Transelectrica SA Transelectrica’s Strategy

Slides:



Advertisements
Similar presentations
GreenCarbonLite: What We Do Monitor & Analyse:EU Climate Change policy (Focus: Renewables and energy efficiency) Provide input to:Policy developers (EC,
Advertisements

Unconventional Gas and EU Energy Policy
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Pécs Midterm review of the achievements of the Hungarian Presidency of the Council of the European Union András Rozmer Department of Strategy.
Vision for the internal electricity market
RES-E Impact on Transmission Grid and Power System Reserves
Completing the EU internal energy market IFIEC, 22 November 2011
Baltic Energy Market Interconnection Plan (BEMIP)
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Berlin, 4 December Source: ENTSO-E Ten-Year Network Developemnt Plan 2012.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Energy Policy in Romania BOGOS Zsolt, Secretary of State Ministry of Economy and Commerce, Romania - Black Sea Energy Conference - 3 – 5 April 2006, Bucharest,
Completing the EU internal energy market
ENERGY POLICY FOR SUSTAINABLE GROWTH: Economic Crossroads: From Recovery to Sustainable Growth in the Baltics and EU 24 November 2011 Reinis Āboltiņš.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Improving Network Access in Europe’s Periphery Panos Coroyannakis CPMR Energy Working Group “Energy for the Periphery” Pamplona 5-6 October 2006.
The National Centres of Competence in Research (NCCR) are a research instrument of the Swiss National Science Foundation (SNSF) The EU-Russia Energy Dialogue:
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
EU Energy Strategy
BUSINESS OPPORTUNITIES IN ROMANIA’S ENERGY SECTOR A Market Briefing U.S. Commercial Service Bucharest June 2, 2010.
Aswin Balasubramanian Imaya Senthilnathan
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
The future is near.. Most transport media in use today are generally fossil fuel powered. The reason for this is the ease of use and the existence of.
CEE REGION ELECTRICITY POWER TRANSMISSION SYSTEMS. CURRENT STATE AND THE DEVELOPMENT PROSPECTS. Jacek WAŃKOWICZKrzysztof LIPKO Instytut Energetyki,EPC.
Deploying marine renewable energy in the EU A Celtic perspective on interconnection Adam Bruce Global Head of Corporate Affairs, Mainstream Renewable Power.
Pan European Challenges in Electricity A TSO perspective Marcel Bial Senior Advisor System Development European Network of Transmission System Operators.
1 SECURITY OF SUPPLY IN THE CONTEXT OF THE ENERGY COMMUNITY Energy Community Secretariat VISION OF EUROPEAN SERBIA International Conference organized by.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
STATKRAFT PERSPECTIVES ON RENEWABLE ENERGY IN OPEN MARKETS OLUF ULSETH, SENIOR VICE PRESIDENT EUROPEAN AFFAIRS STATKRAFT AS Official Launch of the Norwegian.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
Key developments and challenges in the Nordic region - Eurelectric Members’ Day Oluf Ulseth CEO, Energy Norway Brussels, February 6, 2012.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Valeria Termini Member of the CEER GA FTS-CEER bilateral meeting, Florence 06 th February 2012 Investment planning rules in Europe.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Presentation by Greta Monika Tuckute
Smart Energy Security in the Baltics and the EU Scientific support to energy security in the Baltic Sea Region 4 July 2013, Lithuanian Academy of Sciences,
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
Energy Greece: hub for energy independence of Europe? Georgette Lalis Task Force for Greece – Head of the Athens office.
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Energy Agency of the Republic of Serbia
26/10/20151 European Investment Bank EIB Contribution to the EU Strategy for the Danube Region Ruse, 10 May 2010.
Challenges for the electricity sector from a TSO perspective Zbyněk Boldiš Member of the Board ČEPS, a.s. ASD Annual Convention – Knowledge Café 24 April.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
1 The Energy Community of South East Europe 4th Poverty Reduction Strategies Forum June 26-27, 2007 Athens, Greece Henk Busz Europe and Central Asia Region.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
| faculty of law groningen centre of energy law The role of law in regulating offshore energy production and securing energy supply Hannah.
REFITTING STRATEGY FOR ROMANIAN POWER SYSTEM SUBSTATIONS
Energy Community Secretariat Committee on Industry, Research and Energy, European Parliament Energy Community Activities and Outlook for the Future Brussels,
Supply and demand scenarios for EU27 David Blanchard, European Commission EUROPEAN COMMISSION.
ROMANIAN WIND POWER RISING Romanian Wind Energy Association.
The European Energy Union
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy Bilateral screening: Chapter.
Milka Mumović, Energy Community Secretariat En.Trading 016 Seminar
GRI-S : Infrastructures The Union list of projects of common interest
Ben Voorhorst, President, ENTSO-E
International Conference
Overview on Renewable energy in Bulgaria
RG Continental Central South
Meeting of NSOG Electricity Regional Groups Preparation of the 3rd PCI list - Identification of Infrastructure Needs Brussels, 27 October 2016.
European Investment Bank
Energy efficiency in buildings
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Presentation transcript:

