27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2.

Slides:



Advertisements
Similar presentations
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
17-April-09 TILC09 Global Design Effort 1 Barry Barish TILC09 – Tsukuba, Japan 17-April-09 ILC / GDE Report Electron Cloud at CesrTA.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
4-June-08 GDE Meeting - Dubna Global Design Effort 1 GDE Status/Update Barry Barish GDE Meeting at Dubna 4-June-08.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
14-Nov-11 PAC - Prague Global Design Effort 1 Barry Barish PAC - Prague 14-Nov-11 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
M. Ross for PM - ILC Global Design Effort 1 Dubna GDE Workshop ОИЯИ, Дубна, Marc Ross, Akira Yamamoto, Nick Walker GDE Project.
2-March-09 SiD Meeting - SLAC Global Design Effort 1 Barry Barish SiD Meeting – SLAC 2-March-09 ILC Report.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Mike Harrison LCFOA meeting July 08 Americas ILC Status - Baseline Design Gev e+ e- Linear Collider Energy 250 Gev x 250 Gev Length km.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
April 29, 2009 M. Ross for PM Global Design Effort 1 GDE Global Program Marc Ross for: Akira Yamamoto, Nick Walker GDE Project Managers Risk Reduction.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Presented by Marc Ross - for the ILC Project Managers: Research and Development Resources PAC Review, Vancouver, Marc Ross, Fermilab - Global.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Barry Barish ECFA Workshop in Warsaw, Poland 9-June-08
Oversea collaborators
CLIC/ILC Collaboration Meeting: Objectives & Organization
ILC Global Design Effort
Yasuhiro Okada, Executive Director, KEK
Barry Barish JSPS - Sendai 12-Sept-11
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2 Final Doublet System

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 2 Status and Plans Where are we? –Update on our plans and the global climate Where are we going? (The plan for the GDE) –Technical design phase TDP1 – 2010; TDP2 – 2012 What do we plan to accomplish? –R&D Goals: ATF2 (this meeting); SCRF (Yamamoto); Electron Cloud - CesrTA –The Minimum Design - Optimizing cost to performance; new baseline and technical design –Develop a “Project Implementation Plan”

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 3 –11km SC linacs operating at 31.5 MV/m for 500 GeV –Centralized injector Circular damping rings for electrons and positrons Undulator-based positron source –Single IR with 14 mrad crossing angle –Dual tunnel configuration for safety and availability TDR Starting Point: ILC RDR Reference Design – Feb 2007 Documented in Reference Design Report

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 4 ILC Reference Design Reference Design Report (4 volumes) Executive Summary Physics at the ILC Accelerator Detectors

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 5 US / UK Funding Actions UK ILC R&D Program –About 40 FTEs. Leadership roles in Damping Rings and Positron Source, as well as in the Beam Delivery System and Beam Dumps. –All of this program is generic accelerator R&D, some of which are continuing outside the specific ILC project, retaining key personnel. US Program –ILC R&D reduced $60M  $15M for FY08. Planning a reduced level program for FY09 and beyond. US President & Congressional FY09 budgets = $35M –Generic SCRF also terminated in FY08, but is proposed to be revived in FY09 to $25M. and separated from ILC R&D.

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 6 P5 – A New U.S. HEP Long Range Plan Too much ILC Too little ILC

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 7 P5 Report: ILC Recommendation “The panel recommends for the near future a broad accelerator and detector R&D program for lepton colliders that includes continued R&D on ILC at roughly the proposed FY2009 level in support of the international effort. This will allow a significant role for the US in the ILC wherever it is built.” Proposed FY2009 Budget = $35.3M (caveat – after US election and a continuing resolution)

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 8 How do we propose to move forward? We must re-examine our ILC RDR design and optimize for cost to performance. This will require aggressive studies of the major cost drivers, reducing scope, staging, etc. We will do this openly and in full coordination with experimentalists. We must develop our technical design, such that major technical questions (gradient, electron cloud, etc) are positively resolved We must develop the technical design in preparation of making a construction proposal (plug compatible designs, value engineered concepts, etc.) Finally, we must develop an attractive, realistic and flexible Project Implementation Plan General Theme: RISK REDUCTION

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 9 R&D Plan - Technical Design Phase First Official Release June 08 Next review and release: December 08 Global Design Effort

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 10 R&D Program & Major Goals Key Supporting R&D Program (priorities) –SCRF (Yamamoto) High Gradient R&D - globally coordinated program to demonstrate gradient for TDP by 2010 with 50%yield; 90% yield by 2012 S1/S2 Cryomodule and RF Unit demonstrations –ATF-2 at KEK (This meeting) –Electron Cloud Mitigation – (CesrTA) Electron Cloud tests at Cornell to establish mitigation and verify one damping ring is sufficient.

