Transmission Customer Meeting May 28, 2015 9:00 – 10:00 Lake Natoma Inn 1.

Slides:



Advertisements
Similar presentations
Western Area Power Administration – SNR Brief overview of WASN Sub- Control Area Operations.
Advertisements

Operating Reserves --- Again A Discussion Primer
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
PER
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Goshen Area Bus Reconfiguration
Western Regulation Usage and Pilot Program Results 1.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
NERC Lessons Learned Summary
BCTC Customer Consultation on Loss Compensation Service January 15, 2007.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
2013 Calendar Year Customer Survey Results
OASIS Overview Transmission Customer Forum May 8-9, 2008 Jim Viikinsalo May 8-9, 2008 Jim Viikinsalo.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Peak RCCo Performance Metrics Draft –November 2013.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Roster Verification RV Presentation to School Administrators Spring 2012.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
OASIS Insights & Observations Transmission Customer Forum September 21-22, 2006 Jim Viikinsalo September 21-22, 2006 Jim Viikinsalo.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
ISO Comparison – CAISO Alex Lee (ERCOT)
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
WASN OATI OASIS Postings WASN OATI OASIS No special log in is required to access the WASN OATI OASIS.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Market Trials Update NATF January 5, 2010.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
CIMS Community of Practice (COP) Face-to-Face Call CIMS Community of Practice (COP) Face-to-Face Call ISD Monitors December 9, :00 – 2:45 p.m. 1.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
AFMC Student Portal Presentation for Placement Contacts
Stacen Tyskiewicz CIIMS Chair July 12, 2016
Phase Angle Limitations
Supplier Profile Key Data
Transmission Outage Coordination
Path Operator Implementation Task Force
Western Electricity Coordinating Council
Pseudo-tie business procedure
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Rates & Regulatory Updates
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Duke Energy Carolinas Quarterly Stakeholder Meeting
Two-Dam Independence Project Update
OneSupport Help Center (OSHC) Training
Mandatory Reliability Standards
Coordinate Operations Standard
Merchant Alert Protocol
Pseudo-tie business procedure
Presentation transcript:

Transmission Customer Meeting May 28, :00 – 10:00 Lake Natoma Inn 1

Agenda Kevin Howard, Vice President of Operations Welcome/General Updates Update on Western SNR’s implementation plan for meeting new TOP Reliability Standard requiring Real Time Contingency Analysis Update on Planning Authority/Planning Coordinator Discussions with Customers Jennifer Henn, Public Utilities Specialist Tra nsmission Rates Update Art Diaz-Gonzalez, Outage Coordinator Posted outages and accessing transmission information through Western’s OASIS site 2

SNR Real-Time Contingency Analysis (RTCA) and Planning Authority/Planning Coordinator (PA/PC) Discussions Update, May 2015 Kevin Howard Vice President of Operations, SNR 3

Real-Time Contingency Analysis (RTCA) Requirements 4 Updated NERC Standard – TOP High priority – being pushed by FERC Adopted by NERC Board of Trustees, February 12, 2015 Filed at FERC for approval, March 18, 2015 Enforcement Originally expected – April 1, Now????

Real-Time Contingency Analysis (RTCA) Requirements 5 Real-time Assessment - An evaluation of system conditions using Real-time data to assess existing (pre-Contingency) and potential (post-Contingency) operating conditions. R13. Each Transmission Operator shall ensure that a Real-time Assessment is performed at least once every 30 minutes. [Violation Risk Factor: High] [Time Horizon: Real-time Operations]

Real-Time Contingency Analysis (RTCA) Requirements 6 Considered potential partnership opportunities with SMUD and Western’s other Regions o Not viable at this time, due to system model challenges and development of tools Continuing Development of Alstom tool to accomplish RTCA o State Estimator also supports Dispatch Training Simulator Interim – utilize Peak RC Hosted Application for next 3 years along with SNR Alstom RTCA SNR’s Actions:

Real-Time Contingency Analysis (RTCA) Requirements 7 A number of TOP’s/BA’s are planning to staff 24x7 Operations Engineering (OE) Desks to cover this need SNR requested 6 FTE’s to staff a 24x7 OE Desk in 2016/2017 Currently considering coverage by staffing second TSO Dispatcher on 5x12 hr shift, Monday – Friday (2 additional TSO positions) o These positions would also help with critical workload issues during peak loading and peak field work timeframes during the week o Additional Operations Engineering position and SCADA Engineer Potentially reduce new staff requirement to 4 instead of 6 FTE SNR’s Actions:

