Bob Hayward Receiver Engineer Feed & Front End PDR 12-13 Feb 2002 1 Feed & Front End PDR Monitor & Control and Cryogenics.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
COMPUTERS AND INPUT SENSORS. cbc MICROCOMPUTER OPERATION HAPPENS IN STAGES Memory.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Keith MorrisEVLA Front-End CDR – New EVLA Receiver Card Cage April 24, EVLA Front-End CDR The New EVLA Receiver Card Cage.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Introduction To Programmable Logic Controllers
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
Guitar Effects Processor Critical Design Review October, 07, 2003 Groups Members: Adam Bernstein Hosam Ghaith Jasenko Alagic Matthew Iyer Yousef Alyousef.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
PROGRAMMABLE LOGIC CONTROLLERS PLC’S
Digital I/O Connecting to the Outside World
Product Introduction.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Embedded Systems Design
Transition Board Redesign aka: The Connector Project Project Manager: Ashley Walker Teammates: Brad Westgate and Bryn Hollen NASA Mentor: Dr. F. Scott.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
Hall C’s HMS PLC Controls by Steven Lassiter. What Constituents a PLC System PLC (processors) Programming. I/O modules. Field Device Signals (sometimes.
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
ZTF Interconnecting Scheme Stephen Kaye
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
Wayne M. KoskiEVLA Front-End CDR – EVLA Receiver Monitor & Control April 24, EVLA Front-End CDR EVLA Receiver Monitor & Control F317 and F320 Modules.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Computer Hardware Basics
Programmable Logic Controller (PLC)
CUE – Make Any Pump an E-Pump
An Automated RF Tuner for Silicon Carbide Electronic Device Processing
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Q, Ka, K, Ku & X-Band Receivers
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Hot Off the Press Q, Ka, K-Band Cost Savings.
Multiple Module Vacuum Oven Productivity Enhancement System.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
BATCH MEMBERS R.ABHISHEK-08N41A0401 K.DHEERAJ REDDY-08N41A0412 S.RAJENDRA REDDY-08N41A0458 JYOTHISHMATHI COLLEGE OF ENGINEERING AND TECHNOLOGY,TURKAPALLY.
1 Summary Lecture: Part 1 Sensor Readout Electronics and Data Conversion Discovering Sensor Networks: Applications in Structural Health Monitoring.
Solid State Amplifier Controller and Sequencer Jeff Millar, wa1hco.
Future LBO Developments
SCADA for Remote Industrial Plant
LCLS-II 2K Cold Box Controls Design Review
How SCADA Systems Work?.
Redundancy Switching Components
EVLA Front-End CDR – EVLA Front-End Schedule
352MHz Klystron Control for the 3MeV Linac test stand
SMART ENERGY CRYO-REFRIGERATOR TECHNOLOGY FOR THE NEXT GENERATION VERY LARGE ARRAY J. Gardiner, J. Lawton, J. Hamilton, K. Knight, J. Sloan, S. Spagna.
RF Matching Network Description
SC1R Cold Box PDR Controls
Programmable Logic Controllers (PLCs) An Overview.
EVLA NSF Mid-Project Review System / Antenna Status
Electronics: Demod + 4Q FE
EVLA NSF Mid-Project Review System / Antenna Status
Mathew C. Wright January 26, 2009
EVLA M/C Software PDR, 14 May 2002
SNS Cryoplant Commissioning Past Experiences
ACOE347 – Data Acquisition and Automation Systems
KAGRA PLC System Overview
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Monitor & Control and Cryogenics

Bob Hayward Receiver Engineer Feed & Front End PDR Feb The “Card Cage” (Photograph)

Bob Hayward Receiver Engineer Feed & Front End PDR Feb The “Card Cage” Originated with X-band Receiver in 1980’s Different for each Receiver Band Hand-Wired Labor Intensive & Mistake Prone Many components now obsolete or hard to get Mixes high voltage (150 VAC) & low-level signals (ie: LNA bias)

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Old M&C (for L, X, K & Q) F14 Module Rx #2 Card Cage Data Set Module Rx #1 Card Cage Rx #3 Card Cage

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Current Monitor Points (L, X, K & Q-Band) Monitor Points: LNA V Gate (RF1/2 & LF1/2) & LED Voltage Dewar Temperature (300, 50, 15  K Stages) Vacuum Pressure (Dewar & Pump Line) Cryo Status (Off, Cool, Stress, Heat, Pump) Pump & Solenoid Valve Status AC Current Rx Band ID, S/N & Mod Level (4+6+2 bits)

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Current Control Points (L, X, K & Q-Band) Control Points: Cryo Status (Off, Cool, Stress, Heat, Pump) Control LNA Bias Settings (with potentiometers) Signals that pass thru the Card Cage: Lo-Cal Drive (TCAL) Hi-Cal Drive (SCAL)

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Current “Local” M&C Functions Monitor Dewar Temperatures & Vacuum Control Refrigerator and Vacuum Pump based on monitored parameter Control LNA Bias Settings Communicate with Rest of World For VLA, used F14 Module For EVLA, via the MIB

Bob Hayward Receiver Engineer Feed & Front End PDR Feb New M&C Guidelines Minimize Digital “Traffic” Fail-Safe Design Replace Obsolete Components Minimize Space Required Standardize Components & Systems

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Cryogenic and Vacuum Control Operating Sequence Controlled “Locally” –“Fail-Safe” if Computer is “Down” Refrigerator will not start without vacuum in Dewar Current Design Works Well –Don’t change the basic logic –But do it in new hardware

Bob Hayward Receiver Engineer Feed & Front End PDR Feb “Stress” Mode and AC Current Monitor VLA has the capability to –Add “stress” heat load to refrigerator –Monitor total current to refrigerator and vacuum solenoids This was meant for remote diagnosis, but is not used –Cryo performance trends monitored instead This capability not needed for EVLA

