M&V Planning Working Group Update M&V Summit, New Orleans 5/5/03 Satish Kumar and Venkat Kumar.

Slides:



Advertisements
Similar presentations
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Advertisements

Software Quality Assurance Plan
E: Track II Project level analyses Robert Lempert, RAND 1.
M&V Decision Tool Sub-Committee Report Venkat Kumar Satish Kumar FEMP-ESCO Meeting 6 th June, 2002 Palm Springs, CA.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Energy Performance Analysis with RETScreen
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Degree and Graduation Seminar Scope Management
Clean Energy Project Analysis Course Financial and Risk Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo Credit:
Rational Unified Process
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Chapter 3: The Project Management Process Groups
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Using Uncertainty Modeling to Optimize M&V in ESPC Projects Discussion Document 10/31/02.
Degree and Graduation Seminar Project Management Processes
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
Web Development Process Description
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
IEBC Sunkosi Webinar © 2015 All rights reserved. Successfully Implementing Your Student Success Plans Ensuring The Success Of Well Managed Interventions.
UESC Project Identification The Utility Audit ä Preliminary issues ä Arranging the audit ä Kickoff meeting ä The audit ä The audit results Establish Terms.
From Research Prototype to Production
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
Project Progress Document Optimization 5 April 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
Industrial Software Project Management Some views on project managing industrial and business software projects.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Advanced Metering Implementation in ESPCs Drivers 1) Legislation Mandate – No $ 2)M&V Requirements in ESPCs 3)Utilities Cost allocation (e.g. tenants)
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
Technical Working Group Status Updates Federal ESPC Quality Assurance Steering Committee January 25th, 2004 Washington,
Financial ESPC Training Work Session. Proprietary Information Of Energy 2013 Assistance from DOE National Laboratories FEMP works with DOE National Laboratories.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002.
Annual Reporting Working Group Update Lia Webster, Nexant New Orleans M&V Summit May 2003.
M&V Reporting Lia Webster, Nexant. M&V Summit - Nov 2002 Current M&V Reporting - IDIQ Requirements (C.4.2): Post-Install M&V report –Contents to be specified.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Marakas: Decision Support Systems, 2nd Edition © 2003, Prentice-Hall Chapter Chapter 4: Modeling Decision Processes Decision Support Systems in the.
SOFTWARE PROJECT MANAGEMENT
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
People. purpose. performance. Todd County Schools October 30th, 2013.
Energy Savings Performance Contracts & Energy Service Companies
2017/18 SIP Request Process September 2016.
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Delran Township School District
Project Scope Management
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

M&V Planning Working Group Update M&V Summit, New Orleans 5/5/03 Satish Kumar and Venkat Kumar

Key Information Name: M&V Planning (previously known as M&V Decision Tool) WG Members: Aamer Athar, Satish Kumar, Venkat Kumar, Terry Sharp, Gopal Shiddapur, Mark Stetz, Lia Webster Working Group Lead: Satish Kumar Date Formed: November 1 st, 2001 Expected Date of Completion: May 15 th, 2003 Current Status: ????

Framework Goals Develop a framework to help in the development of the M&V plan Introduce relevant issues at an early project development stage. Keep the framework simple to increase its usability Organization Context (ESPC Cash-Flow and M&V Risk Mgmt. Diagram) M&V Planning Flow Chart M&V Planning Instructions Example List of Objectives, Constraints, and Risk Elements

ESPC Cash-flow Model In reality, there are uncertainties around each cash flow component Before ESPC During ESPC Energy + O&M Agency Cash flow ($) weather, energy prices, etc. Savings + Equip performance, model assumptions, etc. Energy + O&M = ESCO Payment + Typically fixed Energy + O&M ESCO Payment =

M&V Risk Management Organization’s Cash-flow Organization Risk Tolerance Uncertainty w/ no risk mgmt $0 for M&V $/yr Expected Cash-flow Uncertainty w/ some risk mgmt $X for M&V Uncertainty w/ more risk mgmt $2X for M&V

1. List ECM and project objectives and constraints 3. Evaluate savings risk for the M&V option. 4. Estimate cost for the M&V option. Is M&V cost acceptable? ABCD M&V approach too risky. M&V cost not acceptable. Evaluate new M&V Option. 5. Write M&V Plan. Cost acceptable Select an M&V Option 2. Evaluate Project and ECM level Objectives & Constraints to identify candidate M&V options. Risk acceptable

Typical Examples Typical Objectives Desire to track energy savings through utility metering, Desire to Verify Energy Performance Annually, Maximize Infrastructure by using Least-Cost M&V Option. Typical Constraints Historical Utility Data not Available, High Degree of Interaction between ECMs ECMs Scope Affects a Very Small Portion of Overall Utility Baseline Typical Risk Elements Operating Hours Degradation of savings Major Changes to the Facilities Savings Risk Associated with the Performance of O&M, Repair & Replacement

Future Steps The current version has been arrived at after many iterations Final approval pending with the Working Group Approved document to be put on the A-Team web site and to be made available to ESCOs and PFs M&V Planning Tool to be included in Project Management Plan and other project kick-off documentation package Dissolve the M&V Planning Working Group