Project Management Concepts
Advertisements

Developing the Schedule
TK3333 Software Management Topic 7: Schedule Control.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 3 Managing the Information Systems Project
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Systems Analysis and Design 9th Edition
Prof. Mohammad Moizuddin
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Systems Analysis and Design 8 th Edition Chapter 3 Managing Systems Projects.
Project Management A Managerial Approach
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Systems Analysis and Design 9th Edition
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Systems Analysis and Design 8th Edition
Modern Systems Analysis and Design Third Edition
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 4.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
The Systems Analysis Toolkit Project Management Tools.
Managing Projects
Project Management Chapter 3 BUSI 2106 – Operations Management.
HIT241 - TIME MANAGEMENT Introduction
CHAPTER 3 PROJECT MANAGEMENT.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
System Analysis & Design Chapter V: Information System Planning 1.Introduction Nowadays, Information Systems plays the main role in success or failure.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Systems Analysis and Design 10th Edition
Chapter 6: Project Time Management
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
CS211 Slide 10-1 ADCS 21 Feasibility and Cost Analysis Tools Project Management Tools Alternative System Development Methodologies (Chapter 10) Tools for.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Time Management
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Managing Systems Projects
Modern Systems Analysis and Design Third Edition
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Toolkit 4

Toolkit Objectives Describe project management tools and how they are used Describe the steps used in project planning, scheduling, monitoring and controlling, and reporting Explain techniques for estimating task completion times and costs Describe various scheduling tools, including Gantt charts and PERT/CPM charts 3

Toolkit Objectives Calculate completion times, start dates, and end dates for a project Identify examples of project management software and explain how these programs can assist you in project planning, estimating, scheduling, monitoring, and reporting Explain the steps involved in software change control Understand the reasons why projects sometimes fail 3

Introduction You will learn about project planning, estimating, scheduling, monitoring, reporting, and the use of project management software You also will learn how to control and manage project changes that typically occur 4

Project Management Overview Project Creep The goal is to deliver an information system that is acceptable to users and is developed on time and within budget Project manager or project leader Project coordinator

Project Management Overview Project managers typically perform four main tasks: Project planning Project scheduling Project monitoring and controlling Project reporting

Project Planning

Project Planning Identifying Tasks One of the most important variables is the size of the project, because the amount of work does not relate directly to the size of the project If one project is twice the size of another project, the larger project will take more than twice as many resources to develop

Project Planning Identifying Tasks The capabilities of project team members also affect time requirements Brooke’s Law

Project Planning Estimating Task Completion Time and Cost Person-days Some tasks can be divided evenly so it is possible to use different combinations of time and people, up to a point In most systems analysis tasks, however, time and people are not interchangeable

Project Planning Estimating Task Completion Time and Cost Best-case estimate (B) Probable-case estimate (P) Worst-case estimate (W) Weight Expected task duration: (B+4P+W) 6

Project Planning Factors Affecting Time and Cost Estimates Project size and scope IT resources Prior experience with similar projects or systems Applicable constraints

Overview of Project Scheduling Project scheduling involves the creation of a specific timetable Dependent task Must balance task time estimates, sequences, and personnel assignments Several graphical planning aids can help

Project Scheduling with Gantt Charts Task groups Are not an ideal tool for controlling a complex project

Project Scheduling with PERT/CPM Charts The Program Evaluation Review Technique (PERT) Critical Path Method (CPM) The important distinctions between the two methods have disappeared over time, and today the technique is called either PERT, or CPM, or PERT/CPM

Project Scheduling with PERT/CPM Charts Overview of PERT/CPM PERT/CPM is called a bottom-up technique Project tasks Once you know the tasks, their duration, and the order in which they must be performed, you can calculate the time that it will take to complete the project

Project Scheduling with PERT/CPM Charts PERT/CPM Chart Format Task box T (task duration, or time) ES (earliest start) EF (earliest finish) – expected project duration LF (latest finish) LS (latest start)

Project Scheduling with PERT/CPM Charts Task Patterns Sequential tasks Multiple successor tasks Concurrent task Predecessor task Successor task Multiple Predecessor Tasks

Project Scheduling with PERT/CPM Charts Task Patterns

Project Scheduling with PERT/CPM Charts Complex Task Patterns When various task patterns combine, you must study the facts carefully in order to understand the logical sequence of tasks A systems analyst must understand that project calculations will not be accurate unless the underlying task pattern is logically correct

