SAUDI ELECTRICITY COMPANY (SEC)

Slides:



Advertisements
Similar presentations
INVESTMENTS IN POWER SECTOR
Advertisements

Bosnia and Herzegovina
Electricity Restructurings: The Legal Perspective Robert Lane CMS Cameron McKenna (London)
Houston Region Import Capacity Project Planning for Reliable Power.
Saline Water Conversion Corporation
Arizona Electric Power Cooperative, Inc.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
By Abdul Rahman A. Al-Tuwaijri Deputy Minister of Industry & Electricity Kingdom of Saudi Arabia April, 2000 April,
SAUDI ELECTRICITY COMPANY (SEC)
The Need for an Energy Grid in the Maldives
Optimal Distributed Generation Placement Considering Voltage Profile Improvement and Loss Reduction: Case Study on Iranian Distribution Network STSD 2014.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
The Role of Energy Conservation and Efficiency in Saudi Arabia in Long - Term Sustainability Dr.Abdulrahman A. Al-Tuwaijri Deputy Minister for.
Power Generation Projects
Overview of the latest developments of the Hungarian energy market Mr. György Hatvani Deputy State Secretary of energy and industry Ministry of Economy.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Montana Ambassadors Helena, Montana February 25, 2011.
The Technical &Economical Impacts of the Upgraded Rehab Power Plant in Jordan Eng. Mamoun Shehadeh Operational Planning Department National Electric Power.
Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005.
ESB Presentation Oireachtas Committee 2 nd November 2005.
Charles Hosken, General Manager Imperial Irrigation District
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Electricity Reforms in Bangladesh
Turkish Power System Overview March 2012
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
ENERGY MIX IN SENEGAL WHICH ONE TO CHOOSE? General Directorate APUA CONGRESS. LUANDA 2014 Safiétou DIALLO Technical Adviser.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Smart Power Generation in Jordan, IPP3 and IPP4 Case study.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
National Grid SA Company
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Energy Agency of the Republic of Serbia
National Governors’ Association April 5, 2001 James Mahoney PG&E National Energy Group and any other company referenced herein which uses the PG&E name.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Puerto Rico Electric Power
CONTENTS INTRODUCTION WATER AND POWER DEMAND CHALLENGES WHY PRIVATIZE?
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
POWER SECTOR, ENERGY RELATED RESEARCH POTENTIAL in LITHUANIA by dr. Anzelmas Ba čauskas Lietuvos energija AB, Lithuania CENTRAL-EASTERN EUROPEAN ENERGY.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Challenges for Wind Farm Development in Bulgaria: The Environmental Aspect Case study: Saint Nikola Wind Farm, Kavarna April 2009.
Electricity & Regulatory Overview of Korea
Chairman of the Board and CEO,
Population – 2015 (Million)(2) Energy Generated (TWh) (1)
Damitha Kumarasinghe Director General
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Development of an Integrated Energy Market in Saudi Arabia
Ensuring Security of Supply in Estonian Transmission Grid
EE6501 POWER SYSTEM ANALYSIS
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Evolving Economic Dispatch in SPP
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Yangon Region Rural electrification plan
2018 RTEP Report Key Maps, Tables & Figures
Presentation transcript:

SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA Presented By SAAD M. AL DEKHAYL SEC Consultant Orlando, December 2012 Power Gen 2012

SEC Organization Structure Distribution Overview Transmission Overview CONTENTS Introduction SEC Organization Structure Distribution Overview Transmission Overview Generation Overview 2

INTRODUCTION 2

INTRODUCTION Saudi Electricity Company (SEC) was established in 2000 as a Saudi Joint Stock Company with paid-up capital of SR (33.7) billion. SEC is (74%) owned by the Government and (7%) owned by Saudi Aramco, amounting to (81%) Government owned SEC provides power generation, transmission, distribution & customers services, either by itself or by its ssubsidiaries in the Kingdom of Saudi Arabia. 3

SEC MAJOR ROLES AND RESPONSIBILITIES Provide stable and reliable power supply for all customers in the kingdom. Committed to infrastructure investment in Generation, Transmission & Distribution networks. Establish an interconnected grid throughout the Kingdom, to enable the optimum means of stability, reliability and economical operation. Develop a competition in the field of Independent Power Producers (SEC-IPPs). Import and export power across the borders and invest in power projects outside the Kingdom. Perform and support Research & Development in the fields of Performance Improvement, Economical Operation, Environment Protection, Power Conservation, Renewable Power, Services Enhancement,…etc. 3

SEC ORGANIZATION RESTRUCTURE 5

SEC ORGANIZATION RESTRUCTURE SEC is in the process of unbundling into SEC & Six Fully Owned Subsidiaries, to comply with the objective to reach energy open market in stages, (single buyer, principle buyer and eventually open market). The Subsidiaries will be as follows: Four Generation Companies (GENCO’s), One Transmission Company (National Grid), One Distribution Company (DISTCO ), The preparation of the unbundling program started in 2007, and the final set up was approved in 2010. In order to ensure maximum success, the program implemented in stages as follows: Restructured SEC go live: Jan, 1, 2012 National Grid go live: Jan, 1, 2012 Four GENCO’s go live: Jan, 1, 2014 DISTCO go live: Jan, 1, 2014 5

SEC GENERATION RESTRUCTURE SEC Power plants were allocated to each GENCO to create a Balanced Grouping taking into consideration Technology, Type Of Fuel, Operational Costs, Average Age, Retirement etc: GENCO’s at 2014: GENCO “D” (MW) GENCO “C” GENCO “B” GENCO “A” Technology 4,090 5,517 7,262 6,612 Gas Turbine 3,867 1,200 2,606 Combined Cycle 4,192 5,538 5,056 4,376 Steam Turbine 12,149 12,255 13,518 13,594 Total GENCO’s By 2021: GENCO “D” (MW) GENCO “C” GENCO “B” GENCO “A” Technology 3,282 2,667 6,528 3,804 Gas Turbine 3,867 3,800 1,200 3,371 Combined Cycle 10,636 10,338 8,656 10,376 Steam Turbine 17785 16,805 16,384 17,551 Total 6

DISTRIBUTION OVERVIEW 9

DISTRIBUTION NETWORKS: SEC Distribution networks cover the whole country with the voltages below 100 KV. Distribution Networks Growth during 2011: Length of Distribution Networks ≈ 26,000 CKM. Distribution Transformers ≈ 24,000 Transformers Transformers Capacity ≈ 11,000 MVA New Customers ≈ 360,000 Customers Newly Electrified Towns and Villages ≈ 266 Energy soled ≈ 220,000 GWH Distribution Networks (By the end of 2011): Total Circuit Lengths ≈ 410,000 CKM. Total Distribution Transformers ≈ 345,000 Transformers Total Transformers Capacity ≈ 160,000 MVA Total No. of customers ≈ 6.3 millions Total No. of Electrified Towns and Villages , ≈ 12,300

TRANSMISSION OVERVIEW 11

EXTRA & HIGH VOLTAGE TRANSMISSION NETWORKS (above 100 KV) The interconnection of the four SEC Area Networks (Central - Eastern - Western - Southern), was completed in 2010. The small (9) isolated networks: (Tabouk - Al Qurayyat - Aljouf & Arar - Rafha - Tabarjal - Deba - Alwajh & Al Oula -Wadi Dawassir– Sharorah), will be linked to the interconnected networks before 2016, (except Rafha and Sharorah which will remain isolated networks for at least the Plan period 2021). Transmission Networks Growth during 2011: Length of transmission networks ≈ 2,200 CKM. Transmission transformers ≈ 100 Transformers Transformers capacity ≈ 13,000 MVA Transmission Networks (by end of 2011): Total length of transmission networks ≈ 50,000 CKM. Total no. of substations ≈ 642 substations Total no. of transformers ≈ 1,900 Transformers Total transformers capacity ≈ 175,000 MVA SEC’s transmission network comprises both underground and overhead cables rated from 110kV to 380kV It has grown at an annual rate of 3.6% from 2000 to 2007 12

