Introduction to EPRI Plant Information Model (PIM) Russell Adams EPRI Bob Renuart UniStar.

Slides:



Advertisements
Similar presentations
SCO 3 Crewing Optimization As-Is Processes January 9, 2006
Advertisements

DRM P-CM Roadmap V5_MCS Change Control: Rolling updates for Taxonomy, Adjusting Training, Technology, DRM Process, Facilities 5. Design Change Controls.
V. C. Summer Nuclear Stations Transition to a Data Centric Paradigm CMBG Atlanta June 2013.
ISO 9001 : 2000.
Data Model driven applications using CASE Data Models as the nucleus of software development in a Computer Aided Software Engineering environment.
1. 2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
Introduction to SAP R/3.
Asset management guidelines
Design, Implementation and Maintenance
International User Group Information Delivery Manuals: General Overview Courtesy:This presentation is based on material provided by AEC3 and AEC Infosystems.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
MDR Implementation: Drivers & Challenges Julie Smiley Director, Product Management for BioPharma Akana PhUSE SDE - May 14, 2015 Introductions.
Engineering Systems of.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Developing Enterprise Architecture
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Complete and Integrated Lifecycle Management. Challenges 1.
Enterprise Asset Management
An Introduction to AlarmInsight
Leveraging JDA technology to support a Shelf Connected Supply Chain Amy Higgins VP, Space Management & Analytics Sears Holdings Corporation 1.
Chapter 6 Software Implementation Process Group
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
EPRI New Build CM Initiatives Bob Renuart Russell Adams EPRI Technical Consultants.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
Asset Record Does Not Equal CI: The confusion between Asset and Configuration Management Christine M. Russo Manager, IT Asset Management and Property.
New Nuclear Power Plant Configuration Information Management Transition to a Data Centric Paradigm SCE&G VCS CMIS Strategy Steven F. Fipps.
Roles and Responsibilities
PIM Model Workshop Russell Adams EPRI Bob Renuart UniStar.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Emerging Technologies Work Group Master Data Management (MDM) in the Public Sector Don Hoag Manager.
1 Information Handover at UniStar Lessons Learned Presented By: Bob Renuart UniStar.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Westinghouse/Southern/SCANA – New Build Configuration Management
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona May “ System Interfaces for Distribution Management “ TC57 WG14 Standards IEC
Requirements Management and CM Vendor Perspective E. Helm, AREVA NP Copyright © June 2012 AREVA NP Inc. All rights reserved.
Chapter 4 Automated Tools for Systems Development Modern Systems Analysis and Design Third Edition 4.1.
Robert Aydelotte ExxonMobil - Upstream Technical Computing 13 May 2004 Standardizing Fluid Property Reporting.
2006 CMBG Conference BREAKOUT 6: Master Equipment List & Data Base Management Facilitator: Tom Czerniewski Entergy June 11-14, 2006 Richmond, VA.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
2006 CMBG Conference Mike Stout Spescom Software, Inc. Configuration Management For The Next Generation.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Certifying Data in Controlled Databases for Direct Use ERIC PACE CM GROUP SUPERVISOR 1.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
 System Requirement Specification and System Planning.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
CCPS PERD Process Equipment Reliability Database (PERD)
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
System Design, Implementation and Review
Knowledge-centric Plant Information Model
TechStambha PMP Certification Training
Software Configuration Management
Traceability of Gas Pipeline Materials Research & Materials Manager
Your Facility Your Information
SNC/SCANA – New Build Configuration Management
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Jim Powers - Director, Fleet Engineering
PSS verification and validation
I&C requirements and configuration management
Presentation transcript:

Introduction to EPRI Plant Information Model (PIM) Russell Adams EPRI Bob Renuart UniStar

AGENDA What is the EPRI PIM Model Business Need Use Cases Value Proposition Workshop Objectives

