Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Electric System Reliability in a Post SONGS World.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
California Independent System Operator Corporation Overview of ISO Renewable Resource Program Karen Edson Vice-President of External Affairs October 9,
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
BOSTON DENVER LONDON LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Effective Load Carrying Capability of Wind Generation: Initial Results.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
The Role of Energy Storage in Renewable Power Integration Emily Fertig Sharon Wagner Carnegie Mellon University.
California Energy Commission Workshop Nuclear Power Plant Issues
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Energy and Economy Transition California’s energy system to a highly efficient, renewables-based system and electrify transportation.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
The Policy Voice for Energy Storage Bulk Energy Storage for the Nation’s Electricity Grid Jason Makansi, Executive Director President, Pearl Street Inc.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Advanced Energy Storage for Load Management 2008 Rulemaking on Load Management Standards Efficiency Committee Workshop March 3, 2008 Charles R. Toca US&R.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Renewables and System Services Ann Scully.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Monterey Plaza Hotel October 8-10, 2007
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
November 20, 2015 Challenges of Storage Development - Advanced Rail Energy Storage (ARES) Prepared for Bulk Storage Conference, Sacramento November 20,
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
PSERC Workshop – August 5, 2008
ISO New England Net Load Analysis with High Penetration Distributed PV
MIT tour of the California ISO Control Center March 31, 2015
Integrated Resource Planning and Load Flexibility Analysis
Wind Generation Integration NERC MRC Meeting May 6, 2008
Forecasting and Operations CAISO Case
Gordon van Welie, President & Chief Executive Officer
Wholesale Electricity Costs
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation APEx 2007 Program October 15-16, 2007

Anjali Sheffrin 2 Individual States take lead in fight against global warming “Today California will be a leader in the fight against global warming,” said Governor Schwarzenegger. (United Nations' World Environment Day conference in San Francisco, June 1, 2007)

Renewable Portfolio Standards

Anjali Sheffrin 4 CAISO Renewables Integration Program ISO Corporate Goal: Support the integration of renewable resources on the California power grid in support of the State of California’s policy regarding renewables. Project encompasses the integration of renewable resources into CAISO’s  Transmission planning  Markets, and  Grid Operations Objective is to support the State’s goal of 20% of customer load being served by renewable resources by the end of 2010 and 33% by 2020.

5 Current Level of Renewable Generation in California

6 20% Renewables

7 Large amounts of renewable generation are needed to meet state requirements.

8 Altamont Pass Solano County Tehachapi/ Mojave Desert San Gorgonio Pass California’s abundant wind resources have a key role to play. Pacheco Pass Lassen Shasta Salton Sea Imperial Valley

9 What are the Major Challenges of Integrating Intermittent Resources ? Barriers to Efficient Interconnection and Transmission Planning  Funding challenges for transmission to remote locations and existing transmission policies distinguishing reliability and economic upgrades Operating Issues  Frequency regulation, load following, and operating reserves;  Ramping problems; over generation control  Importance of forecasting of renewable energy; Application of WECC standards for wind generators

10 Removing Barriers to Efficient Interconnection Policies Problem: Current Interconnection Policies Creating a Barrier  Long standing FERC policy offers two approaches for financing transmission upgrades: Network transmission facilities rolled into Transmission Access Charge “Tie-line” facilities paid for by power plant owners CAISO proposed solution: Distinct new category of transmission serving multiple power plants in areas where the energy sources cannot be transported  Facilitate capturing economies of scale associated with renewable energy development  Promote overall development of diverse renewable resource opportunities Key elements of new interconnection policy for locationally constrained resource areas  Financing Mechanism Allows Appropriate Sizing Lines paid for by transmission owners  Risk of Stranded Costs Systematically Mitigated California Energy Commission designation as a significant resource area Multiple projects in the area CAISO must find the project to be cost-effective

