EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015.

Slides:



Advertisements
Similar presentations
Philip ter Woort Director, Head of Office Egypt
Advertisements

Developing Infrastructure Projects. Contents InfraCo Infrastructure Project Development InfraCo’s Role How InfraCo Operates InfraCo in Indonesia.
   EBRD Project Finance Achievements in the region Hildegard Gacek Director, Romania January 2003 EBRD Project Finance Achievements in the region.
March 2012 Abraaj Capital Private Equity and shipping in the Middle East.
EBRD - an investor role in promoting public procurement reform Eliza Niewiadomska Office of the General Counsel.
EBRD Financing for Rural Communication Infrastructure Tokyo August 2004   
17 May 2011 Evgeny Smirnov © European Bank for Reconstruction and Development 2010 | European Bank for Reconstruction and Development Procurement.
Technical Cooperation to Improve Transparency and Accountability of Public Procurement in Transition Countries MICHEL NUSSBAUMER Head of Legal Transition.
CHAPTER 8 A framework for interpretation
Energy Efficiency in the EBRD’s operations and opportunities for technical cooperation Aleksandar Hadzhiivanov, Energy efficiency specialist Energy Efficiency.
The World Bank Group Instruments. The World Bank World Bank Group financing and risk mitigation instruments IBRD/IDA MIGAIFC IBRD Loan for middle income.
The European Bank for Reconstruction and Development: Regional Leader in its Countries of Operations Founded in 1991 after the disintegration of the Soviet.
EBRD and the GEF Combining Capacity Building and Investment.
0 EBRD views with respect to gas sector restructuring Marko Kecman Associate Banker, Power & Energy Utilities Vrnjačka Banja, Serbia 4 th October 2005.
Public Transport Investment financing
An Expanded Role for EBRD in Mining Finance: Exploration Stage Equity
EBRD Financing Wind Energy in Central and Eastern Europe Peter Hobson EWEC 2006, Athens.
Working with EBRD – Consultant Opportunities for Dutch Consultants The Hague, 22 May 2013 Getting started, being prepared and identifying EBRD consultant.
Financing mining projects. Environmental and H&S aspects in EBRD decision making MINEX Central Asia – April 2014.
June 2013 Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Infrastructure Russia and Central Asia.
March 2012 © European Bank for Reconstruction and Development 2010 | Financing and investment in Russian power industry European Bank for.
Property Finance by EBRD
Risk & Business Risk Sergeeva Irina Ph.D., Professor.
EBRD Transport Sector Overview “How to do Business with EBRD – EBRD Market for Slovak Consultants” Christopher Ousey Senior Advisor, Transport Team Bratislava,
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Supporting Private Education in Emerging Markets September 2010.
EBRD support to private enterprises in Serbia 28 May 2013 DSW Conference on EE.
Developing Euro-Asian Transport Linkages Christopher Ousey, Senior Banker, Infrastructure Business Group, EBRD Almaty 9 March 2004.
23 April 2012 Cairo © European Bank for Reconstruction and Development 2010 | Introduction to the EBRD and its Mandate in Egypt Rudolf PutzFrancis.
© European Bank for Reconstruction and Development 2011 | EBRD Financing for Sustainable Energy Investments Remon Zakaria Business Development.
OVERVIEW OF CAPITAL MARKET DEVELOPMENT IN THE LAC REGION Carolin A. Crabbe Infrastructure and Financial Markets Division INTER-AMERICAN DEVELOPMENT BANK.
- 1 - The Role of IFIs in CEE Securitisations The EBRD Perspective Tõnu Pekk Senior Banker, Non-Bank Financial Institutions & Structured Finance.
World Bank Energy Sector Lending: Encouraging the World’s Addiction to Fossil Fuels Heike Mainhardt-Gibbs Bank Information Center – March 2009.
Financing Opportunities through the EBRD. What is the EBRD?
EBRD: Financing metals and mining projects Astana Mining and Metallurgy 13 June 2014.
Public Private Partnerships (PPPs) and The World Bank
International Seminar on Energy Cooperation in Northeast Asia : Directions and Implementation Korea Energy Economics Institute Financing of Energy Infrastructure.
Hans Christian Jacobsen Recent developments in Agribusiness in EBRD Rome 2005.
13 February 2013, Bishkek Honma Masaru Director for Central Asia, EBRD © European Bank for Reconstruction and Development 2010 | EBRD’s Activities.
European Investment Bank Group
Financing Innovation March 25, 2004 Knowledge Economy Forum III Budapest, Hungary NATIONAL INNOVATION FUND KAZAKHSTAN.
IFC’s Financing Instruments. IFC’s Mission To promote sustainable private sector investment in developing countries, helping to reduce poverty and improve.
EBRD: Understanding the Drivers for Russian Asset Securitisation Tõnu Pekk Principal Banker Structured Finance and Securitisation.
April 2013 © European Bank for Reconstruction and Development 2010 | Working with the European Bank for Reconstruction and Development Rogier.
ALIGNING LOCAL BANKS TO FUND MINING ACTIVITIES IN ZIMBABWE Presented By Robert Thomas Zawaira Presented By Robert Thomas Zawaira.
Washington DC New York City London Kiev Moscow Hong Kong Tokyo IETG International Environmental Trading Group (“IETG”) Ukraine – Kiev “Ukraine’s First.
1 The support of the European Investment Bank for EU water and wastewater projects - Lending Policy & Eligibility - Loan approval process Pierre-Emmanuel.
European Regional Development Fund EUROPEAN UNION Investing in your future Operational programme „Development of the competitiveness of the Bulgarian economy“
Access to Sustainable Energy for LAC: Solutions to Regional Challenges Structured and Corporate Finance Department Rachel Robboy Pr. Investment Officer.
European Bank for Reconstruction and Development Financing Renewable Energy Projects in Bulgaria Anton Kobakov Senior Banker RO Sofia, Bulgaria.
© European Bank for Reconstruction and Development 2010 | SOUTHERN & EASTERN MEDITERRANEAN REGION European Bank for Reconstruction and Development.
Opportunities for investing in EBRD’s region: Kazakhstan Janet Heckman, Director for Kazakhstan Taipei, 8 September 2015.
Energy Efficiency in Public and Private Sector Serbia and Western Balkans Belgrade, 15 December 2015.
Funding private projects in challenging markets March 2010.
EBRD – Supporting SME business
Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Transport Team 12 March 2013.
Financing Residential Energy Efficiency in South-East Europe
IETG Kiev Office Overview
EBRD in Greece July 2016.
EBRD in Greece October 2016 Financing Growth
OFFICIAL USE Investment Forum: Investing for change in developing markets Introduction to EBRD and standard investment procurement Opportunities Taipei,
EBRD investing in Croatia
Working with the European Bank for Reconstruction and Development
EBRD in Greece July 2016.
EBRD Agribusiness December 2016
The New Bank and Private Sector Activities
Aleksandar Nikcevic, Principal Banker
ADB’s experience with financing renewable energy projects
EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015.
Investment, Trade & Transport Facilitation
Presentation transcript:

EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015

Agenda What is EBRD EBRD in Central Asia Energy and Natural Resources, Russia and Central Asia team EBRD goals The New Subsoil Use Code EBRD products and approval process

EBRD in numbers €95bn invested since 1991 4,188 projects What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts €95bn invested since 1991 4,188 projects €38,7bn portfolio in 2014 85% debt and 10% equity and guarantee 5% 70% of portfolio in the private sector in 2014 €8.6bn invested in 2014 377 projects signed in 2014 AAA/Aaa rated institution

38 offices and 34 countries. Half of banking team in the region. Where do we operate? What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts 38 offices and 34 countries. Half of banking team in the region.

Present in Central Asia since 1993 What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts Portfolio Composition Presence on the ground 6 offices Number of projects to date 547 Net cumulative Bank investment €9,178*m Portfolio €3,263*m Operating assets €2,248*m Private share of portfolio 59% Number of projects in 2014 71 Annual Bank Investment in 2014 €803*m * data for January 2015 Annual Bank Investment & Operations © European Bank for Reconstruction and Development

ERCA: Dedicated sector approach and multidisciplinary teams What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts Key sectors O&G extraction, transportation, refining Mining & Services Power Our Team 11 professional bankers focused on Russia and Central Asia Permanent presence in: Almaty, Astana, London, Moscow Technical expertise through in-house engineers Power, petroleum, downstream, mining engineers

EBRD goals What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts Support of the private sector and transition to market economy Environmental and Social Policy plays a crucial role (IED, BAT) Energy, Resource and Material Efficiency, helping companies to advance on the cost curves Supporting transparency in the sector (e.g. EITI, PWYP) Attraction of other lenders and third party finance Regulatory best practices Long-term agenda to reduce GHG emissions through market based mechanisms, Gas Flaring Reduction

The New Subsoil Use Code What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts The Bank is engaged with the Government, industry associations and companies to develop a new Subsoil Use Code. The new Subsoil Code will regulate all operations covering exploration and production activities for oil, gas, metals and commonly occurring mineral resources. Ministerial Working Group. The Bank invited as a participant to focus on: Preparation of the plan for transfer from the Soviet GKZ reserves and resources evaluation standards to internationally recognised standards; Improvement of HSE regulations in subsoil use; Improvement of administration of the subsoil use contract and decreasing the level of Government regulation in the subsoil sector. What would help to make projects bankable: Guaranteed transition from exploration into production stage Subsoil users shall have more freedom in making investment and engineering decisions when the Government would focus on HSE and social aspects of the project Introduction of international standards, including reserve and resources evaluation standards Possibility to pledge subsoil use contract to banks Tax incentives to early stage prospecting or exploration projects

Market conditions and trends in financing What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts Price dynamics of certain commodities New asset development This type of investment project is very rare in the current market conditions and availability of investments Modernisation and improvements of an existing asset The companies are interested in improvements of existing assets to reduce cost base (cost curve) and increase efficiency of operations: investments in new mining equipment; energy efficiency and increased production efficiencies at processing and metallurgical stages, EHS aspects, etc.

EBRD Product Flexibility and Approval process What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts Loans Equity Project-based financing to public or privately-owned companies and concessionaries Senior, subordinated, convertible LT (up to 10 years or more) or ST revolving Floating / Fixed rates. Choice of currencies (€, $, KZT) Possibility to structure A/B financings and syndicate to market Common stock or preferred Minority position only (up to 35%) Mezzanine Other Partial guarantees Currency swaps Bonds TCs and facilities Approval Process Concept Review Structure Review Final Review Board Approval Signature Due Diligence Technical/Commercial feasibility Final negotiation

Contacts Aida Sitdikova Yerlan Ramazanov What is EBRD EBRD in Central Asia ERCA team EBRD goals Subsoil Use Code Project Support Instruments Contacts For all further enquiries, please contact: Aida Sitdikova Director Energy & Natural Resources Russia & Central Asia Tel: +7 495 787 1111 (ext. 103) Email: SitdikoA@ebrd.com Yerlan Ramazanov Principal Banker +7 7172 580 204 (ext. 113) Email: RamazanY@ebrd.com EBRD, One Exchange Square London, EC2A 2JN United Kingdom www.ebrd.com