EPRI Initiative that is Leading the Industry to Data Centric Processes 3 Report

EPRI Initiative that is Leading the Industry to a Standard for Handover 4 Report

What is the EPRI PIM Model

EPRI PIM Model History 1987: EPRI Technical Report - Guidelines for Specifying Integrated Computer-Aided Engineering Applications for Electric Power Plants Background: Many CAE Systems/Application Already Developed  Stand-alone and Unable to Share Plant Data  Resulting in Costly Redundancies in Capturing, Handling, and Maintaining data Objective: Develop Data Model Integrating All Plant Data for Use in Developing CAE Applications Results: Findings Demonstrated Need for a Plant Data Model 2010: Developed Plant Information Network (PIN) Study Model 2011: Updated PIN Study Model to Modern Plant Information Model (PIM) Developed a Standard Handover Framework for Data and Documents Developed a Standard Configuration Management Taxonomy and Reference Model Framework 6

EPRI PIM Model Today and Thinking Forward An Evolving Open Source Standard for Handover of Power Plant Data Incorporating  Standard Handover Framework  CM Taxonomy and Relationship Framework Leverage to support Implementation of a World Class CMIS throughout the NNPP Lifecycle Eighty (80) Percent usable by US NNPP Projects and adoptable by Non-US NNPP Projects

Business Need for EPRI PIM Model

Operating Fleet Business Problem Multiple Organizations exchange information and documents during EPC Transactions are primarily paper based with little relationships established The creation and management of information and documents has led to many disconnected data systems, applications, and environments The same piece of information can and does exist within many applications under different technical names with different meanings Minimal attention to delivery of information in a data format for commissioning, operations, and maintenance 9

PIM Model Objective: Leverage Automation to Maintain Configuration at a Data/Document Level 10 Requirements FDDFDD DRWGSDRWGS SDDSDD SPECSSPECS An integrated management program that enables accuracy and consistency Physical Configuration Facility Documentation Controlled Processes Maintain Relationships

Old Way of Managing Configuration Information Document List is Managed in a Document Management System that captures: Who What When Master Equipment List in a Separate Data Base: Each Equipment Tag Number is related to:  Safety Classification  Equipment Properties (flow, pressure, temp, etc.)  Some Drawings  Vendor Information  Membership to an Engineering Program 11

Old Way of Managing Configuration Information (cont) Separate System for Managing Requirements Design Basis Documents Owner Requirements Disconnected Database Multiple Databases for other Uses “copy” data from the MEL or worse Recreates it – Equipment Reliability MOV Program Inservice Test Program 12

Challenges for Configuration Control of Data The same Data often managed in separate, disconnected systems that complicates change control. Much Data is tied to the tag number that would benefit from a different relationship structure, e.g., Vendor data Limited use of a defined Hierarchy of SSCs and Documents that facilitates “Inherency” of data: A room ID should inherit the elevation, wall/slab IDs, Building Number and Island Designation it is associated and all of their attributes without having to key it in. An Equipment ID should inherit the system, system grouping, and component subtype, component type, component grouping it is associated and all of their attributes without having to key it in. 13 Limitations of the Old Way

Limitations of the Old Way (con’t) Limited use of Relationships – It is not only Important to Make Relationships, but just as Important to define the type of Relationship Document to Document Relationships. Examples:  Doc A “is a Design Input to” Doc B  Doc C “is a Requirement fulfilled by” Doc D  Doc D “is a Reference for” Doc A Document to Tag and Tag to Tag Relationships  Room ID – Elevation – Walls - Building – Island  Master Tag that Groups related tags, e.g.: oSkid Equipment oSafe Shutdown oIsolation Groups (what is tagged out simultaneously for PM Plan) oPower Dependency  Engineering Program (ISI, IST, ER, EQ, AOV, MOV) 14

Data/Document/Relationship Development Lifecycle Requirements (Source Number) Contract Design Basis Functions and Values and other Commitments in DCD/COLA Codes & Standards ITAAC 15

Data/Document/Relationship Development Lifecycle Engineered Item (TAG Number) SSC & Attributes Location & Attributes Engineering Program Specifications Eng Drawings Requirements (Source Number) Contract Design Basis Functions and Values and other Commitments in DCD/COLA Codes & Standards ITAAC 16

Data/Document/Relationship Development Lifecycle Engineered Item (TAG Number) Procured Item (Mgf/Model) Vendor Manual Vendor Drawings BOM Specifications SSC & Attributes Location & Attributes Engineering Program Specifications Eng Drawings Requirements (Source Number) Contract Design Basis Functions and Values and other Commitments in DCD/COLA Codes & Standards ITAAC 17