Planning Authority/Planning Coordinator Requirements 8 Plan to claim COTP within Western’s Planning Coordinator footprint o Implementation – Fall 2015 Plan to provide Planning Coordinator services to SBA LSEs o Implementation – January 2016 Continuing to work through Reliability Standards Requirements o Identify roles and responsibilities o Identify resource needs and funding requirements New staff will be required to cover these services o To be funded by TANC and SBA LSEs SNR’s Actions:

RTCA and PA/PC Requirements ? Thank You 9

Transmission Customer Meeting Rates Group Jennifer Henn, Public Utilities Specialist 10

Transmission & Regulation 11

CVP Transmission Rate (Current and Forecasted) 12 Central Valley Project Transmission Rates Forecast (as of May 2015) Rate or Revenue Requirement Current Non-Binding Forecast Rate generally effective April 1 each year TRR (in millions)$43.7$45.9$47.9$50.0$50.9 Plant Additions (in millions) $36.1$7.9$20.4$12$0 Transmission Plant Ratio 66.55%66.96%68.61%69.51% NITS (in millions)$31.1$32.0$33.4$34.8$35.5 Capacity (kW-Month)2,405,7012,301,612 Point-to-Point Rate ($/kW Mo.) $1.51$1.66$1.73$1.81$1.84

Rates Group ? Thank You Rates and forecasts are posted at: Regina Rieger, Manager (916) Barbara Lynch(916) Daniel Flores (Student) (916) Jennifer Henn (916) Steve Richardson(916)

WASN OATI OASIS Art Diaz-Gonzalez, Outage Coordinator 14

WASN OATI OASIS No special log in is required to access the WASN OATI OASIS WASN OATI OASIS 15

WASN OATI OASIS Select Westtrans.net 16

WASN OATI OASIS Select Western WASN 17

WASN OATI OASIS Select WASN Scheduled Outages Select Outages next day + 30 days 18

The rolling 30 day outage outlook pdf that is posted daily, this is not a real-time tool. Posted once a day by the Outage Coordinator. WASN OATI OASIS 19

Select OASIS Notices Select Outage WASN OATI OASIS 20

This is the Real-Time tool and is kept up to date by the WASN TSS dispatcher. Click on the text in the Message to see the details WASN OATI OASIS 21

WASN OATI OASIS 22

2 flavors of WASN OASIS postings: Outages that affect the CVP ATC: – These outages are currently posted and managed in OASIS by the TSS desk, this will remain unchanged. The expectation is that the outage is posted as soon as practical. Outages that do not affect CVP ATC: – These outages impact the WASN merchant are posted to OASIS by the TSS desk who will manage these additional scheduling points (lines or CB). No CVP ATC will be assigned. The expectation is that the outage is posted as soon as practical. 2 Timelines for WASN OASIS postings: Scheduled outages – These outages comply with the approved lead-time as outlined in WASN Operating Procedure OP-053 Planned Outage Coordination and the TSS desk will be notified by the OASIS tool via an . Real-time outages – These outages do not comply with the approved lead-time as outlined in WASN Operating Procedure OP-053 Planned Outage Coordination and the TSS desk will be notified by the TSO desk in real-time. WASN OATI OASIS 23

The WASN Transmission lines listed below will be posted on OASIS in the NOTICES section. This is a process to be performed by the Outage Coordinator and the TSS desk. Process: New outages: – The Outage Coordinator posts the outage in the OASIS notices section once a day, this posting is tomorrow plus 30 days (an is automatically sent to the distribution list in OASIS). – The TSS desk receives the from the OASIS tool and creates the necessary notice(s) in OASIS. Date/time changes to existing outages: – The outage coordinator will process the date/time change to an existing outage and post the update to the OASIS notices section. – The TSS desk receives the from the OASIS tool and updates the affected notice(s). WASN OATI OASIS 24

Cancelled outages: – The outage coordinator will process the cancellation of an existing outage and updates the OASIS notices section. – The TSS desk receives the from the OASIS tool and cancels or deletes the respective notice(s). At noon each day the TSS will use TOA outage tool to filter for OATI outages in the date range to be determined and compare them to the OASIS notices to verify correctness of the posted outages. WASN OATI OASIS 25

Lines or Paths that do not impact CVP ATC but need to be posted for the WASN merchant under notices section: Tracy-Livermore 230kv line (TRY-LLL) Livermore-U kv line (LLL-LLN) Tracy-Contra Costa 69kv line (TRY-CC) Elverta CB 1182, WASN Elverta to SMUD Elverta (ELV-ESE) Trinity-Weaverville 60kv line (TNI-WEA) Trinity-Carr 230kv line (TNI-CAR) Tracy-Westley #1 & #2 230kv lines (TRY-WES) (Added December 4, 2014 per an agreement by both WASN and MID, this agreement is posted on the WASN OASIS home page). WASN OATI OASIS 26

WASN OASIS Home Page Posted agreement between WASN and MID 27