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 11 E Cloud – Results SLAC

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 12 Electron cloud – Goal Ensure the e- cloud won’t blow up the e+ beam emittance. –Do simulations (cheap) –Test vacuum pipe coatings, grooved chambers, and clearing electrodes effect on e- cloud buildup –Do above in ILC style wigglers with low emittance beam to minimize the extrapolation to the ILC. –Test program is underway at CESR Cornell (CesrTA)

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 13 TD Phase 1 Timescale: Interim report mid 2010 Major theme: High-priority risk-mitigating R&D –R&D demonstrations –Minimum design -- top down cost/performance optimizaton to develop a new baseline by 2010 –Studies of governance –Development of a siting plan with ILCSC

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 14 Timescale: Produce report mid-2012 First goal: New baseline design –SCRF – S1 Test of one RF unit –Detailed technical design studies – –Updated VALUE estimate and schedule –Remaining critical R&D and technology demonstration Second Goal: Project Implementation Plan. TD Phase 2

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 15 ILC R&D Major Test Facilites Test FacilityAcronymPurposeHost LabOperation start Organized through: Accelerator Test Facility ATFDamping RingKEK1997ATF Collaboration Cornell Test Accelerator CESR-TADamping RingCornell2008Cornell Superconducting RF Test Facility STFMain linacKEK2008KEK TESLA Test Facility/ Free Electron Laser Hamburg TTF FLASH Main linacDESY1997 TESLA Collaboration, DESY ILC Test Accelerator ILCTA-NMLMain LinacFNAL2009Fermilab Beam Delivery Test Facility ATF-2Beam DeliveryKEK2008ATF Collaboration End Station A (program terminated 2008) ILC- SLAC ESA Machine – Detector Interface SLAC2006SLAC

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 16 Test FacilityDeliverableDate Optics and stabilisation demonstrations: ATFGeneration of 1 pm-rad low emittance beam2009 ATF-2 Demonstration of compact Final Focus optics (design demagnification, resulting in a nominal 35 nm beam size at focal point) Demonstration of prototype SC and PM final doublet magnets2012 Stabilisation of 35 nm beam over various time scales.2012 Linac high-gradient operation and system demonstrations: TTF/FLASHFull 9 mA, 1 GeV, high-repetition rate operation2009 STF & ILCTA- NML Cavity-string test within one cryomodule (S1 and S1-global)2010 Cryomodule-string test with one RF Unit with beam (S2)2012 Electron cloud mitigation studies: CESR-TA Re-configuration (re-build) of CESR as low-emittance e-cloud test facility. First measurements of e-cloud build-up using instrumented sections in dipoles and drifts sections (large emittance) Achieve lower emittance beams. Measurements of e-cloud build up in wiggler chambers Characterisation of e-cloud build-up and instability thresholds as a function of low vertical emittance (≤20 pm) 2010 R&D Test Facilities Deliverables

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 17 Our Plan with goals and dates Basic time-scale –Phase 1: July 2010 Paris meeting already scheduled –Phase 2: end of CY 2012 Not previously well-defined Fits with current SCRF planning (S2 for example) Encapsulates the PMs strategy and vision for the next four years –Critical R&D –Cost reduction / machine design –Project Implementation Plan

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 18 Design / Cost Reduction / PIP Primary deliverables: -Interim report end of TDP-1 -TDR documentation end of TDP-2 Primary deliverables: -Interim report end of TDP-1 -TDR documentation end of TDP-2

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 19 Design / Cost Reduction / PIP Minimum machine studies Re-baseline in 2010 (publish in interim report) Minimum machine studies Re-baseline in 2010 (publish in interim report)

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 20 Cost Consciousness and Reduction Understanding the scope of the TDP (design/cost) work

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 21 Conventional Facilities Plan RDR based on “sample sites” –Accounts for about 1/3 of costs –Much specific information, but not cost minimized TD Phase proposed to produce “uniform” site study –Work together on siting to apply “value engineering” to minimize costs –Investigate shallow sites, single tunnel, etc. –Define uniform site Develop Siting strategy –Desired features, requirements, cost and other information for potential hosts –What is asked from hosts?