Data/Document/Relationship Development Lifecycle Engineered Item (TAG Number) Procured Item (Mgf/Model) Installed Item (Mgf/Model/Serial) Vendor Manual Vendor Drawings BOM Specifications Inspection Report Work Orders PM Record Test Results ITAAC Pkg SSC & Attributes Location & Attributes Engineering Program Specifications Eng Drawings Requirements (Source Number) Contract Design Basis Functions and Values and other Commitments in DCD/COLA Codes & Standards ITAAC 18

Data/Document/Relationship Development Lifecycle Engineered Item (TAG Number) Procured Item (Mgf/Model) Installed Item (Mgf/Model/Serial) Vendor Manual Vendor Drawings BOM Specifications Inspection Report Work Orders PM Record Test Results ITAAC Pkg Associate Serial Number Object with Tag No. SSC & Attributes Location & Attributes Engineering Program Specifications Eng Drawings Requirements (Source Number) Contract Design Basis Functions and Values and other Commitments in DCD/COLA Codes & Standards ITAAC 19

Goal is to Extract the Data That Generated Documents to be Consumed by all End Users FSAR Design Basis Calculation Output Vendor Specification IST Test Result -Design Change Information Design basis Design Margin Performance Knowledge Operability Equip Reliability Fulfillment of Require- ments Decision 20 Assumptions Inputs Methodology Calcs RAW RISC Reliability class PRA Attributes Wind load Temperature Flooding Environmental CMIS Efficient Decision Making Standardized Attributes Flows Temperature Pressure Specs Regulatory Design Operational Margin AOV MOV FCV Manual Component Type Single Source of “Truth” 20

CMIS will be the “Information Hub” of the Operating Plant Lifecycle Management System 21

Use Cases for EPRI PIM Model CMIS Use Cases What are the Benefits of a CM Structured to the EPRI Guideline?

Use Cases for a Data Repository with the PIM Architecture At this point, the Use Cases have been Qualitative – The use cases presented mostly relate to areas we have all had to deal with in a document centric world. The EPRI ANT Integration Committee has requested Quantitative Use Cases with Lifecycle Costs and Benefits – This is planned for 2013 EPRI will benchmark multiple global, high-risk, high- consequence industries that have been through the transition of a document centric to a data centric Plant Lifecycle Management System to determine the real value and payback realized, as well as lessons learned. 23

Use Cases for EPRI PIM during EPC Develop and Control Margins 24

EPRI PIM Model Ancestor View 25

SSC Fails to perform Intended Safety Function (Design Basis Value in DCD/COLA) Use Case of EPRI PIM to Develop a Margin Management Model Design Margin Full Qualification Analytical Margin ITAAC Result Ongoing IST Trend Actual Capability 26

Use Cases for EPRI PIM during EPC Develop and Control Margins Manage Requirements and Conduct more thorough Design Impact Reviews when the: Licensing Basis Changes (RAIs), Detailed Design Changes (Owner Request, RAIs), Construction Changes (Field Change) 27

Manage Requirements and Conduct more thorough Design Impact Reviews 28 CMIS will have a built in CM “Taxonomy” with Relationships that connect: 1.Requirements (from the DCD, COLA, other Licensing Info)

Manage Requirements and Conduct more thorough Design Impact Reviews 29 CMIS will have a built in CM “Taxonomy” with Relationships that connect: 1.Requirements (from the DCD, COLA, other Licensing Info) to the 2.Design and Operating information that fulfills the requirement

Manage Requirements and Conduct more thorough Design Impact Reviews 30 CMIS will have a built in CM “Taxonomy” with Relationships that connect: 1.Requirements (from the DCD, COLA, other Licensing Info) to the 2.Design and Operating information that fulfills the requirement to the 3.Installed information that validated the installed asset meets the Requirements through tests and inspections (ITAAC)

