Presentation is loading. Please wait.

Presentation is loading. Please wait.

Financial Projections and Financing Requirements for National Programs GONU The Sudan Consortium May 5 th – 7 th, 2008.

Similar presentations


Presentation on theme: "Financial Projections and Financing Requirements for National Programs GONU The Sudan Consortium May 5 th – 7 th, 2008."— Presentation transcript:

1 Financial Projections and Financing Requirements for National Programs GONU The Sudan Consortium May 5 th – 7 th, 2008

2 Financial Projections and Financing Requirements for National Programs To achieve the goals of the Strategic Five Year Plan there are set of polices and programs designed for this purpose.

3 Assistance from the international community is needed in both:  Polices-dialogue with the international partners to be built on the thematic groups;  Financial assistance to bridge the gap between needs and domestic resources.

4 Areas of assistance according to government priorities Sustainable Development  Investments in non oil sectors particularly agriculture and small scale enterprise;  Completion of the National Transport Master Plan Study: –In roads, constructed of roads, particularly in the East and the Three areas; –In rail, rehabilitate the railway network particularly the corridor Port Sudan-Khartoum-Wau; –In river transport,improved river transport infrastructure

5 Poverty Reduction and the Realisation of the Millennium Development Goals: In Health:  Health infrastructure and equipment. Rehabilitation and construction of PHCs, basic health units, rural hospitals, dressing stations;  Maternal health interventions;  Investments in control of communicable diseases particularly for malaria, TB, HIV/AIDS, bilharzias, leishmaniasis and diarrhea diseases.

6 In Education: Construction of classrooms, mobile schools, boarding houses and learning centers; Rehabilitation of teachers training institutes and vocational education centers; Expanding the coverage of school feeding programs; Creating a pool of trained educational planners and administrators; Improving the educational management information systems.

7 In Water and Sanitation: Rehabilitation and construction of boreholes fitted with hand pumps, wells, mini water yards, hafirs, slow sand filter systems,water supply transmission pipe; Improved sanitation facilities; Improving sector capacity and organizational performance of the relevant water and sanitation institutions and provision of drilling equipment.

8 Other priority areas are: Social Protection In Return, Reintegration and Resettlement of the displaced persons, rapid scaling up of basic service delivery, capacity, attention to productive recovery and development projects; Vocational training, employment creation and other income generating schemes.

9 In Disarmament, Demobilization and Reintegration: Disarmament, demobilization and reintegration of ex-combatants, including special-needs groups and community security and arms control initiatives.

10 In Mine Action:  Emergency route survey and route verification/clearance of all secondary suspected/mined roads and mine clearance;  Provision of risk education, health and physical, psycho-social and economic rehabilitation;  Reintegration of mine/ERW victims and survivors;  Strengthen and expand the existing mine action institutional framework and capacities

11 Governance and Rule of Law:  Support to Commissions, elections, training and capacity building, for Ministry of justice, states and communities; Training of police and training women into the police force; Diversion programs for children; Maintenance and renovation of mental sanatoria; Training wildlife staff.

12 Capacity building:  Finalization of the Public Sector Reform MDTF project;  Expanding and strengthening of technical education;  Building the capacity of civil service;  Intergovernmental relation institution and grassroots' groups;  Civil society organizations;  Empowerment of women.

13 Media:  Support media by soft and hardware;  Training of journalists.

14 Projected Macroeconomic Indicators

15 Financing Gap (in billion US$)


Download ppt "Financial Projections and Financing Requirements for National Programs GONU The Sudan Consortium May 5 th – 7 th, 2008."

Similar presentations


Ads by Google