Networks Interconnection Projects PLANNED TRANSMISSION INTERCONNECTION PROJECTS (380 KV) Commissioning Year Networks Interconnection Projects 2013 Hail – Al Jouf Qassim – Madinah Stage 2 Interconnection of Qaisumah 2014 Tabouk – Dhibah Tabarjal – Qurayyat Jizan – Najran 2017 Eastern – Central 5th Interconnection 2015 Southern region - Wadi Aldawasir Madinah – Hail 2018 Central - Western regions HVDC Link Tabouk – Madinah HVDC Link 2016 Western – Southern 2nd interconnection Debha – Wajh / Ula Yanboa - Umlaj Boosting Connection of the western- Southern Region Tabouk – Eygpt HVDC Link Tabouk – Tabarjal Al Jouf – Tabarjal 2019 Boosting Interconnection of Madinah - Hail Al Kharj – Al Aflaj - Wadi Aldawasir The focus will be on: Extending the current network Improving network efficiency Interconnecting isolated regions Linking new generation units to the existing grid This is a planned capital budget and is not committed expenditure 13

Interconnected Networks By 2019 PLANNED & EXISTING (380 KV) TRANSMISSION INTERCONNECTION Interconnected Networks By 2019 The focus will be on: Extending the current network Improving network efficiency Interconnecting isolated regions Linking new generation units to the existing grid This is a planned capital budget and is not committed expenditure 14

PEAK LOADS FORECAST (MW) SEC NETWORKS PEAK LOADS FORECAST (2012 - 2021) Networks PEAK LOADS FORECAST (MW) 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Central & Eastern 29,925 32,790 35,065 37,675 39,990 42,755 44,805 46,815 48,950 51,155 Isolated Networks 1,230 679 730 459 121 128 135 144 152 160 Western 14,315 15,770 17,230 18,430 19,780 21,935 23,275 24,595 25,805 27,040 898 972 1,047 1,132 Southern 4,058 4,450 5,180 5,665 6,140 6,520 6,900 7,255 7,610 7,940 104 112 119 126 132 139 146 154 164 175 Total 50,530 54,773 59,371 63,487 66,163 71,477 75,261 78,963 82,681 86,470

GENERATION 16

TOTAL EXISTING GENERATION CAPACITY South West Central East Units Type 13,986 - 7,110 6,876 Steam 7,883 965 3,595 3,323 Combined Cycle 22,749 3,410 5,400 9,752 4,187 Gas Turbine 211 193 18 30 Diesel 44,832 3,603 13,494 13,349 14,349 SEC Total 1,216 602 614 SEC (SEC-IPP) 1,750 850 900 WEC (IWPP) 7,230 60 700 6,470 Non-SEC 10,196 910 2,202 Total (SEC-IPP, WEC& Non-SEC) 55,028 4,513 15,696 13,963 20,886 Grand Total Up To the end of Summer 2012 15

Generation Projects Up To 2021 16 18

SEC GENERATION PROJECTS (UNDER CONSTRUCTION) Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW 2008 Al Jouf PP (GT) 56 Diesel 2012 2009 Al-Qurayah 2 PP (Steam Phase) (CC) 260 - 2013 2010 Al Qurayyat PP Ext. (GT) 136 Crude PP 10 (ST Phase) (CC) 1,151 2014 345 2015 806 Rafha PP # 2 (GT) 140 Najran (GT) 112 Tabouk PP Ext. # 7 (GT) 122 Rabigh PP2 (ST) 2,555 HFO 2011 Al-Qurayah 2 PP Ext. (CC) Gas Total 4,792    17

SEC GENERATION PROJECTS (UNDER CONSTRUCTION) Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW 2011 PP 12 (CC) 1,992 Gas 2014 1,310 2015 682 Tabuk PP Ext. #8 (GT) 129 Diesel 2013 Al-Wajh /Al- Ola PP # 2 (GT) 211 Al-Jubah PP Ext. # 4 (GT) 124 Crude Al Qurayyat PP Ext # 2 (GT) 125 Sharorah PP Ext. # 3 (GT) 128 South Jeddah PP Phase #1 (ST) 2,400 HFO 2016 1,800 2017 600 2012 Shuebah (CC) 1,238 790 448 Total 6,347   18

SEC GENERATION PROJECTS (UNDER CONTRATUAL PROCESS ) Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW 2012 Rafha PP2 Ext (GT) 60 Crude 2014 Shuqaiq (ST) 2,400 HFO 2016 2013 Al Qurayyat PP Ext # 2 (GT) 120 2015 Rabigh Ext. 5&7 ST Phase (CC) 1000 1,000 Khufgi Phase # 1 (ST) 2017 Total 5,980   19