Use Cases for EPRI PIM during EPC Develop and Control Margins Manage Requirements and Conduct more thorough Design Impact Reviews. Manage Design Inputs that change often during EPC Manage Unverified Assumptions –Chaining Impact of a Design Document with a UVA on Issue for Construction Manage the impact on a Response to a Request for Information if the Response Basis Document Changes Single Source of Configuration Controlled Data for Engineering Programs, ITAAC, Construction, etc. Satisfied Owner/Operator during Handover and Turnover to Utility 31

Use Cases for EPRI PIM after Operational Modern Plant Lifecycle Management (PLM) Systems are Data Driven Access to Licensing Basis and Requirements to Support Operability Determinations and Functionality Assessments Tool to conduct Design Impact Reviews to support Plant Modifications and Evaluations Configuration Controlled Source of Data for Maintenance, Calibrations, Post Maintenance Testing Criteria, Inservice Testing, Inservice Inspection, Equipment Reliability, Maintenance Rule

Conceptual Configuration Information Management System Model 33

Conceptual Configuration Information Management System Model 34

Conceptual Configuration Information Management System Model 35

Conceptual Configuration Information Management System Model 36

37

38

CMIS will be the “Information Hub” of the Operating Plant Lifecycle Management System 39

Value Proposition for EPRI PIM Model

EPRI PIM Value Proposition Lack of a Standard for Handover is Leading to Difficulty in Expressing and Ambiguity in Interpreting Handover Content and Functional Requirements Resulting in Increased Cost and Time with the Net Effect of Lots of One-off Solutions and Re-Inventing the Wheel Business Problem SolutionBenefits Anticipated Long- Term Benefits 41

EPRI PIM Value Proposition Lack of a Standard for Handover is Leading to Difficulty in Expressing and Ambiguity in Interpreting Handover Content and Functional Requirements Resulting in Increased Cost and Time with the Net Effect of Lots of One-off Solutions and Re-Inventing the Wheel Business Problem EPRI PIM’s Standard Handover Framework and Configuration Management Taxonomy Reference Model can be leveraged by the Industry to Support Implementation of a World Class CM Program Throughout the Plant Lifecycle Solution Benefits Anticipated Long- Term Benefits 42

EPRI PIM Value Proposition Lack of a Standard for Handover is Leading to Difficulty in Expressing and Ambiguity in Interpreting Handover Content and Functional Requirements Resulting in Increased Cost and Time with the Net Effect of Lots of One-off Solutions and Re-Inventing the Wheel Business Problem EPRI PIM’s Standard Handover Framework and Configuration Management Taxonomy Reference Model can be leveraged by the Industry to Support Implementation of a World Class CM Program Throughout the Plant Lifecycle Solution Adopting EPRI PIM will Lead to More Standardized Hanover Specifications, Solutions and Software Applications/Systems Resulting in Cost and Time Savings by Reducing the Difficulty in Expressing and the Ambiguity in Interpreting Handover Content Benefits Anticipated Long- Term Benefits 43

EPRI PIM Value Proposition Lack of a Standard for Handover is Leading to Difficulty in Expressing and Ambiguity in Interpreting Handover Content and Functional Requirements Resulting in Increased Cost and Time with the Net Effect of Lots of One-off Solutions and Re-Inventing the Wheel Business Problem EPRI PIM’s Standard Handover Framework and Configuration Management Taxonomy Reference Model can be leveraged by the Industry to Support Implementation of a World Class CM Program Throughout the Plant Lifecycle Solution Adopting EPRI PIM will Lead to More Standardized Hanover Specifications, Solutions and Software Applications/Systems Resulting in Cost and Time Savings by Reducing the Difficulty in Expressing and the Ambiguity in Interpreting Handover Content Benefits Handover of Quality Information will occurs Timely and Seamlessly as Content that is Interrelated with Logical, Traceable, Reproducible and Manageable Relationship Connections between Requirements and SSCs Anticipated Long- Term Benefits 44

EPRI PIM Model Workshop Objectives Discuss how the EPRI PIM can be implemented in a value added way even if the Utility or EPC has an “Imperfect Start,” i.e., little data structure. Live Demonstration of PIM - The Power of Data Discuss Kickoff of Industry EPRI PIM Working Group Teams Discuss Industry Adoption Discuss Software Solution Vendor Adoption 45

EPRI PIM Model – Join Us Thank you 46