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 22 Design / Cost Reduction / PIP TDP-2: -Technical requirements documentation -Technical design work  cost update -Value Engineering -Cost & Schedule -18 month period TDP-2: -Technical requirements documentation -Technical design work  cost update -Value Engineering -Cost & Schedule -18 month period

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 23 Design / Cost Reduction / PIP Project Implementation Plan -Spans entire 4 year period -Phases: -Definition of elements (2008) -(SCRF) Mass-production models (2009) -(SCRF) Cost models (2010) -Remainder of PIP elements (2012) (mass-production and cost models driven by cost & schedule activities in TDP-2) Project Implementation Plan -Spans entire 4 year period -Phases: -Definition of elements (2008) -(SCRF) Mass-production models (2009) -(SCRF) Cost models (2010) -Remainder of PIP elements (2012) (mass-production and cost models driven by cost & schedule activities in TDP-2)

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 24 Project Implementation Plan

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 25 Critical R&D

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 26 Critical R&D CM Plug compatibility interface specs. CM design issue. Inputs to PIP, cost-estimation and schedule CM Plug compatibility interface specs. CM design issue. Inputs to PIP, cost-estimation and schedule

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 27 Critical R&D Other technical goals

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 28 SCRF Major Goals High-gradient cavity performance at 35 MV/m according to the specified chemical process with a yield of 50% in TDP1, and with a production yield of 90% in TDP Nominal Cryomodule design to be optimized: - plug-compatible design including tune-ability and maintainability - thermal balance and cryogenics operation - beam dynamics (addressing issues such as orientation and alignment) 2009 Cavity-string performance in one cryomodule with the average gradient 31.5 MV based on a global effort (S1 and S1-global) 2010 An ILC accelerator unit, consisting of three cryomodules powered by one RF unit, with achieving the average gradient 31.5 MV/m (S2) 2012

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 29 Global R&D Plan Consensus in SCRF-TA 29 Calender Year Technical Design Phase TDP-1TDP-2 Cavity Gradient R&D to reach 35 MV/m Process Yield > 50% Production Yield >90% Cavity-string test: with 1 cryomodule Global collab. System Test with beam 1 RF-unit (3-modulce) FLASH (DESY) STF2 (KEK) NML (FNAL) ?

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 30 Meetings at CERN in November when I visited CERN to give an ILC colloquium –Meeting with the CLIC Extended Steering Committee, where I suggested we explore areas of joint work, where both stand to gain. –Meeting with R Aymar, who also endorses the general idea of increasing areas of joint work Follow up meeting in February and May to organize and identify areas of joint interest Dubna meeting focused on joint ILC-CLIC site studies and costing methodology An Integrated Effort to a Linear Collider

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 31 Initiating Joint Areas Co-conveners of the CLIC-ILC working groups -Civil Engineering and Conventional Facilities (CFS): Claude Hauviller/CERN, John Osborne/CERN, Vic Kuchler (FNAL) -Beam Delivery Systems and Machine Detector Interface: D.Schulte/CERN, Brett Parker (BNL), Andrei Seryi (SLAC),, Emmanuel Tsesmelis/CERN -Detectors: L.Linssen/CERN, Francois Richard/LAL, Dieter.Schlatter/CERN, Sakue Yamada/KEK -Cost & Schedule: John Carwardine (ANL), Katy Foraz/CERN, Peter Garbincius (FNAL), Tetsuo Shidara (KEK), Sylvain Weisz/CERN -Beam Dynamics: A.Latina/FNAL), Kiyoshi Kubo (KEK), D.Schulte/CERN, Nick Walker (DESY) Two new groups being formed – (positrons and damping rings)

27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 32 Conclusions We have developed a realistic plan for the next phase of the R&D and design of the ILC –A two stage ILC Technical Design Phase (TDP and TDP is proposed) Overall Goals: Cost and risk reduction through R&D program, develop a new baseline; complete technical design and implementation plan on the time scale of LHC results SCIENCE remains the key to ultimate success; along with a solid design to propose for construction