Project Scheduling with PERT/CPM Charts A PERT/CPM Example with Five Tasks

Project Scheduling with PERT/CPM Charts A PERT/CPM Example with Five Tasks

Project Scheduling with PERT/CPM Charts Critical Path Slack time If any task along the critical path falls behind schedule, the entire project is delayed A critical path includes all tasks that are vital to the project schedule

Project Scheduling with PERT/CPM Charts Transforming a Task List into a PERT/CPM Chart You must develop three versions: Version 1: Basic Structure Version 2: Enter ES and EF Values Version 3: Add LF and LS Values After you enter the LS and LS figures, you will be able to identify the critical path

Project Scheduling with PERT/CPM Charts Transforming a Task List into a PERT/CPM Chart

Project Scheduling with PERT/CPM Charts Transforming a Task List into a PERT/CPM Chart

Project Scheduling with PERT/CPM Charts Transforming a Task List into a PERT/CPM Chart

Project Scheduling with PERT/CPM Charts Transforming a Task List into a PERT/CPM Chart

Project Scheduling with PERT/CPM Charts Comparing Gantt Charts and PERT/CPM One significant advantage of PERT/CPM charts is that all individual tasks and dependencies are shown A PERT/CPM chart displays the critical path for the overall project and the slack time A Gantt chart offers a rapid overview PERT/CPM and Gantt charts are not mutually exclusive techniques

Project Monitoring and Controlling Monitoring and Control Techniques The project manager must keep track of tasks and progress of team members, compare actual progress to the project plan, verify the completion of project milestones, and set standards and ensure that they are followed Structured walkthrough Called design reviews, code reviews, or testing reviews

Project Monitoring and Controlling Maintaining a Schedule Maintaining a project schedule can be a challenging task The better the original plan, the easier it will be to control the project If enough milestones and frequent checkpoints exist, problems will be detected rapidly It is mathematically possible for a project to have more than one critical path

Project Reporting Project Status Meetings Most project managers schedule regular status meetings with the entire project team Each team member updates the group and identifies any problems or delays The meetings also give the project manager an opportunity to update the entire group, seek input, and conduct brainstorming sessions

Project Reporting Project Status Reports A project manager must report regularly to his or her immediate supervisor, upper management, and users Should explain what you are doing to handle and monitor the problem Most managers recognize that problems do occur on most projects; it is better to alert management sooner rather than later

Project Management Software Project Management Examples Microsoft Project Open Workbench Open-source software

Project Management Software Project Management Examples The first step in project management is to identify the tasks, task duration, and task dependencies Network diagram Project planning is a dynamic task and involves constant change

Project Management Software Project Management Examples

Software Change Control A procedure for processing requests for changes to an information system’s requirements consists of four steps: Complete a change request form Take initial action on the request Analyze the impact of the requested change Determine the disposition of the requested change

Keys to Project Success Business Issues The major objective of every system is to provide a solution to a business problem or opportunity A system that falls short of business needs also produces problems for users and reduces morale and productivity

Keys to Project Success Budget Issues Cost overruns typically result from one or more of the following: Unrealistic estimates Failure to develop an accurate TCO forecast Poor monitoring of progress and inadequate reaction to early signs of problems Schedule delays due to unanticipated factors Human resource factors

Keys to Project Success Schedule Issues Problems with timetables and project milestones can indicate a failure to recognize task dependencies, confusing effort with progress, poor monitoring and control methods, personality conflicts among team members, or turnover of project personnel

Keys to Project Success Successful Project Management When problems occur, the project manager’s ability to handle the situation becomes the critical factor Sometimes, when a project experiences delays or cost overruns, the system still can be delivered on time and within budget if several less critical requirements are trimmed

Keys to Project Success Successful Project Management If a project is in trouble because of a lack of resources or organizational support, management might be willing to give the project more commitment and higher priority A typical response is to push back the completion date Option only if the original target date is flexible and the extension will not create excessive costs or other problems

Toolkit Summary Project management is the process of planning, scheduling, monitoring and controlling, and reporting upon the development of an information system Begins with identifying and planning all specific tasks or activities Can use graphical tools such as Gantt charts and PERT/CPM charts to assist in the scheduling process 49

Toolkit Summary A project manager uses a variety of techniques to monitor, control, and report project tasks Software change control is concerned with change requests that arise Every successful information system must support business requirements, stay within budget, and be available on time Toolkit 4 complete 49