Planning Coordinator Function Task Force Survey Results Doug Tucker Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Advertisements

Communications Heather Rasmussen Communications Specialist W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2014 Website Heather Rasmussen Communications Specialist W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung January 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
CIIMS Update Stacen Tyskiewicz CIIMS Chair. Critical Infrastructure & Information Management Subcommittee (CIIMS) 2 W ESTERN E LECTRICITY C OORDINATING.
RPCG – CCTA Process Vijay Satyal & Colby Johnson Reliability Planning & System Adequacy April 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Next-day Study Task Force Steve Ashbaker Director Event Analysis & Situational Awareness Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C.
Compliance Monitoring Strategy/Schedule Kim Israelsson Manager, Compliance Program Coordination and Process Integration.
Path Operator Task Force Report Joint Guidance Committee December 1, 2014.
CIIMS Update Stacen Tyskiewicz CIIMS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
Energy-Water-Climate Change Scenario Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Installation and Setup Doug Tucker Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2014 Website Heather Rasmussen Communications Specialist W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.
MAC Committee Update Robert Kondziolka, MAC Chair.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Creating Profiles Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Energy-Water-Climate Change Scenario Gary Graham, SPSG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Base Case Coordination System Report Philip Augustin – TSS Chair Nathan Powell – PCC Staff Liaison July 2015 Salt Lake City, UT W ESTERN E LECTRICITY C.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Update: 4.9 Work Team on Committee Role, Scope and Structure Melanie Frye Vice President, Reliability Planning and Performance Analysis W ESTERN E LECTRICITY.
Reliability Assurance Initiative (RAI) 101 Ben Christensen Senior Compliance Risk Analyst, Cyber Security.
WECC 401K Plan Annual Review Jim Robb, CEO and 401K Trustee W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report for MIC Pete Heiman October 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Training Report January 26, 2016 Deveny Bywaters W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ISAS Report Andy Meyers ISAS Chair Operating Committee Meeting October 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
EDWG Outreach Plan Update Jim Gazewood and Harliv Singh January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Environmental and Cultural Data Products Environmental Data Work Group January 15, 2016 Nathan Wagoner, ICF W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Next-day Study Task Force Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRWG request to JUG John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. ISAS Meeting April 20, 2016 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Compliance Risk Analysis Update Ruchi Ankleshwaria Manager, Compliance Risk Analysis W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force Proposed Process W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
BCCS Alternatives Task Force Update to TSS Andrew Christensen, BATF Chair Presented to TSS Aug 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
OFFICE OF THE CITY CLERK JULY 24, 2017 UPDATE REGARDING THE CALIFORNIA VOTER PARTICIPATION RIGHTS ACT (CVPRA) AND THE STATE ATTORNEY GENERAL’S.
Planning Coordinator Gap Update March 25, 2014
System Review Work Group
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
Presentation transcript:

Planning Coordinator Function Task Force Survey Results Doug Tucker Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Background In November 2013 the System Review Work Group (SRWG) conducted a “Planning Coordinator” survey to identify potential modeling gaps in preparation for MOD-032 In September 2014 the Planning Coordinator Function Task Force sent out a similar survey – Sent to Primary Compliance and TSS contacts – Identify issues that have been addressed since SRWG survey was distributed 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Responses 20 Planning Coordinators had changes to their initial SRWG survey response 9 Planning Coordinators had no changes to their initial SRWG survey response 656 bus changes to the initial SRWG survey responses were identified through the PCFTF survey 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Changes to the Initial SRWG Survey Responses 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Significate Changes to the Initial SRWG Survey Responses WAPA RMR claimed 200 of the 390 Tri-State Buses in the “WAPA RMR” base case area LADWP removed buses belonging to the following owners – City of Burbank (17 buses) – City of Glendale (19 buses) WAPA UGP added 10 buses 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Significate Changes from the PCFTF Survey BPA included – Jefferson County PUD (12 buses) – Lower Valley Power & Light (22 buses) – Various Generator Owned (72 buses) BPA removed – Douglas County PUD (24 buses) PSColorado has removed 30 buses 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PC Area Differences from SRWG Survey 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Potential Gaps within certain Areas 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Potential Gaps within certain Areas 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL