1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
EQUIPMENT VALIDATION.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Building Commissioning
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
WCI LEA UPDATE MAY 2, 2014 RI Department Of Education Wireless Classroom Initiative Cynthia Brown, Director Office of Statewide Efficiencies Craig Hockenbrough,
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
Module 7: Construction Phase
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Commissioning HVAC Systems: Lessons learned throughout
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Director’s Progress Review Closeout Meeting
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
CONTRACT DOCUMENTS & CONSTRUCTION
Director’s Progress Review Closeout Meeting
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Construction Management Services April 16, 2018
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities Advisory Committee Review October 5 & 6, 2010

2 BROOKHAVEN SCIENCE ASSOCIATES As-Builts & Cx Status Outline As-Built Drawings Contract Requirements Status of As-Built Drawings Commissioning Contract Requirements Status of Commissioning Issues and Challenges Path Forward Conclusions

3 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings Contract Requirements DOCUMENT PROJECT CLOSEOUT 1.5 RECORD DRAWINGS A. Maintain a clean, undamaged set of blue or black line white-prints of Contract Drawings and Shop Drawings at the job trailer. Mark up these drawings to show the actual installation on an on-going basis. Mark whichever drawing is most capable of showing conditions accurately. Give particular attention to concealed elements that would be difficult to measure and record at a later date.

4 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings Contract Requirements 1.5 RECORD DRAWING –1. Organize Record Drawing sheets into manageable sets, bind with durable paper cover sheets, and print suitable titles, dates and other identification on the cover. –2. LT will review and approve the record drawing set on a monthly basis. –3. The monthly updates will be part of the detailed breakdown and the value approved by LT. –4. The Record Drawing updates and payment will only be made after the review and approval of the Record Drawings by LT. –5. Upon completion of the Work, submit Record Drawings to LT for their records.

5 BROOKHAVEN SCIENCE ASSOCIATES Status of As-Built Drawings Contractor and subs have maintained as-built drawings Inspectors review as-built drawings as part of the monthly requisition process As-builts for work outside of fence have already been turned over to BNL F&O As-builts will be turned over for each milestone/phase Site as-builts are being turned over to LOB contractor

6 BROOKHAVEN SCIENCE ASSOCIATES Electrical Ductbank As-Builts

7 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Contract Requirements SECTION BUILDING COMMISSIONING 1.1 DESCRIPTION A. This Section includes: –1. Scope of commissioning work. –2. Contractor’s commissioning responsibilities. B. Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent, basis of design, construction documents, and BNL’s system operational needs. The commissioning process coordinates system documentation, equipment startup, control system calibration, testing and balancing, performance testing, and operator training.

8 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Contract Requirements 1.4 COMMISSIONING TEAM A. BNL will provide overall coordination and management of the commissioning program as specified herein. B. The commissioning team shall be comprised of the following: –1. Contractor: Project Manager and MEP Coordinator. –2. Subcontractors: As required by the prime contractor. –3. Manufacturers’ factory engineers: As specified elsewhere. –4. Test Engineer, contracted by BNL

9 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Agent BVH Integrated Services Contract Awarded October 2008 Commissioning Agent for CFN Scope of Services – Ring Building and LOBs Design Phase –Develop Commissioning Plan –Review Design Construction Phase –Submittal Review –Witness Start Up –Functional Testing

10 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Agent (continued) Scope of Services Continued Construction Phase –Develop Training Manual and Train Staff –Review O&M Manuals and Warranties Warranty Period –Facilitate Warranty Compliance –Near Warranty End Review

11 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Status Commissioning Plan In place Reviewing Ring Building Submittals and RFIs Monthly Meetings With Torcon –Introduction to Torcon and their Subcontractors –Reviewed Commissioning Flow Chart –Reviewed Commissioning Plan –Reviewed Schedule (Identified Inspection and Start-up Dates) –Identified Roles and Responsibilities (Support BVH Cx) –Discussed BVH Commissioning Portal –Building Turn-over

12 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Flow Chart

13 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plan

14 BROOKHAVEN SCIENCE ASSOCIATES Pre-Functional Checklist

15 BROOKHAVEN SCIENCE ASSOCIATES Issues and Challenges Focus on as-built drawings for Phase 1 Commissioning for Phase 1 includes all utilities Permanent power is 2 weeks behind schedule Operation and Maintenance manuals Develop Training Program (Contractor) Properly schedule startup and commissioning Often compressed as construction nears completion

16 BROOKHAVEN SCIENCE ASSOCIATES Path Forward Continue monthly reviews of as-built drawings Identify as-builts required for phase 1 Contractor needs to get permanent power back on schedule Ramp up commissioning process Identify all commissioning required for Phase 1 Start to involve BNL’s F&O for Phase 1 Finalize and track Contractor’s startup and commissioning checklist Coordinate commissioning and BORE

17 BROOKHAVEN SCIENCE ASSOCIATES Conclusion Project team and contractor recognize importance of quality and timely As-built drawings Implementation of As-built requirements going well Commissioning process entering implementation phase O&M staff will be engaged throughout the process