1.Macbeth et al. (2012): Procurement and supply in projects: Misunderstood and under- researched. Project Management Institute. 2.Pesämaa et al. (2009):

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

Innovation systems and technological transitions – towards a common framework Jochen Markard Innovation Research in Utility Sectors (CIRUS) Workshop Zurich,
In Europe, When you ask the VET stakeholders : What does Quality Assurance mean for VET system? You can get the following answer: Quality is not an absolute.
School of Marketing Ehrenberg-Bass Institute for Marketing Science Sales management issues relating to cross-functional selling teams John Wilkinson.
LOCAL SYSTEM OF INNOVATION CENTERED ON AUDIOVISUAL PRODUCTION Marcelo Matos Fluminense Federal University and RedeSist - IE/UFRJ.
Depth and diversity of a competitive EDTIB: SMEs in defence The European Defence Agency Pieter Taal Assistant Director, Industry & Market Directorate Berlin.
Knowledge Networking: How Networks Influence Policy By Aly Z. Ramji.
Job Analysis and Rewards
Objectives When developing products, product developers have a large influence on a product’s life cycle, e.g. on how the product is produced and which.
The Role of Data analysis for M& E in the context of ABRDP By: Faye Ensermu Chemeda Data Analysis Expert Ethio-Italian Development Co-operation Asella.
Team Composition and Team Role Allocation in Agile Project Teams Brian Turrel 30 March 2015.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
Innovativeness & Interaction: Conceptual Research Approach Maria M. Smirnova Sergey P. Kouchtch GSOM Saint Petersburg.
Chapter 11 Purchasing, innovation and quality management
11. Purchasing, new product development and quality control
How ISO 9001 Fits Into The Software World? Management of Software Projects and Personnel CIS 6516 March 6, 2006 Prepared by Olgu Yilmaz Swapna Mekala.
The phases of research Dimitra Hartas. The phases of research Identify a research topic Formulate the research questions (rationale) Review relevant studies.
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
The BIM Project Execution Planning Procedure
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
Changing Notions of Ethics in SMEs
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
General evaluation of the process and results of the preparation of the Innovative master program "Biodiversity and nature protection" Kseniya Kamenskaya,
ERP Implementation: An Exploratory Study of Customization Levels Marcus Rothenberger University of Nevada, Las Vegas Mark Srite University of Wisconsin-Milwaukee.
The WIPO Development Agenda: An Overview Geneva May, 2009 Esteban Burrone World Intellectual Property Organization.
Organizational Structure of RAO UES Executive Administration During Reform Period 22 March 2004.
Distribution Networks in TR a NSITION Background and positioning of the project.
Perinatal and Infant Oral Health Quality Improvement National Learning Network Estimated Number Awards: One (1) Type of Award: Cooperative Agreement Estimated.
Designing and implementing of the NQF Tempus Project N° TEMPUS-2008-SE-SMHES ( )
1 Regional cluster adoption: The role of transaction costs, resource characteristics, and technology Grant Castner University of Oregon Peter Green University.
Industrial Engineering Roles In Industry
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Globelics PhD Academy 2007 Clean Development Mechanism and technological learning PhD thesis and Conceptual framework ideas Asel Doranova UNU-MERIT, Maastricht,
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Key Barriers for the ICT Research Sector in Serbia, and Recommendations for Future EU- Serbia Collaboration Miodrag Ivkovic, ISS Milorad Bjeletic, BOS.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
CHAPTER 2 Supply Chain Management. Logistics –deals with the management of material, service and information flow across the SC SCM –formerly, integrating.
Background The research topic Product Innovation Strategy belongs to the activity called product planning. It is an ongoing activity that takes place before.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
The Wisconsin Green Tier Program: Developing An Evaluation Tool Analysis by: Darryn Beckstrom, Jessalyn Frost, Erin Rushmer, and Melody Sakazaki.
