Taikan Suehara, 13 May 2014 page 1 Status of SiW-ECAL development for ILD Taikan Suehara (Kyushu University) on behalf of ILD SiW-ECAL development.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Taikan Suehara, ILC-Tokusui annual meeting, 16 Dec page 1 Overview of SiECAL and related DAQ development Taikan Suehara (Kyushu University, Japan)
Taikan Suehara, AIDA-2020 kickoff meeting, 3 Jun page 1 Requirements from CALICE-DAQ for WP5 Taikan Suehara (Kyushu University, Japan)
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
ECAL silicon- tungsten status
FEV Boards status N. Seguin-Moreau on behalf of
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Taikan Suehara, Belgrade, 9 Oct page 1 Development of combined DAQ for silicon and scintillator ECAL and related software issues Taikan Suehara.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Taikan Suehara, Belgrade, 9 Oct page 1 SiECAL DAQ Taikan Suehara (Kyushu University, Japan)
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University,
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Taikan Suehara, LLR-Kyushu meeting, 20 June 2014 page 1 Discussion on DAQ: my prospects Taikan Suehara (Kyushu University)
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Taikan Suehara, CALICE meeting at KEK, 20 Apr page 1 Report from CALICE DAQ Task Force Taikan Suehara (Kyushu University, Japan)
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
14.4. Readout systems for innovative calorimeters
Calicoes Calice OnlinE System Frédéric Magniette
Current activities in Kyushu for Silicon-ECAL
ECAL EUDET MODULE Summary talk
Status of Ecal(s) for ILD
Plan of production of SiW-ECAL slabs in Japan
CALICE Collaboration Meeting KEK/Japan – April 2015
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Ecal Front End Electronics
Stéphane Callier, Dominique Cuisy, Julien Fleury
Status of the EUDET Prototype
Presentation transcript:

Taikan Suehara, 13 May 2014 page 1 Status of SiW-ECAL development for ILD Taikan Suehara (Kyushu University) on behalf of ILD SiW-ECAL development group

Taikan Suehara, 13 May 2014 page 2 ILD Silicon-ECAL development

Taikan Suehara, 13 May 2014 page 3 ILD Silicon-ECAL development France LLR, LAL, LPNHE, LPSC Japan Kyushu, Tokyo

Taikan Suehara, 13 May 2014 page 4 Silicon-ECAL: design

Taikan Suehara, 13 May 2014 page 5 Physics & Technological prototype 16.5%(stochastic) 1-2% (constant) obtained with 1-45 GeV e - /e + at 2006/2008 BT Physics prototype: PFA proof with comparison to MC (Pandora etc.) electronics outside 1cm x 1cm pixels full 30 layers Technological prototype Full integrated electronics between Si/W layers SKIROC2 analog/digital ASICs Mainly for realization of electronics and mechanics to realistic detector

Taikan Suehara, 13 May 2014 page 6 Progress in Si-ECAL development Mechanics PCB production (BGA/CIB) Gluing Assembly Cooling DAQ ASICsDIFs LDA/GDCCsCCC PCs Guard rings Doping Sensor design ASIC performance GDCC with UDP Software Adaptation to larger DAQ Overall size Layers Hybrid Optimization

Taikan Suehara, 13 May 2014 page 7 Progress in Si-ECAL development Guard rings Doping Sensor design

Taikan Suehara, 13 May 2014 page 8 Basic sensor study Two batches of Hamamatsu sensors C-V curve: saturation V differs

Taikan Suehara, 13 May 2014 page 9 Laser study with guard rings 3x3 babychip 4x4 ongoing laser Nd:YAG laser (1064nm) focused to  20  m ~ 1.5 ns pulse width ~13 kW peak power 10,000 pulses measured 120V bias voltage on silicon DAQ by PHADC on CAMAC upper-left ch by power calibration

Taikan Suehara, 13 May 2014 page 10 1 guard ring laser GR effect seen: esp on edge pixels

Taikan Suehara, 13 May 2014 page 11 4 guard rings (separated) laser GR effect much smaller

Taikan Suehara, 13 May 2014 page 12 Mesh pixels microscope Baby chips with meshed electrodes have been arrived. Being prepared for laser injection INSIDE pixels.

Taikan Suehara, 13 May 2014 page 13 Progress in Si-ECAL development Mechanics PCB production (BGA/CIB) Gluing Assembly Cooling

Taikan Suehara, 13 May 2014 page 14 FEV 8  9  10 (BGA package) FEV8 QFP SKIROC2 4 chips/board (256ch) used in 2012/13 BT 10 slabs exist FEV9 (LLR)16 BGA SKIROC2 Good flatness (< 0.5 mm) Some bugs fixed Cabling done(?) Electronics test will be done soon 4 FEV9 will be interconnected for long slabs FEV10 will be used for 2015 BT

Reminder FEV_COB 15 - Interface board with Chip On Board - Assures compact calorimeter - Not trivial specs Ultrathin : 9 layers with thickness of about 1.2mm Deviation of total planarity of about 0.5 mm (3mm is industrial standard) However it's now there in a first version - Design and routing OMEGA/LAL - Fabrication end of Metrology at LAL - Chips mounted beginning of 2013 by CERN bonding lab - First tests in summer 2013 at LAL

Cooperation with EOS 16 - Korean company EOS has declared to be ready to produce the PCB -> Relaxed constraints on the thickness 1.2mm -> 1.5mm - Technical discussion ongoing via mail but production is imminent - Plans to assure entire PCB assembly in Korea - PCB production - ASIC bonding - Encapsulation

Current gluing status 9 sensors has been glued with the robot: used at beam tests The constraints on the PCB geometry have been identified: – Flatness – Parallelism of the edges – Uniform height of the ASIC soldered on the board The leakage currents measured before and after the gluing process are similar. 17 Improvements – Use of specific pumps for dry and clean vacuum – Careful cleaning of PCB – New positioning of the glue dots for the external pads, to avoid short-circuits.