Transelectrica SA Transelectrica’s Strategy Two-tier-management company Transelectrica’s Strategy in line with European goals Romanian HydroPower Market Outlook and expected developments for 2014 Bucharest, Feb 2014

Romania at crossroads i ii iii Between RGCE (ENTSO-E Continental Europe Regional Group) areas and non (or not yet) ENTSO-E areas (Moldova, Ukraine, Turkey) i Between different congestion management regions within ENTSO-E: - Central East Europe - South East Europe ii Between EU, and non-EU countries within ENTSO-E South-East Europe Regional Group (3rd EU legislative package not mandatory for all the members in the Regional Group) iii

Main challlenges faced by Transelectrica Transelectrica’s challenges facing alignment requirements with 2030 policy framework for climate and energy Integrate renewable generation ( mainly wind) and new generation capacities Development of interconnection capacity to avoid internal/regional congestion Improving adequacy of the transmission grid (full compliance with ENTSO-E standards) High investment requirements

capex program ≈1,115 Investment needs 2014-2023 (Eur mill) ≈500 Fossil Fuel PP Wind PP OHL 400kV OHL 220kV OHL 400 kV operated at 220 kV First stage Second stage New lines (> 1000 km) Upgrade/ uprate Power Flows High penetration of wind plants NPP Cernavoda Interconn. capacity increase Investment needs 2014-2023 (Eur mill) ≈1,115 Cross border ≈500 RES & Relief of associated congestions ≈265 Replacement and upgrade of aged network assets ≈350 new lines to strengthen the transmission capacity and interconnection capacity new facilities and technology change/updates facilitates the power exchanges in S-E Europe ~400 km, 800 MW, 500 kV consolidate the grid for all generation facilities in the area (renewables and nuclear)

Capex program Flagship projects (2014-2023) Cross-border ≈Eur 500 mill Undersea Cable RO-TR Cross-border ≈Eur 500 mill New interconnector RO-RS (+1000 MW export) Eur 30 mill Reinforcement of internal south-western route* to enhance cross-border interconnectivity (HU and RS) Eur 115 mill New interconnectors RO-MD Eur 105 mill New interconnector (undersea cable) RO-TR Eur 260 mill *route linking Portile de Fier (RO-RS interconnection point) with Arad (RO-HU interconnection point) RES integration and congestion relief ≈Eur 265 mill Connection OHL Isaccea-Varna and OHL Isaccea-Dobrudja in 400 kV Medgidia Sud subtation Eur 28 mill OHL 400kV d.c. Cernavodă-Stâlpu and connection in Gura Ialomiţei Sbt Eur 50 mill OHL 400 kV d.c. Gutinas-Smardan Eur 60 mill OHL 400 kV s.c. Suceava-Gadalin Eur 95 mill Upgrade to 400 kV of OHL 220 kV Brazi Vest- Teleajen-Stalpu Eur 5 mill OHL 400 kV d.c. Medgidia Sud- Constanta Nord Eur 26 mill Replacement & upgrade of existing aged network assets ≈Eur 350 mill

