Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Midwest Energy, Inc. Transmission Planning and Expansion
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
OPERATING IN THE EAGLE FORD SHALE
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Power System 2002 Conference: Impact of Distributed Generation CLEMSON UNIVERSITY ELECTRIC POWER RESEARCH ASSOCIATION 1 Distribution Capacitor Placement.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Area Dynamic Reactive Project March 11,
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Yellowhead Area Transmission System Development
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Sep 16, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Houston Import Study Update
Freeport Area Master Plan Project
Freeport Area Master Plan Project -
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Warren Lasher Manager, Long-Term Planning and Policy
Presentation transcript:

Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT

2 Jan. 13, 2012RPG Meeting Project Background Jackson Electric Cooperative (JEC) Load addition Areas surrounded by Jackson, Victoria and Wharton Counties are part of Eagle Ford shale formation and are newly discovered oil exploration areas Oil reserves are estimated to be 3 billion barrels and is said to be the sixth largest oil field discovered in the USA Oil and gas exploration leads towards significant amount of load addition Approx. 118 MW of new electric load will be added in Jackson County, TX by the end of 2013 Existing 69kV (STEC) system is composed of 4/0 ACSR conductor (45MVA) and cannot support the new load addition

3 RPG Meeting Jan 13, 2012 Map of the Area of concern

4 Jan. 13, 2012RPG Meeting Base Case Model & Assumptions Study Cases The latest 2014 & 2016 Reliability Cases from the YTP Load Changes Load was updated/increased in the area of concern based on STEC’s submittal 2016 Case:- STEC load: 1503 MW 2014 Case:- STEC load: 1395 MW Generation Changes Monticello 1 & 2 (in-service) Sam Bertron 1 & 2 (in-service) Greensbayou 5 (in-service) Panda Temple 1 (not available in 2014) All other mothballed units (turned off)

5 RPG Meeting Jan 13, 2012 Overloads on existing system due to updated loading in 2014

6 Jan 13, 2012RPG Meeting Project Options Option 1 (345 kV) Build a new 345 kV station near Cordelle and loop the STP – Elm Creek 345 kV line into it Add a 345/138 kV auto-transformer Build a new 138 kV line (approx. 1.5 miles) to the new load serving 138/24.9 kV distribution system Add 9.6 Mvar capacitor banks at Cordele and Ganado Switch Total Cost :- $24.5 million Facts The load will be radially connected to the 345 kV station The 18.7 MW of load at Cordelle 69 kV still requires Vanderbilt – Eltoro and Ricebird – Round Mott 69 kV line to be upgraded No New load can be served through the existing weak 69 kV transmission system without these upgrades

7 RPG Meeting Jan 13, 2012 Option 1 (345 kV) topology with entire load moved to the new distribution station

8 RPG Meeting Jan 13, 2012 Loading after moving the Cordelle load (18.7 MW) served radial from 345 kV (2016 case)

9 Jan 13, 2012RPG Meeting Project Options (Cont.) Option 2 (69/138 kV rebuild) Rebuild the existing 69 kV line (22 miles) from El Campo and Cordelle as a double circuit 69 KV & 138 kV with 122 MVA and 240 MVA (emergency rating); respectively Rebuild the existing 69 kV line (13 miles) from Cordelle and El Toro switch as a double circuit 69 KV & 138 kV with 122 MVA and 240 MVA (emergency rating); respectively Rebuild the existing 69 kV line (13.6 miles) from El Toro and Vanderbilt switch as a double circuit 69 KV & 138 kV with 122 MVA and 240 MVA (emergency rating); respectively Install 9.6 Mvars of capacitor banks at Louisville 69 kV, Ganado 69 kV, Cordele 69 kV and ETP sub 138kV Construct a new 138 kV double circuit line (on a new R.O.W) from the ETP substation to a single new 84 MW load Total Cost :- $ million

10 Jan 13, 2012RPG Meeting Option 2 Upgrades

11 RPG Meeting Jan 13, 2012 Option 2 (n-1) results for 2014

12 RPG Meeting Jan 13, 2012 Option 2 (n-1) results for 2016

13 Jan 13, 2012RPG Meeting G-1 analysis for Option 2 Option 2 (rebuilding of existing 69 kV and adding 138kV lines) was analyzed under G-1 conditions The biggest combined cycle train at Colorado Bend (252 MW) was turned off. Nursery – Rayburn 69 kV line was shown overloaded in both 2014 and 2016

14 Jan 13, 2012RPG Meeting Facts about Option 2 upgrades Load will not be radially connected with Option 2 More load can be connected to the 69 kV system with Option 2 in future Nursery – Rayburn 69 kV line has to be upgraded with Option 2 upgrades

15 Jan 13, 2012RPG Meeting Summary Rebuilding the existing 69 kV transmission system (Option 2 upgrades) seems to be a better option as additional load may be connected to the existing 69 kV substations in future. However, after performing the G-1 analysis, it is mandatory to include Nursery – Rayburn 69 kV upgrade as a part of Option 2 Upgrades to serve future loads additions. Thus the final Option 2 Upgrades are listed on the following slide

16 Jan 13, 2012RPG Meeting Summary (Cont.) Updated Option 2 Upgrades (69/138 kV rebuild) Rebuild the existing 69 kV line (22 miles) from El Campo and Cordelle as a double circuit 69 KV & 138 kV with 122 MVA and 240 MVA (emergency rating); respectively Rebuild the existing 69 kV line (13 miles) from Cordelle and El Toro switch as a double circuit 69 KV & 138 kV with 122 MVA and 240 MVA (emergency rating); respectively Rebuild the existing 69 kV line (13.6 miles) from El Toro and Vanderbilt switch as a double circuit 69 KV & 138 kV with 122 MVA and 240 MVA (emergency rating); respectively Install 9.6 Mvars of capacitor banks at Louisville 69 kV, Ganado 69 kV, Cordele 69 kV and ETP sub 138kV Construct a new 138 kV double circuit line (on a new R.O.W) from the ETP substation to a single new 84 MW load Upgrade Nursery – Rayburn 69 kV line such the the Circuit Rate B is 122 MVA Total Updated Cost :- $ million

17 September 17, 2010RPG Meeting March 12, 2010 Questions?