European Commission Joint Evaluation Unit common to EuropeAid, Relex and Development Methodology for Evaluation of Budget support operations at Country.
TOWARDS “CLEAN” MINING TECHNOLOGY THROUGH TECHNICAL SCIENTIFIC INNOVATION Nicolae Ilias, Romania.
Supply Chain Management Purchasing/Inventory/Materials.
Hugo Horta Center for the Advancement of Higher Education, Tohoku University Japan CIES-ISCTE, Portugal.
Towards a Reference Quality Model for Digital Libraries Maristella Agosti Nicola Ferro Edward A. Fox Marcos André Gonçalves Bárbara Lagoeiro Moreira.
WERST – Methodology Group
Corporate Services Restructuring 31 March Introduction  The AG completed the restructuring of Corporate Services in November 2005  The restructuring.
PERFORMANCE MEASUREMENT SYSTEMS MUST BE ENGINEERED Peter Kueng Andreas Meier Thomas Wettatein University of Fribourg Date: 2002 / 11 / 27 Course: Research.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
How can collaboration be improved ? - can research collaboration facilitate growth for sub-suppliers? Kenneth Thomsen DTU Wind Energy Ane Holck DTU Innovation.
Using Avatars and Virtual Environments in Learning: What do they have to offer? Article Review By: Amanda Lawrie.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Co-funded by the European Union Ref. number: LLP FI-ERASMUS-ENW WP2: Identification of Industrial Needs for Open innovation Education in.
Presenter: Mbelle, Frank E Institute of Adult Education.
Dynamic capabilities in young entrepreneurial ventures: Evidence from Europe Aimilia Protogerou and Yannis Caloghirou Laboratory of Industrial and Energy.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
The Strategic Emerging Industry Cluster Evolution Mechanism Based on cross organizational knowledge of the integration network Name: Daao WANG.
Green Initiative for energy efficient eco-products in the construction industry GREEN-IT Project: EIE Acronym: GREEN-IT Duration:
Pedro Emanuel Botelho Espadinha da Cruz
Basic Principles of Good Management
STRATEGIC ACADEMIC UNIT “PEOPLE & TECHNOLOGIES”
Capacity WORKS Critical Success Factor Processes
Monitoring and Evaluation using the
Summary of key findings Inga Pavlovaite
MGT601 SME MANAGEMENT.
Managerial Decision Making and Evaluating Research
Presentation transcript:

1.Macbeth et al. (2012): Procurement and supply in projects: Misunderstood and under- researched. Project Management Institute. 2.Pesämaa et al. (2009): Validating a model of cooperative procurement in the construction industry. International Journal of Project Management, 27 3.Eriksson and Pesämaa (2013): Buyer-supplier integration in project-based businesses. Journal of Business and Industrial Marketing, Ruuska et al. (2013): Supplier capabilities in large shipbuilding projects. International Journal of Project Management, Eriksson and Westerberg (2011): Effects of cooperative procurement procedures on construction project performance: A conceptual framework. International Journal of Project Management, Rwelamila and Edries (2007): Project procurement competence and knowledge base of civil engineering consultants: An empirical study. Journal of Management in Engineering, 23. This presentation is a part of the Offshore Wind Denmark project initiated by Offshoreenergy.dk and the Danish Wind Industry Association and supported by: There is a relatively scarce literature available in relation to the purchasing practices in the project procurement literature [1]. However, there can be identified three distinct areas that are likely to have a positive effect on more cost-effective purchasing. These areas are the level of collaborative organizing of the project purchasing  1, 2, 3, 5], appropriate supplier selection criteria  2, 3, 4] and the composition of a competent project purchasing team  4, 6]. This paper aims to shed light on the efficiency of the purchasing practices in offshore wind farms by posing the following questions: 1.To which extent is purchasing considered as a collaborative activity? 2.What characterizes the supplier selection? 