Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Icahn Conversion to T. Rowe Price ITS ABOUT BEING THERE. DaVita Inc. Conversion to T. Rowe Price.
Acquisition Office The Acquisition Process Acquisition Staff.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
District 4 Local Assistance
District Agreement Process Temi Latinwo Federal Aid Agreement Technician.
LHTAC Overview of LPA in Idaho July 24, 2013 Local Public Administration.
IOWA DOT UPDATE 2014 APWA IOWA CHAPTER FALL CONFERENCE JOHN E. DOSTART, P.E.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Old Policy – which no one ever seem to have heard of.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
1 A CASE STUDY: Organization and Workforce for Operations at Maryland State Highway Administration Glenn McLaughlin, Deputy Director Office of CHART and.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
STATE CROSSING SAFETY PROGRAMS & FEDERAL CROSSING SAFETY FUNDING CROSSINGS FOR THE 21 ST CENTURY SESSION AASHTO – SCORT MEETING March 14, 2011 – Washington,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Conversion Presentation. Overview T. Rowe Price Conversion Team Flowserve Team Flowserve Participant May 2010 June 2010July 2010August 2010September 2010October.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
VALIDATION OF PLANNING & OTHER APPLICATIONS A brief guide for Planning Agents.
Highway Utility Engineer, INDOT
Office of Performance Review (OPR) U.S. Department of Health and Human Services (DHHS) Health Resources and Services Administration (HRSA) Stephen Dorage.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
TREE REMOVAL POSTING PROCESS On-site posting on site (yellow sign) and website 5 Working Days Building Permit Application and Tree Removal Plans (sent.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
Legal Holds Department of State Division of Records Management Kevin Callaghan, Director.
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
My NFA letter Will Be Audited How is the CP Involved? VAP Annual CP Training
2013 CDBG Recipients' Workshop CDBG Labor Standards.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
KYTC Change Order (Contract Modifications).
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
ACA – Fall Conference FAA AIP Grants Management
Pre-Construction Services
Implementation Strategy July 2002
LOCALLY ADMINISTERED PROJECTS
Contracting by Negotiation Process Map – Part 15 (1 of 3)
Category 2 Parameters Transportation Management Areas (TMA) – 200,000+ pop. 8 TMAs in Texas Austin Corpus Christi Dallas-Fort Worth El Paso Hidalgo County.
Force Accounts.
Delegated Contract Process for Federal Construction Contracts
Participating Addendum Process Flow Chart
Emergency Relief Process
Standard Setting Process – Information Flow
Procurement Planning Mani Ram Gelal
Environmental Commitments
Guidelines to Refilling a Position
TEXAS DSHS HIV Care services group
Project Manager / Utility Liaison
Presentation transcript:

Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal distribution Analysis indicates site does meet criteria for RSAR Safety Planning Office retrieves additional data necessary to perform RSAR (TRIMS, ADAM, etc) RSAR Coordinator distributes data to RSAR Team for review RSAR Coordinator schedules Pre-Briefing (priority given to Regional Traffic Engineer’s schedule) RSAR Team conducts Pre-Briefing (data is discussed and Onsite Meeting is scheduled) RSAR Team conducts Onsite Meeting Short Range Planning Office creates PIN # Report Writer (Short Range Planning) completes Draft RSAR Report in PDF file format RSAR Coordinator distributes Draft RSAR Report to RSAR Team and schedules Post Meeting (priority given to Regional Traffic Engineer’s schedule) RSAR Team conducts Post Meeting (Draft RSAR Report is discussed) Report Writer (Short Range Planning Office) makes changes (if necessary) and finalizes RSAR Report in PDF file format RSAR Report approvedRSAR Report not approved RSAR Report approvedRSAR Report not approved RSAR Report approved RSAR Report not approved RSAR Coordinator distributes RSAR Report to Chief Engineer, Chief of Environment and Planning, Dept of Safety, Regional Director, Project Programming Director, State Traffic Engineer, Regional Traffic Engineer, Safety Program Manager, FHWA, and RSAR Team Road Safety Audit Review Flow Chart: Development Phase Revised: 2/13/2008 Safety Planning Office analyzes latest 3 years of crash data for eligibility. Must meet either of the following criteria: 1) HESP (Actual Rate/Critical Rate ≥ 3.50); or 2) HRRR (Rural collector/local road and Injury Rate > Statewide Average Injury Rate and/or Fatal Rate > Statewide Average Fatal Rate). Chief Engineer reviews RSAR Report Project Planning Director reviews RSAR Report RSAR Coordinator, Conceptual Planning Office, and Short Range Planning Office review RSAR Report Analysis indicates site does not meet criteria for RSAR Safety Program Manager Consider additional improvements to site or RSAR process

Maintenance Division Regional Traffic Engineer writes and distributes Project Completion Report to Chief Engineer, Project Planning Director, Project Management Director, Project Programming Director, State Traffic Engineer, Safety Program Manager, and FHWA Analysis indicates crash rates have improved and site no longer meets criteria for RSAR RSAR is concluded Road Safety Audit Review Flow Chart: Implementation Phase Revised: 2/13/2008 Guidance Implementation One year after Guidance Implementation Safety Planning Office analyzes latest 3 years of crash data Regional Director assigns project Regional Traffic Engineer Regional & District Maintenance Supervisors Maintenance Workforce State Traffic Engineer coordinates work for Bid Contract On-call Consultant develops Plans State Construction Engineer lets to contract Regional Construction & Traffic Engineer provide contract administration Contractor Bid Contract Consider additional improvements to site or RSAR process Environmental Permits Office provides required documentation (most will be “Categorical Exclusion”) FHWA provides approval for Project Funding Safety Program Manager submits Request for Approval of Project Funding to Project Programming Safety Program Manager requests Environmental Document Safety Program Manager provides Notice to Proceed Safety Program Manager Notify Project Manager Send Contract to Locals Send copy of Approved Contract to Traffic Engineering Office Local Programming