National Training Survey 2009 Presentation to 13 th Annual Conference of Water Services Training Group White’s Hotel, Wexford 10 th September 2009 Presentation.

Slides:



Advertisements
Similar presentations
Tips and Resources IASC Cluster/Sector Leadership Training
Advertisements

MTEF BUDGET PROCESS – A TOOL FOR MAINSTREAMING MDGS
Business Resource Efficiency and Waste (BREW) Programme Mark Atherton Head of Sustainable Development Northwest Regional Development Agency Nick Storer.
A Health and Wellbeing Board for Leicestershire Cheryl Davenport Programme Director.
Shaping the Market Provider Engagement Events June and July 2009 Summary.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
Corporate Services Grants Programme 2015 – 2017 Stephen Morgan Head of Community Engagement
1 Children’s Service budget proposals 2013/14 Formal consultation.
1 Water Services Training Group 16 th Annual Conference Water Sector Reform Programme Implementation INEC, Killarney, 8 th November 2012.
PROJECT PORTFOLIO OFFICE 2011 SaMA - Workshop 1 & 2 21 & 23 June 2010.
Paul Dunne Assistant Chief Executive Officer Local Government Management Agency Transforming Local Government: the HR Agenda Dublin Castle, 14th October,
Implementing a framework for employability Penny Renwick, Pro Vice Chancellor, Manchester Metropolitan University.
Equality in Housing The National Policy Context – Brief snap shot. Rhyan Berrigan Policy Officer - Access & Transport.
Niall Byrne, Deputy Director, Social Services Inspectorate, HIQA.
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
Generic Employability Skills Centre for Developing and Evaluating Lifelong Learning (CDELL)
School Improvement Service in Partnership with National and local approaches from England that raise the capacity of organisations to deliver careers advice.
Presentation for Club Development Information Seminar - August 28, 2010 Club Committees – Roles, Structures and Meetings A Set of Standards for Club Committees.
“Framework for mainstreaming Ireland's experience" Siobhan Barron Director National Disability Authority Ireland.
Evaluating the impact of careers guidance for continuous improvement
Bracknell Forest Council: Evaluation of the Domestic Abuse Perpetrator Service (DAPS) Liz Phillips.
Corporate Services Grants Programme 2013 – August 2012.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Performance Review and Staff Development (PRSD) The Role of Governors Governor Reviewer Training.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Partnerships for the Future Implementing a sustainable framework of partnership working with service users and other partners Thursday 2 May 2013 Giving.
Developing Cultural Tourism In Wales Nigel Adams Head of Policy & Regeneration Visit Wales Reväst Conference on Cultural Tourism Goteborg 7 th May 2010.
18 th Annual LAPFF Conference December 2013 Social Impact Investing Brian Bailey.
GLA REVIEW The Government’s Proposals for Additional Powers for the Mayor of London and London Assembly.
IN YEAR MONITORING & BUDGET PREPARATION WORKSHOP PREPARED BY BUDGET OFFICE MAY
Needs Assessment: Young People’s Drug and Alcohol Services in Edinburgh City EADP Children, Young People and Families Network Event 7 th March 2012 Joanne.
The role of governance in self-assessment NATSPEC conference Sue Preece HMI March
Developing a result-oriented Operational Plan Training
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Assessing the Value of Training  Training can result in improved profitability for XYC while lowering staffing costs.  Training can result in a higher.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
STRATEGIC PLANS, BUDGETS AND ANNUAL REPORTS Presentation to Portfolio Committee on Arts and Culture 11 March 2008.
Seminar "Imovinski standard", 29. i 30. lipnja Spatial Planning in Ireland Farannán Tannam, MRICS, Dip.A&F.
Supporting Voluntary Action in Argyll and Bute Benefits for support networks, front-line organisations and Community Planning Partners Presentation to.
Getting it Right for Every Learner in Renfrewshire: A Partnership Approach for Additional Support Needs (Draft Revised Renfrewshire ASL Act Implementation.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Review of Sub-National Economic Development and Regeneration.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
VCFP Review Report from the VCFP Steering Group. Why Review VCFP The external environment that we work in is significantly changing; there is a shift.
Australian Injury & Disability Insurance Network AIIN Health Special Interest Group & ICT Geelong November
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
Lizanne Conway NHS Health Scotland SURF OPEN FORUM 25 January 2007 Community-Led Supporting and Developing Healthy Communities Task Group HEALTHY COMMUNITIES:
OFFICIAL – SENSITIVE English Language Requirement for Public Sector Workers Draft Code of Practice Consultation.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Kathy Corbiere Service Delivery and Performance Commission
Scheme to Support National Organisations Application Guidance 19 th January, 2016 Pobal is a not-for-profit company that manages programmes on behalf of.
Framework for Excellence What is the Framework? The Framework is the Governments National Assessment Framework for Education and Training Public.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Leading Nottingham Programme update to ACOS 7 September 2010 Angela Probert Director of HR and Organisational Transformation Contributions from Lisa Sharples.
Joint Contracting and Accreditation Process Nottingham City Council and NHS Nottingham City CCG.
Wellbeing through Partnership: Collaborating for Improvement in West Wales Martyn Palfreman Head of Regional Collaboration 23 March 2016.
CII Assignment Techniques A Half-Day Practical Course Mark Butterworth Risk West Copyright: Condie Risk Consultancy Ltd.
Liverpool City Region Employment and Skills opportunities 5th July 2016 Rob Tabb.
Meeting Standards and Expectations in the Water Industry
Accounting Standards Board Annual Report 2006
EXECUTIVE’S ROLE IN CHALLENGING THE BUDGET: THE NIGERIAN EXPERIENCE
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
strengthening the elements of governance in Tajikistan
The guiding principles of prudent healthcare
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
The ‘New’ NHS – The Challenges for Children’s Service
Regulation 4 - Elements of the Plan
Roles and Responsibilities
Presentation transcript:

National Training Survey 2009 Presentation to 13 th Annual Conference of Water Services Training Group White’s Hotel, Wexford 10 th September 2009 Presentation made by John Conway Training & Development Executive with LGMSB

Aim of today’s presentation Provide delegates with the following answers;  Why was this National Training Survey conducted?  How was it conducted?  What questions did the survey ask?  What were the findings for the water services sections of local authorities?  What use will this information be? Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009

What is the LGMSB? The Local Government Management Services Board (LGMSB) was established in 1997 to be a centre of excellence in the provision of management services, HR and IR support & advice to local authorities. One of key goals of the HR division is to provide guidance, advice and support to local authorities on how to effectively address the training & development needs of their employees. National T&D steering committee established to guide and direct work of LGMSB and to ensure a level of co- ordination with other bodies (e,g.) national training group and RTCs, by means of joint committee membership. LGMSB is currently merging with the LGCSB to form the Local Government Management Agency (LGMA)

Training Survey or TNA? Survey covering more than TNA. Not a detailed TNA of each grade/staff position. Training survey designed to identify issues and approaches to training across the local government sector as well as identifying what training is specifically required by what sections of staff in each business unit. Survey designed to provide greater linkage between training needs of staff and business objectives. Assumptions being that in current economic climate (i) training budget will be cut; and (ii) business need will be prioritised over career development by employing local authorities

Objective of conducting survey This National Training Survey is intended to assist the National Training & Development Steering Committee and the LGMSB in achieving the following objectives: To identify the current and future staff training and development requirements of local authorities as measured against the business priorities of the sector; To determine the impact of budgetary constraints on current and future delivery of staff Training and Development activities; To identify the current gaps in the skills, knowledge and behaviours of local authority staff that are being identified through the PDP portion of the PMDS process; To determine the extent to which various training interventions are being employed by local authorities in order to deliver targeted and value for money staff Training & Development; and To identify the extent to which barriers exist within local authority structures that impact upon the take up of staff training & development

Structure/content of survey Comprised of 6 sections Section 1 for completion by business units Section 2 for completion by SMT Sections 3 – 6 were completed by TOs 3 : impact of budgetary constraints on staff T&D 4 : skills gaps identified through PDPs 5 : training interventions in use within LAs 6 : barriers to training

Questions for business units Training priorities for business units for 2009 – 2010 based on identified business plan objective and pressing business issues Business units were asked to estimate the numbers of staff needing this training Identify what impact the likely budgetary constraints will have on the manpower requirements of the business unit