3.What characterizes project purchasing team’s competencies? By answering these questions the article will contribute to the enhanced awareness of more efficient purchasing activities in offshore wind farms. The challenge of reducing cost of energy (CoE) is one of the most triggering issues in relation to the establishment of offshore wind farms. In this context the role of purchasing gains relevance, as wind farm projects entail large scale procurement and involve several suppliers. This article focuses on identifying to which extent cost-effective purchasing activities are taken into consideration when establishing offshore wind farms. This is done through a case study that followed purchasing practices in a North European offshore wind farm project. Preliminary findings indicate that: Purchasing seems to be a somewhat unconscious process and characterized by individual organizational goals. Supplier selection process is to a high extent based on offshore track record and earlier project collaboration. Project purchasing competencies are biased between the technical and commercial personnel. In order to reduce CoE in offshore wind farm projects, project purchasing deserves to be taken into consideration as a contributor to a more efficient supply chain. This study shed light on the project purchasing practices in an offshore wind farm context. Three purchasing areas were recognized as being important for a more successful and effective project purchasing practice: 1.Collaborative, incentive-based activities to ensure a positive project result. 2.Appropriate and task related supplier selection. 3.Relevant project purchasing competencies. The case in an offshore wind farm context revealed that in general there was a minor focus on project purchasing. Practices were characterized by individual organizational goals, and supplier selection was to a large extent based on previous experience and well-established relationships. Moreover, there could be identified biased purchasing competencies among the team members, especially between the technical and the commercial buyers. Finally, project managers gained an important role in coordinating the purchasing interfaces between different supplier tiers. Offshore wind farm projects can benefit from focusing on the purchasing processes when planning and implementing projects. By doing so, a combined technological and business administrative effort to reduce CoE is likely to have a positive effect on the offshore wind farms’ supply chains. Abstract Cost-Effective Purchasing in Offshore Wind Farms -Utopia or an Opportunity to Contribute to a More Efficient Supply Chain? Salla Lutz, Postdoc, PhD University of Southern Denmark, Department of Environmental and Business Economics PO. ID 028 Results Objectives Conclusions and perspectives Methods References EWEA OFFSHORE 2013 EWEA OFFSHORE 2013 In this preliminary phase of the research project a qualitative case-based research design was chosen. The data collection was based on semi-structured interviews with companies involved in the same North European offshore wind farm project. More specifically, a supply of a transformer platform’s topside was studied. The empirical starting point for conducting this somewhat explorative case study was to become acquainted with some actors within the sector and in that way grasp some purchasing characteristics typical to the sector. In that sense one may argue that the selection of the participating companies was random, but nevertheless, it provided an applicable foundation for a research project that is in its early phase. There was a focal company, an electronic system supplier that was of remarkable assistance in helping to establish the contacts with the other interviewed companies that represented different supplier tiers in the project. The interviewed companies were an electricity supplier that also was a project owner, a topside supplier, an electronic equipment supplier, as well a circuit breaker panel and a generator supplier. The interviewed companies and their internal relationships are illustrated in Figure 1. Figure 1: The companies interviewed and their internal relationships In total 10 interviews were conducted during the preliminary case study period (March – August) in 5 different companies. In three of the companies the project managers were interviewed, and one interview was also conducted with a purchasing manager. In the remaining two companies key account managers and a technical specialist were interviewed. The interviews lasted between 30 minutes and 1½ hours and they were recorded and thereafter transcripted. The interviews were analyzed in Nvivo (a software for analyzing qualitative data) by comparing them with the identified characteristics in the literature. On the basis of the conducted interviews, peculiar project purchasing characteristics could be detected among the companies. The findings of the case study are illustrated in Table 1 by comparing the case study results with the characteristics of cost-effective purchasing identified in the existing literature. The results of this study are based on a single case study conducted in a relatively short time period. Therefore, the results can not be generalized. However, the findings indicated some interesting traits in the offshore wind farm context and further research is needed to strengthen and to refine these results. Table 1: The case study results