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Amplifier Biasing “Servoed” Bias Circuit –Maintains I D Constant by Varying V G –Uses 8 pots to control 4 stages per card –Provides Buffered Monitor Voltages –Provides Over-voltage and ESD Protection Current Design Works Well –Don’t change the basic circuit design –But do it in new hardware

Bob Hayward Receiver Engineer Feed & Front End PDR Feb EVLA Receiver M&C Options 1) A dedicated Card Cage for each receiver “Old” Philosophy Need 240 units + spare cards 2) Single M&C Rack Unit for all 8+ Rx’s / antenna “New” Philosophy Total of 30 units + spare cards Surely easier and cheaper to build 30 rack units than build/modify 240 Card Cages

Bob Hayward Receiver Engineer Feed & Front End PDR Feb New M&C Block Diagram Q-Rx Ka-Rx K-Rx Ku-Rx X-Rx C-Rx S-Rx L-Rx Temp Sensor Card(s) Vacuum Sensor Card(s) Pump Control Card(s) LNA Serial Card(s) Interface LBC Microcomputer ADC / PIO / SIO / Ethernet LBC

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Multi-Receiver M&C Unit Common Temp & Vacuum Monitoring 4-wire DT-471 Temp Sensors good for cables many feet in length Need to investigate maximum cable length Hasting DV-6 pressure sensors can handle ( mV) Remote Fridge & Pump Control Avoids 150 V / 60 Hz near sensitive LNA bias lines

Bob Hayward Receiver Engineer Feed & Front End PDR Feb M&C Computer Embedded Control Computer How smart does the Rx  C need to be? MIB or dedicated Front End Subsystem ? Engineering M&C and Diagnostic Software Since no “Local” access, need identical units for Lab testing

Bob Hayward Receiver Engineer Feed & Front End PDR Feb New M&C Cards Functions New Temperature Sensor Cards: Cryo Temps : 2 per Rx times 8 = 16 (+spares) Room Temps : 1 per Rx times 8 = 8 (+spares) New Vacuum Sensor Cards: 2 per Rx times 8 = 16 (+spares) New Control Card: Pump / Fridge sequencing and Heater On/Off control for each Receiver (ie: 8+)

Bob Hayward Receiver Engineer Feed & Front End PDR Feb New Amplifier Bias Cards Can be much smaller than old design Possibly mount inside Dewar Bias lines shorter, shielded by Dewar Fewer pins in Dewar feedthru connector (typically 9 lines required for a 4-stage LNA) Cheaper Better seal Better RFI bypassing

Bob Hayward Receiver Engineer Feed & Front End PDR Feb New LNA Bias Card LNA Bias Card (LBC): Minimum of 4 stages x 2 Polarizations = 8 stages Sync Serial Interface to Rx M&C Unit Programmable Drain Voltage and Current settings Monitor all V Drain and I Drain settings plus V Gate Use NRAO-Tucson has a Quad LNA (16-stage) card ? (8-layer board, 800 cpts, 32 channel DAC SCLK, SYNC, DIN + VD/ID/VG-Mon) Non-volatile Bias Settings ? (or controlled by a “remote” PIC micro like Quad LNA)

Bob Hayward Receiver Engineer Feed & Front End PDR Feb NRAO-Tucson ALMA Quad LNA Bias Card Block Diagram To 5-Stage LNA #1 To 5-Stage LNA #2 To 3-Stage LNA #3 To 3-Stage LNA #4

Bob Hayward Receiver Engineer Feed & Front End PDR Feb NRAO-Tucson ALMA Quad LNA Bias Card Overview

Bob Hayward Receiver Engineer Feed & Front End PDR Feb NRAO-Tucson ALMA Quad LNA Bias LNA Bias Circuit

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Monitor by Exception If go with minimum amount of processing power: –Instead of monitoring all the voltages, all the time Each V G compared to its saved “OK” value –If all are OK, a monitor bit is “low” –If any are not OK, the bit goes “high” –For diagnostics, the MIB can cycle through and read back all voltages and currents on command –Bias voltages set by non-volatile “digital pots” Could be changed, if required, at any time –But Cryo & Vacuum need continuous monitoring

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Monitor Continuously If use a Rx  C with lots of processing power: –Monitor all the voltages, all the time Each V D, I D & V G compared to its saved value –Reload if “set” values are not correct –Catches instances where LBC card has lost power Provides processed data to an Engineering M&C Lap Top as well as Master Control Computer Temp in  C, Pressure in microns, etc Can the MIB handle this?

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Design Work Will need New Cards –Temperature, Vacuum, Control Boards Straight forward - just update our existing design Do more on less real estate –LNA Bias Card New (or modified NRAO) design –Software Depends on whether done in MIB or dedicate Rx  C May need to hire a new junior engineer?

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Cryogenics Refrigerator Drives The Refrigerator Motor on each Rx requires a 150 Volt, 2-Phase Supply We now derive the Second Phase using a R-C Network –Requires a separate “box” for each Front End –Requires “tuning” to get phase shift right Proposed Alternate: Scott Tee

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Cryogenics Scott Tee A Way of Connecting Two Transformers to derive 2-phase from 3-phase Smoother Drive Without Tuning Transformers Already In-House Mount in Module or Bin –Include Vacuum Pump Control, He Pressure Sensors, etc.

Bob Hayward Receiver Engineer Feed & Front End PDR Feb Cryogenics Helium Compressor VLA currently has 2 compressors supplying 80 S.C.F.M. (total) to 5 refrigerators per antenna EVLA will need 120 S.C.F.M. for 8 refrigerators New compressors required Testing of a higher flow compressor already started Direct replacement Cost – on the order of $350K