Rank the overall priorities for staff T&D for the next 2-3 years. Identify cross functional training needs (if any) Identify what impact the likely budgetary constraints will have on the provision of staff T&D. What approach will the local authority be taking to the provision of educational assistance in the coming years? Questions for SMTs

Questions for Training Officers What training needs for specific staff grades are the PDP’s identifying? How linked are training needs identified through the PDP’s to the business plan/team plans of each business unit? What type of training interventions are employed in your local authority? What organisational barriers (if any) are faced by staff wishing to attend training and/or development opportunities

Timeframe for survey completion Letter issued (April 09) to all CCM’s on how the survey was to be conducted. Survey was distributed to all Training Officers (April 09) Business units completed and returned section 1 survey forms to the Training Officers Training Officers collated the information and made return to LGMSB using online survey form. (May/June 09) LGMSB collated all 34 survey responses IPA engaged to do analysis of result findings and to draft report First draft of report is to be presented to the National Training & Development Steering Committee on16th September National Training & Development Steering Committee to work with IPA and make recommendations on staff Training & Development arising from report Recommendations and report to be issued to County & City Managers and Training Officers before completion of estimates process

Response rate to date Big thank you to all SMTs, staff in business units and Training Officers for all the hard work put in! 34 responses received 30 returned with all sections completed + 4 partially completed

Results – Water Services 15 out of a possible 34 local authorities supplied a response for water services (44% response rate) The 15 submissions received were made up of 13 distinct water services sections identified as individual business units and 2 sections grouped together with transportation as infrastructure business units

Business issues highlighted by Water Service units The business issues highlighted by the Water Service Units can be grouped together under 6 main headings (see table 1) Water services legislation Ensuring and maintenance of water quality Treatment of waste water Water supply conservation including leak detection Funding for capital programmes including water services investment programme Water pricing and water metering

Training needs associated with business issues – General Themes from Responses 72% of responses indicate that water services staff will require further training to deliver on all or some of the identified business issues and cover for staff shortages 13% of the water service units that completed the survey indicated that they felt no additional skills training was required to carry out existing services Ongoing budgetary constraints and the general economic climate and the impact they are or will have on the delivery of quality water services to the public are a cause of major concerns for 20% of those sections that completed the survey return Staff training will be needed in most current work activities as local authorities shift from project management of external consultants to direct provision of services with in-house staff. Staff will assume new responsibilities Training requirements will depend upon the existing skills of staff assigned to projects or assigned new responsibilities. Some may not need training, others will.

Staffing issues which will require some upskilling of remaining staff 20% of those that completed the survey indicated that the loss of experienced staff will be an ongoing issue as well as a potential public health risk. Potential shortfall in resources necessary to meet statutory obligations (e.g.) monitoring. Increased public demands.

Training Needs - specifics ( refer to table 2 ) L & D opportunities aimed at improving knowledge and understanding of existing and likely water services legislation as well as enforcement and obligatory issues can be identified as the main priority. Need is across all grades within water services sections. Numbers needing training are nearly twice as many as any other need. Training in the management and operation of water and waste water treatment plants is a need that extends right across from admin, engineering/technical and operational staff. Specialised technical training for engineering/technical and operational staff. Lots of examples were given without any being clearly identified as being a high need across all local authorities. The main ones identified were technical skills in relation to SCADA, water conservation training, IT training in specific software packages, etc. Health & Safety is identified as the third largest single need. However this training is mainly generic Health & Safety training and not specific to water services per se.

Next Steps – Reporting & Recommendations Report findings to be considered by National Training & Development Steering Committee. Final draft report including recommendations to be published before end of estimates process Report will include chapter on the various business units that submitted sufficient completed section 1s As with the other business units the Water services chapter will include final, conclusions, identify priorities and make recommendations as to how the training needs can be addressed for those sections As well as distribution to individual local authorities report will be distributed to all relevant bodies and committees (ie) CCMA, National Training Group and committees, RTCs, etc., Recommendations and prioritisations contained in the report will assist individual local authorities when it comes to prioritising their own training needs and allocating resources accordingly over the coming year (s) Provide steer for LGMSB regarding sectoral needs.

Questions? Contact: John Conway Training & Development Executive LGMA Telephone No. (01)