11 Eligibility Criteria for Transmission to Locationally Constrained Resource Areas Must be non-network Must provide access to an area with significant potential for development of locationally constrained resources (i.e., renewables) as designated by the CEC Must be turned over to ISO control Transmission to serve multiple facilities Cannot exceed 15% of the sum total of the high-voltage network plant included in the Transmission Access Charge Must meet a commercial interest test - i.e. sufficient generator interest through Large Generator Interconnection Process

12 Removing Barriers to Effective Transmission Planning Problem: Planning for reliability upgrades only and economic upgrades to be market driven ISO proposed solution:  New transmission planning process for reliability and economic projects Regional planning with all transmission providers in California Established Transmission Economic Assessment Methodology (TEAM) as standard measure for establishing economic need for major transmission projects  Proactive transmission planning for future clusters of renewable generation Tehachapi Transmission Plan »Approved on January 24, 2007 »First use of clustering approach

13 Transmission Study Results The Tehachapi Transmission Plan is sound and there are no serious transient stability or voltage control problems Key conclusions  Power factor control is critical - New wind generators must meet WECC criteria for ±0.95 power factor control  Low Voltage Ride Through Standard – all new units must meet WECC LVRT Standard.  New wind generators should be Type 3 or Type 4 units  Existing Type 1 Wind Generators in Tehachapi area do not meet LVRT standards and will probably be lost in event of voltage collapse

14 Ramping issues Forecasted Hourly Ramps due to Additional Wind Generation In California, the wind generation energy production tends to be inversely correlated with the daily load curve. The wind energy production peaks during the night and falls off during the morning load pick up. The net result will be morning ramps of 2000 to 4000 MW per hour for 3 hours – a total of 6000 to 12,000 MW over 3 hours.

15 Wind Generation Output may Change Quickly Will Affect Ramp Rates, Regulation Requirements, Load Following, Etc.

16 Wind Generation Output may Peak During Off-peak Periods May Lead to Cycling of Base Load Generation

17 Operational challenges to incorporating the 20% RPS Target Increases the amount of regulation resources  Add 170 MW to 500 MW of regulation resources to accommodate rapid changes in wind and other variables. Amount required varies with the season (winter, spring, summer, fall) Estimated cost of additional regulation is $30 million annually Ramping requirement increases  Fast ramping increases by ±15 MW/min to ±25MW/min  Regulation by hydro units will be most important Supplemental energy dispatches will increase  Morning ramp up will increase by 1000 to 2000 MW per hour  Evening ramp down will increase by 1000 to 1800 MW per hour Potential Over Generation problems will increase for light load periods  Pro rata cuts of up to 800 MW of wind generation production may be required for an estimated 100 hours per year

18 Enhanced Resource Adequacy requirements and market prices will drive integration of renewables Generation Portfolio Storage Demand Response Resources Required for Renewables Integration Quick Start Units Fast Ramping Wider Operating Range Regulation capability Shift Energy from off-peak to on-peak Mitigate Over Generation Voltage Support Regulation capability Price sensitive load Responsive to ISO dispatches Frequency Responsive Responsive to Wind Generation Production

19 How to make the 20% RPS Target work Build the planned transmission facilities for  Tehachapi  Sunrise Power Link Require all new wind generators to be Type 3 or Type 4 that meet Low Voltage Ride Through (LVRT) Standards Add SVC’s for dynamic VAR regulation Change Resource Adequacy requirements for generation facilities for more fast start units, increased ramping, and larger operating ranges. Integrate wind energy production with changes in hydro dispatch for meet the need for rapid energy ramps Increase storage options – 3 rd pump operation at Helms, Leaps, Compressed Air Storage, H.S. Flywheels for regulation and Hydrogen Storage. Increase Demand Response options

20 Conclusions The increasing cost of natural gas for fossil fired plants and declining cost of wind generation makes wind generation an attractive source of energy. We need new methods to control the wind generation ramps if we are going to accommodate 6000 to 8000 MWs of wind generation. New technology at the turbines site can provide for response for frequency control. The regulation and load following burden to accommodate wind generation is not trivial but can be managed with good forecasting techniques and mix of fast ramping generation resources.