RBOD Project-Environmental Vista

Slides:



Advertisements
Similar presentations
Jackson Community Comprehensive Plan – Big Picture Planning for Natural Resources Keeping it Green: Conserving Your Future Through Land Use Planning Presented.
Advertisements

Proposed Research Objectives Presentation to the Energy Roundtable November 21, 2013.
Monument of Destruction: Right Bank Outfall Drainage Project.
Section 69 of the Integrated Coastal Management Act
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
Economics of Land Degradation Initiative Richard J. Thomas ELD Scientific coordinator United Nations University Institute for Water, Environment and Health.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Fermilab Environmental Management System (EMS)
Jump to first page EIAMonitoring9.07(Gajaseni,20 07) 1 Monitoring Monitoring = check of actions Monitoring plan =environmental management plan.
Managing Pollution Across Administrative Boundaries —Bohai Sea Environmental Management Project (BSEMP) Chen Yue Department of International Cooperation.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Future Research NeedsWorld Heritage and Climate Change World Heritage and Climate Change - Future Research Needs Bastian Bomhard World Heritage Officer.
ENVIRONMENTAL MANAGEMENT PLAN
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
Strengths 1.Describes clearly the intrinsic value of the Delta and its economy and documents the many public-good services provided by the Delta 2.Provides.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Environmental flows in Europe Mike Acreman. Green and pleasant land? Thames basin 10,000 km mm rainfall 15 million people significant water stress.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
IWRM as a Tool for Adaptation to Climate Change
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
LAKE OHRID MACEDONIA AND ALBANIA Experiences with Nutrient Management and Agricultural Non-point Source Pollution Control.
Flood Management and Floodplain Ecology 2nd Annual Mekong Flood Forum Marc Goichot Coordinator WWF Living Mekong Initiative (LMI)
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Experience of Inspection Process in LBOD case. Voice of People and Bank’s Inspection Panel findings Voice of People Inspection Panel findings There is.
Suggested Guidelines for Geomorphic aspects of Anadromous Salmonid Habitat Restoration proposals G. Mathias Kondolf.
Economics of Extreme Climatic Events By Adil Rasheed (EPFL-ENAC-ICARE-LESO-PB)
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
Flood Risk Management in Hat Yai, Thailand
Adaptation Baselines Through V&A Assessments Prof. Helmy Eid Climate Change Experts (SWERI) ARC Egypt Material for : Montreal Workshop 2001.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
THE ROLE OF ECONOMICS IN THE IMPLEMENTATION PROCESS WFD "eco procedure" in practice.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Division of Technology, Industry, and Economics Economics and Trade Branch SESSION 7 - How to do Integrated Assessment Stage D: Issuing policy recommendations.
THE CHARACTERISATION OF A RIVER BASIN DISTRICT Case study on the construction of the baseline scenario Inspired from the Oise case (F) Most elements picked.
An Overview of our Community’s Stormwater Management Program
Secondary & Cumulative Effects Analysis Training Program Module 2: How to Establish the SCEA Geographical Boundary.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
South Bay Salt Pond Restoration-- Challenges to Ecological Restoration.
Working for Water Use of evidence in developing a South African Government Programme Nicky Allsopp & Frank Matose.
Status of the Intergovernmental agreement on the Dniester River Basin Round table “Towards Integrated Management of the Transboundary Dniester River Basin:
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
 The Future of Water Conflicts. What can you think of?  What factors can you think of that will affect the future water security of different countries?
Dr. Joerg Hartmann WWF Dams Initiative Leader Energy in a Water Constrained World.
Welcome to Chokhavatia Associates For over 30 years, Chokhavatia Associates has been delivering world-class, award-winning design solutions with all the.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Environmental Sustainability Towards Transforming Tanzania to a Middle Income Economy by 2025: The Challenges of Industrialization Eng. Prof. Rubhera RAM.
How to Protect the Local Environment
Sacramento County Stormwater Quality Program
The EU WATER POLICY.
Results of Workshop Organized by
WASTEWATER MANAGEMENT 19 September 2018
Environmental Impact Assessments
Hydropower and the WFD: constraint or opportunity?
Field survey for Flood, 2013.
Incorporating metal bioavailability into permitting – UK experience
Sacramento County Stormwater Quality Program
Presentation transcript:

RBOD Project-Environmental Vista Naseer Memon

RBOD Project Stage-I Larkana and Shahdad Kot districts Stage-II Kashmore, Jacobabad, Dadu districts and Balochistan Stage-III &IV Sindh and Balochistan Length of drain 273 kms Design discharge increased from 2,271 to 3,525 cusecs Cost increased from Rs. 14 to 31 billion Expected completion-2008

Drainage projects are environmentally sensitive development projects and need careful design & implementation, stringent mitigation measures and effective long term monitoring

Outfall Options Manchar Lake River Indus Evaporation Ponds Via LBOD to Sea Via RBOD to Sea The last option is likely to be the least damaging if socio-environmental impacts are properly mitigated

Environmental Impact Assessment Conducting EIA is a pre-requisite for environmentally sensitive large projects. Public sector projects are generally implemented without EIA. It is appreciable that the IPD conducted an EIA for RBOD project.