Cross-border interconnectivity Moldova (MD) Cross-border interconnectors (Moldova): OHL 400 kV Suceava (RO) – Balti (MD) EUR 65 mill: OHL total funding EUR 30 mill: OHL Romanian share EUR 40 mill: additional amount for back-to-back in Blati substation OHL 400 kV Straseni (MD) – Ungheni (MD) – Iasi (RO) EUR 100 mill: OHL total funding EUR 15 mill: OHL Romanian share EUR 40 mill: additional amount for back-to-back in Ungheni substation EUR 60 mill: additional amount for reinforcement of the Romania’s internal grid in the area OHL 400 kV Vulcanesti (MD) – Isaccea (RO) EUR 40 mill for back-to-back in Vulcanesti substation MD Suceava Balti Isaccea Vulcanesti Straseni Iasi Ungheni

Cross-border interconnectivity Serbia (RS) Cross-border interconnector (Serbia): OHL 400 kV interconnector between Romania and Serbia Resita (RO) – Pancevo (SE) EUR 30 mill: Romanian share in total funding requirement RS Restita Pancevo Arad Reinforcement of internal south-western route* to enhance cross-border interconnectivity (HU and RS) Eur 115 mill *route linking Portile de Fier (RO-RS interconnection point) with Arad (RO-HU interconnection point) Portile de Fier

Cross-border interconnectivity Turkey (TR) Cross-border interconnector (Turkey): HVDC 500 kV link between Romania and Turkey EUR 520 mill: total project funding requirement EUR 260: Romanian share TR Undersea Cable RO-TR Cost breakdown (EUR mill) Romania new 400 kV AC bay 2 Romania Conv Stn+link to Constanta Nord S/S 89 Romania DC Cable+OTHL+Cable Termination Stn 14 Sea HVDC cable 261 Tukey DC Cable+OTHL+Cable Termination Stn 20 Turkey Conv Stn+link to Alibeykoy S/S 81 Turkey new 400 kV AC bay Telecomunication, incl. cable Client Project Management 5 Contigencies (5%) 25

Backup slides

General EU Framework Romania’s priorities – in line with EU’s energy&climate goals The communication from the Commission entitled “Energy infrastructure priorities for 2020 and beyond — A Blueprint for an integrated European energy network”, followed by the Council conclusions of 28 February 2011 and the European Parliament resolution, called for a new energy infrastructure policy to optimize network development at European level for the period up to 2020 and beyond, in order to allow the Union to meet its core energy policy objectives of competitiveness, sustainability and security of supply. Regulation (EU) No 347/2013 of The European Parliament and Council of April 17, 2013, on guidelines for trans-European energy infrastructure defines, up to 2020 and beyond, about 12 trans-European corridors and thematic areas of priority covering the electricity and gas grids and the transmission infrastructure of oil and CO2 as well: corridors : electricity – 4 + gas – 4 + oil – 1 and 3 thematic areas :Smart grids deployment, Electricity Highways, Cross-border CO2 network

Electricity, gas, and oil routes European energy infrastructure priorities Electricity, gas, and oil routes

ENTSO-E’s TYNDP Romanian projects included in EU’s 10-year Grid Masterplan

Projected power flow patterns Romania’s electricity transmission projects bring a positive contribution towards the enhancement of transmission capabilities of the European electricity backbone

contact C.N.T.E.E. TRANSELECTRICA S.A. Fiscal Code: 13328043 Registry of Commerce: J40/8060/2000 Address: ROMANIA, BUCURESTI, 2- 4 Olteni Street, District 3 Web site: www.transelectrica.ro e-mail: stefan.bucataru@transelectrica.ro Phone: +40 21-3035611 Fax: +40 21-3035610 President of the Executive Board (CEO): Stefan-Doru BUCATARU