Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

Slides:



Advertisements
Similar presentations
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Advertisements

WECC Delegation Agreement WECC Board of Directors Meeting December 7-8, 2006.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
NERC Orientation Joint Guidance Committee WECC Leadership
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
Overview of WECC Comments to FERC on the NOPR Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
FRCC Fall Compliance Workshop October , 2013
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
SRWG Chair Report March 2015 WECC HQ
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Rocky Mountain Region PA/PC Meeting March 18-19, 2014 Denver, Colorado.
Path Operator Implementation Team Report to OC March 25, 2015.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Water Supply Planning Initiative State Water Commission November 22, 2004.
JJ Jamieson MIC Chair MIC Report for ISAS August 2014 Salt Lake City.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
Business Practices Subcommittee Update Executive Committee Meeting February 24, 2015.
Joint Electric Scheduling Subcommittee Update February 18, 2014.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
VEA Modeling, Data Responsibility, and Coordination.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Bert Peters Chair, Path Operator Task Force
WECC MAC Committee Update
RAC Implementation Status
Interchange Scheduling & Accounting Subcommittee
WECC Regional Standards Update
Nick Hatton Associate Engineer March 9, 2017
Merrill Brimhall – Engineer, Staff
Planning Coordinator - Gap Resolution Team (GRT)
WECC Staff Risk Prioritization
Planning Coordinator Gap Update March 25, 2014
RAC Implementation Status
NERC Reliability Standards Development Plan
Planning Coordinator Function Task Force
System Review Work Group
WECC Staff Risk Prioritization
NERC Reliability Standards Development Plan
Planning Coordinator Function Task Force
Bert Peters Chair, Path Operator Task Force
Reliability Workshop Summary
MAC Input on Section 4.9 Review
WESTAR Staff Reports Technical Coordinator Report
NERC Planning Committee Update
Presentation transcript:

Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City

2 Perceived reliability risk because: o Several entities do not know who their Planning Coordinator is or mistakenly assume another entity is performing this function for them o There is a lack of clarity in Functional Model around who should be a Planning Coordinator o There is no clear definition of a Planning Coordinator Area o There may be reliability functions not being performed Planning Coordinator Gaps Issue

3 MOD-032 Standard Development o Passed final ballot in December 2013 o NERC Board approval February 2014 o Requires data providers to submit power flow, dynamics, and short-circuit data to their Planning Coordinator and Transmission Planner Events Creating Urgency

4 Base Case Data Submittal Process (current and general)

5 Base Case Data Submittal Process (MOD-032)

6 October 2013: PCC asks WECC staff to develop a list mapping Transmission Owners and Generator Owners to Planning Coordinators December 2013: System Review Work Group survey conducted to identify facilities not in a Planning Coordinator Area o PCs asked to respond to survey o Still collecting and compiling responses Planning Coordination Committee (PCC) Effort

7 Planning Coordinator Preliminary Survey Results as of

8 “Arizona” Area Unclaimed Buses

9 “Northwest” Area Unclaimed Buses

10 “Montana/WAPA UM” Area Unclaimed Buses

11 “PSCo/WAPA RM” Area Unclaimed Buses

12 “California” Area Unclaimed Buses

13 CAISO, BPA, and Rocky Mountain Region entities present Topics of discussion: o Interconnection-wide methodology ideal (recommendation) o Need to create a common understanding of PC o Issues around the Transmission Planner function o MOD-032 (Area Coordinator role) o Compliance concerns o Entity-level discussion of topic (BPA, CAISO, Xcel) o Processes for coordination Rocky Mountain Meeting To Discuss Planning Coordinator Gaps

Branden Sudduth WECC Questions?