SEC GENERATION PLANNED PROJECTS (STEAM UP TO 2021) Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW 2014 Ras Abo Gumais PP Phase # 1 2,400 HFO 2019 Khufgi - Phase # 2 1,200 2018 2020 Ras Abo Gumais PP Phase # 2 2016 Al Rais PP Phase # 1 2021 2015 South Jeddah PP Phase #2 Total 9,600   20

SEC PLANNED PROJECTS (SIMPLE & COMBINED CYCLE UP TO 2021) Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW 2014 PP 13 (CC) 1,800 Gas 2018 2015 Sharorah PP Ext. # 4 (GT) 60 Crude 2016 PP 14 (CC) Total 3,660   21

SEC-IPP PROJECTS (UNDER CONSTRUCTION): Owner Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW SEC-IPP 2008 Rabigh PP # 1 (ST) 1,204 HFO 2012 602 2013 PP 11 (CC) 1,729 Gas 614 1,115 2011 Qurayah PP (CC) 3,927 2014 Total 6,860 22

SEC-IPP PROJECTS (UNDER CONTRACTUAL PROCESS): Owner Budget Year Project Capacity (MW) Fuel Type Commissioning Year MW SEC-IPP 2011 Deba PP Phase # 1 (CC) 1,800 Gas 2018 Rabigh PP # 2 (ST) HFO 2016 600 2017 1,200 2012 Deba PP Phase # 2 (ST) Total 5,400   23

NON-SEC PROJECTS (UP TO 2021) Under Construction: Commissioning Fuel Type Capacity (MW) Project Year 500 2014 Gas 1,050 SWCC Ras Alkhair PP (CC) 550 2015 Under Contractual Process: Commissioning Fuel Type Capacity (MW) Project Year 900 2018 HFO 1,850 SWCC Yanbu PP (ST) 950 2019 1,100 2017 2,200 Jazan (ST) 4,050 Planned: Commissioning Fuel Type Capacity (MW) Project Year 143 2013 Gas 2,484 ARAMCO (Mnefa , Kharasaniyah & wasite) (GT) 387 2014 1,954 2016 24

GENERATION PROJECTS COMMISSIONING SUMMARY (BY YEAR UP TO 2021) Total 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012*   MW 30,379 1,200 2,400 4,800 4,860 3,000 5,200 1,548 4,778 2,139 454 SEC 12,260 - 600 -  3,927 1717 1216 SEC-IPP WEC 7,584 950 2,000 1100 1,954 550 887 143 Non SEC 50,223 5,750 9,260 6,500 7,754 2,098 9,592 3,999 1,670 Remaining projects 2012 25

Under Contractual process GENERATION PROJECTS SUMMARY (UP TO 2021) Total % Total Planned Under Contractual process Under Construction Owner (MW) CC & GT GT CC ST 61% 30,379 3,660 60 3,600 9,600 5,980 11,139 SEC 24% 12,260 - -  5,400 6,860 SEC-IPP 0%  - WEC 15% 7,584 2,484 4,050 1,050 Non-SEC 100% 50,223 6,144 2,544 15,430 19,049 26

Generation Projects Conclusions 27 29

EXPECTED GENERATION CAPACITIES (BY 2021) Total Expected Installed Capacities Under Construction, Contractual and Planned Projects Installed Capacities Owner Up to 2021 2012 % MW 71% 75,211 61% 30,379 81% 44,832 SEC 13% 13,476 24% 12,260 2% 1,216 SEC-IPP 1,750 0% - 3% WEC 14% 15,226 5% 2,966 SEC-IPP + WEC 14,814 15% 7,584 7,230 Non-SEC 100% 105,251 50,223 55,028 Total Degradation, Retirement and Forced Outage are not included 28

SEC GENERATION CAPACITIES PROFILE

TOTAL GENERATION CAPACITIES PROFILE 4,007 MW 8% 20,823 MW 38% 22,963MW 42% 27,009 MW 54% 19,2017 MW 38% 11,242MW 20% 26,970 MW 26% 47,832 MW 45% 30,449 MW 29%

SEC SHARE OF GENERATION CAPACITIES

THANK YOU