Next steps We need to develop the software for automated positioning and alignment (almost completed) We plan to combine both gluing and positioning robots (already assembled) The robots will be moved and installed in the clean room (not yet) The goal is to glue 4 sensors on the same PCB (already done with 4 glass tiles on FEV9) 18

Both robots assembled 19

Taikan Suehara, 13 May 2014 page 20 Assembly mechanics Interconnection of 4 FEVs Building on going of transport and handling tools for integration & tests ~2,56 T Optimization of fastening to Carbon HR Rails EUDET Carbon HR plate 13 mm with metallic inserts Mechanical structure of frames

CALICE Collaboration Meeting March 2014 Power dissipation : Final goal with power pulsing 1/100 s Barrel : (1.5m)  T = 2,2°C For ½ SLAB from barrel Wafers consumption : W Front SLAB electronic : 0.3 W Ecal detector : 4.5 kW W / surface 1.5 m x 0.18 m 0.3 W Front SLAB electronic Heat exchanger location End Cap : (2.5m)  T = 6°C Passive cooling : OK Cooling capacitites … support up to 10x bigger heat load (for details see backup)

Taikan Suehara, 13 May 2014 page 22 Progress in Si-ECAL development DAQ ASICsDIFs LDA/GDCCsCCC PCs ASIC performance GDCC with UDP Software Adaptation to larger DAQ

Taikan Suehara, 13 May 2014 page 23 ASIC tests w/ testboards SKIROC2 64ch readout/chip preamp + 2 shapers Autotrigger 15 cell analog memory 14 bit ADC SKIROC2 test board developed by OMEGA No detector, input holes Analog/digital tests Automated test software with Labview Some crosstalk found

Taikan Suehara, 13 May 2014 page 24 Tests for BGA SKIROCs FEV9 test board in LLROMEGA test board for BGA Both analog/digital tests Being prepared in Kyushu Based on QFP test board Redesigned w/ BGA BGA socket equipped - or BGA soldered for comparison Possibility to connect to DIF as well as old FPGA Close contact with S. Callier of OMEGA Expected in June or July Equip one socket at one channel of FEV9 Digital test only

Taikan Suehara, 13 May 2014 page 25 Crosstalk with FEV8/injection

Taikan Suehara, 13 May 2014 page 26 Issues in SKIROC2/FEV8 Post triggering of BX+1, BX+2 at many channels –improved by decoupling capacitor but still exists Noisy channel – ~10%? (PCB routing?) External trigger not working TDC (maybe too noisy) Initial configuration sometimes fails –maybe problem on DAQ rather Some of them will be improved in FEV9/10

Taikan Suehara, 13 May 2014 page 27 7 x DIFs HDMI CCC HDMI RJ45 & fiber connector VME connector USB connector Main part Mezzanine part (HDMI interface) VME6U, based on mainly commercial components Used from 2013 summer: many improvements done Data loss << 1% in previous BT, robustness shown Testing UDP bloc The GDCC card Will be used with 160 chips in the next beam test

Taikan Suehara, 13 May 2014 page 28 Calicoes: the SiECAL DAQ software Acquisition chain Control commands XML transfer by sockets (python implementation) Low level part written in C (pyrame framework)

Taikan Suehara, 13 May 2014 page 29 ASIC configuration tool Ruby + GTK

Taikan Suehara, 13 May 2014 page 30 We should integrate on larger DAQ systems for combined testbeam etc. We plan to use EUDAQ (as a first trial) Also investigating Si/Sc combined DAQ for hybrid ECAL –Or anyone else using ROC chips –Or more (trackers?) into real ILD? Hopefully come first in this summer Efforts for larger DAQ

Taikan Suehara, 13 May 2014 page 31 We received: –One Slab (FEV8 used in beamtests) –One DIF –One LDA, one CCC Technology has been basically transferred in my visit to LLR in last winter –including CALICOES We start to reproduce the same setup as LLR, then start to contribute to DAQ/test DAQ imported to Kyushu

Taikan Suehara, 13 May 2014 page 32 Progress in Si-ECAL development Overall size Layers Hybrid Optimization

Taikan Suehara, 13 May 2014 page 33 Optimization with PFA Optimization is not straightforward How do we constrain costs? How about multiple thicknesses? How is the physics affects? Study still ongoing

Taikan Suehara, 13 May 2014 page 34 PCB thickness Seems smaller effect in PCB thickness < 3 mm Current Si/QFP has 3.1 mm thickness – can be reduced by thinner BGA Possibly COB with ~ 1.5 mm DBD: 1.2 mm maybe too optimistic

Taikan Suehara, 13 May 2014 page 35 Optimization of “Hybrid” We will move to more strategic way...

Taikan Suehara, 13 May 2014 page 36 We will finalize the optimization –Of sensors –Of geometries (with physics motivation) We will prepare for the next BT in 2015 –With FEV10/GDCC/software –With bigger scale of production We will prepare for the mass production –Automated test/assembly etc. –More consideration on mechanics We will widen the collaboration/cooperationSummary