHI-CIDSS) ‘Enhanced’ Local Development Council CSO members: Barangay Development Council Vice-Chairs to be elected from KALAHI-CIDSS volunteers (1 per barangay) 5 CSO representatives elected during the CSO assembly LPRAT to be created as a technical working group of the Enhanced LDC With 10 members from government, 5 members from Barangay BDC Vice-Chairs, and the 5 CSOs elected during the CSO assembly

Variances in the Process ‘Enhanced’ Local Development Council to approve list of priority projects prepared by the LPRAT List of projects to be submitted to also contain KALAHI-CIDSS and LGU funded projects Planning process to be harmonized with crafting of Comprehensive Development Plan

Calendar Activity Responsible Party Period For KALAHI-CIDSS areas only: Selection of BDC Vice-Chairs and Barangay-level poverty situation analysis DSWD Area Coordination Teams for KALAHI-CIDSS Prior to Sept 2013 1 Orientation of the RPRATS DILG PMO Sep 2 Conduct of Civil Society Assemblies DILG ROs Oct 3 Orientation workshops for LPRATs RPRATS Nov 1 – 15 4 Conduct of LPRAP Workshops / Enhanced LDC and LPRAT meetings LGUs Nov 16 - Dec 15 5 Submission of LPRAPs and list of priority projects / LDIPs to the DILG RO Dec 16 6 Forward copies of all LPRAPs with consolidated list of projects / LDIPs to NAPC and participating regional offices; NAPC to forward to all participating Agency Central Offices RPRAT Dec 23 Dec 30 - out to NGAs

Calendar Activity Responsible Party Period 7 Convening of RPRAT to validate LGU proposals; clarify proposals with LGUs if necessary RPRAT Jan 20 – 31 8 Convening of NPRAT to review outside of the menu DILG PMO 9 Submission of accepted and rejected outside of the menu projects to the RPRATs Feb 3 10 Inform LPRATs of rejected projects for Replacement Feb 6 11 Validation workshop to replace projects with LPRATs RPRATs Feb 10 - 21 12 Submission of consolidated revised LPRAPs/ LDIP to RPRATs together with Sangunian Resolution LGUs Feb 28 13 Submission of consolidated list of validated projects to NAPC Mar 7 14 Endorsement of proposed BuB Projects to participating agencies Mar 14 15 Integration of BuB Proposals with NGA budget proposals in the NEP DBM and ACOs Mar 15 - April 14 16 Submission of agency proposed budget to DBM Participating Agencies April 15

Thank You 24

Menu of Programs DA - Irrigation projects (SIP/STW/OSP) - Infrastructure support to Agri and Fishery production (Tractor, Planter/Seeder, Harvester, Thresher, Sheller, Motorized Fishing Boat, Fish Nets) Agro-Processing Facilities and Expanded Agri-Business Activities Post-harvest Facilities and Equipment (Mechanical Dryers, Multi-Purpose Drying Pavement) Cold Storage Facilities/Vans Ports and Wharves Trading Posts Sustainable Agri-Fishery Based Livelihood and other Agri-Fishery Business Investments Tramlines Farm implements/ tools Agri-Fishery training Marine Reserve and Fish Sanctuaries Marine protected areas Organic fertilizer production

Menu of Programs DA - Irrigation projects (SIP/STW/OSP) - Infrastructure support to Agri and Fishery production (Tractor, Planter/Seeder, Harvester, Thresher, Sheller, Motorized Fishing Boat, Fish Nets) Agro-Processing Facilities and Expanded Agri-Business Activities Post-harvest Facilities and Equipment (Mechanical Dryers, Multi-Purpose Drying Pavement) Cold Storage Facilities/Vans Ports and Wharves Trading Posts Sustainable Agri-Fishery Based Livelihood and other Agri-Fishery Business Investments Tramlines Farm implements/ tools Agri-Fishery training Marine Reserve and Fish Sanctuaries Marine protected areas Organic fertilizer production

Menu of Programs DENR DTI DOT DOE NEA - National Greening Program Local Regional Economic Development Yaman Pinoy’ Rural Micro Enterprise Development Program Shared Service Facility OTOP Store Express Industry Clustering Development Program Philippine Traceability for Revitalized Agricultural Competitiveness Enhancement Program (P-Trace) DOT DOE NEA On-grid Sitio Electrification Program Barangay Line Enhancement Program

Menu of Programs DSWD DOLE TESDA Sustainable Livelihood Program: Microenterprise Development Track Sustainable Livelihood Program: Employment Facilitation Track KALAHI-CIDSS Protective Services – Infrastructure Projects Protective Services – Capacity Building DOLE Workers Income Augmentation Program (WIN AP) TUlong Panghanapbuhay para sa Ating mga Disadvantaged Workers (TUPAD) DOLE-AMP (DOLE- Adjustment Measures Program) OFWs REINTEGRATION PROGRAM SPES (Special Program for the Employment of Students) TESDA

Menu of Programs DepEd DOH Basic Education Facilities: Repair / rehabilitation of classrooms Basic Education Facilities: Provision of school furniture Gulayan sa Paaralan Innovative programs to promote access to Education/ Abot-Alam Program DOH Maternal, neonatal, child health and nutrition (MNCHN) Community Health Team (CHT) mobilization Infectious diseases (Filariasis Elimination, Schistosomiasis and Malaria Control, Rabies Elimination, Leprosy, TB Control, STI/HIV and AIDS Prevention, Dengue Control Health Emergency Mangement RNheals Rural Health Midwife Placement Program Health Facilities Enhancement Program

Menu of Programs DILG SALINTUBIG Capacity Building for CSOs School Computer Laboratory Birthing Facility Core Local Road Construction/ Maintenance / Rehabilitation Tourism Facility Public Market Slaughterhouse Transport Terminal Evacuation Facility Rescue Equipment Flood Control