Review of the EIA EIA is a guiding document for environmental management of the project. Therefore it would be pertinent to review the stipulations of the EIA. Stakeholder consultation on environmental issues is missing which is mandatory under PEPA Act 1997. Responsibilities in some areas are not clearly defined. e.g. who will ensure pre-discharge treatment of Kotri industrial effluent? (proponent is responsible)

Review of the EIA The EIA proposes Environmental Biological Management through plantation of 2 million trees in Khirthar hills. It is not clear as to who will implement this huge undertaking and who will fund this plan. Abstract of cost given in the PC-1 of the project (page 35-36) is silent about this item. EIA also does not give any rough estimates.  

Review of the EIA The following aspects are also missing in the EIA Change Management Indicators for compliance and effect monitoring Selection of camp sites, waste disposal and restoration plan Transport management (speed limits, oil leakages, washing etc.)

Impact on hill torrents ecosystem The project area is exposed to occasional torrential flows from Khirthar range The EIA document does not provide adequate information on likely effects of the project on hill torrent ecosystem and the drain structure itself. Lessons learnt from CBRC need to be analyzed and incorporated.

Impact on hill torrents ecosystem The following aspects require further investigation: Number of torrents interrupting the drain, their maximum past discharges and frequency Impact on downstream water users and resulting socio-economic losses Engineering risk involving training of flash floods through narrow escapes

Impact on local aquifer Drainage projects pose serious environmental risk for freshwater aquifers The EIA does not adequately cover this very important environmental aspect.   The project area runs closer to River Indus. It is most likely that the area has freshwater recharge zone with relatively higher water table, which will become prone to saline seepage.  Revised PC-I provides stone pitching of bunds and lining of bed  

Impact on Gharo creek ecosystem Chapter 6 (page-6-11) mentions, “No monitoring was done for the Gharo Creek, therefore no scientific statement can be made viz-a-viz environmental impact of K.G drain on the Gharo Creek. However in conclusion it is said that “The current environmental assessment of Gharo Creek does not indicate any serious state of pollution……Therefore, it can be predicted that with the discharge of RBOD into Gharo will not have a negative impact”

Impact on Gharo creek ecosystem It is not clear what sort of “assessment” is referred here in absence of monitoring. Gharo creek ecosystem merits scientific assessment before jumping into conclusions like “no impact”. For long-term impact assessment baseline information need to be collected. EIA is silent about mitigation measure if such monitoring establishes negative environmental impact on the creek ecosystem.

Tidal Impact Page 6-11 article-vi mentions “with the rising tide the flow in the Khuhi-Gharo drain is reversed up to almost 10 kms from the creek.” This reminds terrible failure of Tidal Link Canal of LBOD. LBOD changed whole regime of KPOD after construction of the Tidal Link Canal. The EIA is silent about the likely impact of the backflow in KG drain after commissioning of the RBOD. Also it does not give details of outfall structure

Socio-economical Issues Socio-economical issues of any large development project are long reaching and are integral part of environment. This may include employment, displacement, impact on means of livelihood, historical rights of communities, gender perspective etc. The EIA has very superficially touched (only 7 lines (page 6-3) this very vital impact of the project.

Socio-economical Issues The only aspect discussed is possibility of local employment and termed it positive. It does not even stipulate any terms for employment distribution and other related issues.   There is no mention of impact on ground water, loss of livelihood, women issues etc. Absence of comprehensive socio-economic impact assessment might eventually result in complications for the project executants.

Recommendations-Impacts The following aspects should be studied in greater details Impact on hill torrents ecosystem Impact on freshwater lakes Impact on Gharo creek ecosystem Impact on ground water aquifer Impact on livelihood means of communities Impact of backflow during high tide

Recommendations-Monitoring Establishing Environmental Cell in IPD for the project is appreciable. Environmental impact monitoring should not be restricted with the Environmental Cell. It should be made broad based involving other stakeholders like SEPA, SWD, Environmental NGOS e.g. WWF, IUCN and universities.   Environmental monitoring reports should be made public on quarterly basis.

Recommendations-Upstream Measures In order to mitigate environmental impacts, upstream measures should also be considered. Like treatment of industrial effluent of Kotri, similar measures may also be adopted in the districts releasing agricultural disposal in MNVD.   In collaboration with the Agriculture department use of chemical fertilizers and pesticides may be restricted and gradually replaced with organic alternatives to minimize pollutants in RBOD.  

Recommendations-Upstream Measures Municipal effluent received by MNVD may also be treated before releasing into the drain. The environmental monitoring plan should also encompass these aspect. Future extension at upstream should only have been considered after satisfactory performance of the current phase of the project. At suitable upstream locations localized evaporation and recycling options should also be investigated to reduce the discharges.

Recommendations-Learning from Past RBOD is the second largest drainage project in Sindh after LBOD. Issues, failures and successes registered in the LBOD project should be carefully analyzed and incorporated in RBOD project. Implementing the project in shortest possible time with lowest possible cost is appreciable objective but not at the cost of increased risk and higher cost for people

Thank You