1 R-APDRP Part -A Karnataka June 2015.

Slides:



Advertisements
Similar presentations
Total Revenue Management and Billing solution for Power Utilities.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
A presentation on e-Procurement
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
0 Restructured-APDRP An initiative of Ministry of Power Government of India Nodal Agency Power Finance Corporation Ltd. Restructured Accelerated Power.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Supervisory Systems.
1 Freight Operations Information System COM/CCM’s Conference
August 17, 2007 Integrated Financial Management System Finance Department, Government of Gujarat.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
APDRP during 10 th Plan Programme launched in for implementation during X Plan with following objectives: Reduction of AT&C losses Reduce outages.
Commissioner, Indore Municipal Corporation
Power Line Carrier Communication based Automated Meter Reading System
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
India Smart Grid Summit - Towards Sustainable Energy Solution- Presented by: Pawan Kumar Agrawal Executive Director & Regional Business Leader, Infrastructure.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Aug 2015 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
T r a n s p a r e n t f a s t r e l i a b l e
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
0 We Create Possibility of a Better Tomorrow… An initiative of Ministry of Power Government of India Nodal Agency Power Finance Corporation Ltd. Restructured.
We create possibilities of a better tomorrow Power Finance Corporation Ltd. 23 rd December 2011 Noida, UP Restructured APDRP By - V K Shah Executive Director,
0 Restructured-APDRP An initiative of Ministry of Power Government of India Nodal Agency Power Finance Corporation Ltd. Restructured Accelerated Power.
PFMRP Phase IV Brief Overview  PEFA, other diagnostic reports along with the CAG and PAC reports provided the frame of reference for development of PHASE.
Low Voltage Smart Grid System Enables Near Real Time Energy Balancing as a Tool for Detecting and Managing Energy Losses Jan Olwagen Senior Engineer Utillabs.
Listen to Your Meters! Pradeep Murthy SunTec Business Solutions.
PROGRESS UPDATE CRCCF SYSTEM DEVELOPMENT Container Royalty Central Collection Fund Project 1 July 2014.
PowerOneData’s GENII Leverages Cloud Platform to Deliver Affordable, Scalable, and Accessible Meter Data Management Software to Customers COMPANY PROFILE:
Slide 1 GAC HOB Training Course - Essentials of Budget execution Addis Ababa, June
Restructured-APDRP An initiative of Ministry of Power Government of India Nodal Agency Power Finance Corporation Ltd. Restructured Accelerated Power Development.
Life cycle services for automation products
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 11 th Aug 2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA MARCH-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014(As on ) RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Business Process Mapping “Power Sector - Distribution”
Data Center Management Microsoft System Center. Objective: Drive Cost of Data Center Management 78% Maintenance 22% New Issue:Issue: 78% of IT budgets.
1 POWER FOR ALL. 2 POWER TO ALL WBSEDCL - Overview Consumers151 Lakhs Peak Demand 5, 586 MW Energy Handled 38, 110 MU Total Revenue Rs.19,583Cr Number.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Connecting the dots … between Finance and Operations in Telecoms Don van Splunteren VP Sales, NAAP Global Solutions.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 09-June-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
EXPERIENCE SHARING OF AGDSM PROJECT AT CESC MYSORE Shri M. Muniraju Chief Engineer Chamundeshwari Electricity Supply Corporation Limited (CESC), Mysore.
Restructured-APDRP An initiative of Ministry of Power Government of India Nodal Agency Power Finance Corporation Ltd. Restructured Accelerated Power Development.
Sicherheitsaspekte beim Betrieb von IT-Systemen Christian Leichtfried, BDE Smart Energy IBM Austria December 2011.
Cognos BI. What is Cognos? Cognos (Cognos Incorporated) was an Ottawa, Ontario-based company that makes Business Intelligence (BI) and Performance Management.
Ron Johnson, CFA Litman/Gregory Asset Management.
John Wainwright | Columbus Global GENERAL FINANCE & ORGANIZATION HIERARCHY.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
Treasury of the Republic of Kazakhstan
Issues and Intervention required - Karnataka
Beyond the Business Case: AMR Operational Experiences and Benefits
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
Pradeep Murthy SunTec Business Solutions
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 27-Oct-2014
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 28-July-2014
RAPDRP PART A IN KARNATAKA 25th Aug 2014
Presentation transcript:

1 R-APDRP Part -A Karnataka June 2015

1. R-APDRP & Its Objectives Ministry of Power, Govt. of India launched the R-APDRP in the XI Five year Plan Most ambitious initiative in power distribution sector taken by Ministry of Power; Rs 50000 Crore funded programme is Govt’s renewed attempt to revive power sector reforms Power Finance Corporation (PFC) designated as the Nodal Agency Key Objectives of R-APDRP To reduce AT&C losses to 15% in project area across India in all states Actual, demonstrable performance in terms of loss reduction; Loss reduction targets at utility level Success factor: Establishment of reliable & automated systems for sustained collection of accurate base line data Adoption of IT in the areas of energy accounting Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

2. R-APDRP - Phases & Value Proposition to DISCOMs R-APDRP scheme has 2 phases – Part A & Part B Part-A - For establishment of baseline data & IT applications for energy accounting/auditing & better consumer services Part-B - System improvement, strengthening and augmentation etc. Key Objectives of R-APDRP R- APDRP is distribution reforms program using Information Technology (IT) To baseline accurate data for energy flow in the power distribution system To take necessary measures for reducing technical & commercial losses To bring transparency & accountability in the system by use of IT Improved customer services in nearly monopolistic electricity distribution biz To prepare power sector for adoption of future technologies by bringing all the public power utilities on a level playing field Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

3. R-APDRP Key Benefits to Utilities Strengthening of sub-transmission & distribution networks in the urban areas for enhancement of reliability and efficiency. Metering of feeders /distribution transformers / consumers in the urban areas for proper energy accounting and auditing bringing transparency and AT&C reduction. Continuation of IT enablement of distribution sector & strengthening of distribution network for infusing transparency , reliability and efficiency in the distribution network help to achieve 24x7 Power supply. Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

4. R-APDRP Implementation in Karnataka – An Overview 5 electricity distribution companies in State Bangalore Electricity Supply Company (BESCOM) Chamundeshwari Electricity Supply Corporation (CESC) Gulbarga Electricity Supply Company (GESCOM) Hubli Electricity Supply Company (HESCOM) Mangalore Electricity Supply Company (MESCOM) Area 5012 sq. Km Consumers 7.2 Million Distribution Transformers 55,621 Nos. Cable 672,145 Ckt Km Total Assets ~60 Million Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

5. R-APDRP Part – A Overview in Karnataka 17 mandatory modules to be implemented Single solution for all ESCOMs Each ESCOM project to be treated individually by ITIA – Infosys; Overall guidance & support from the office of the Chairman (ESCOMs) DGPS based GIS survey of 57,000 KMs & 72+ lakhs consumers AMR Implementation for DTs and HT customers – 65,000+ modems Establishment of LAN, MPLS, VPN across 700+ offices in 98 towns 1 Customer Call center per ESCOM with toll free number Training of approx. 5000+ utility personnel Data Center : Bangalore Disaster Recovery Center: Chennai BESCOM : Bangalore MESCOM : Shikaripura HESCOM : Dharwad CESC : Mandya GESCOM : Gulbarga Pilot Site BESCOM : Bangalore MESCOM : Mangalore HESCOM : Hubli CESC : Mysore GESCOM : Gulbarga Customer Care Cntres Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

6. R-APDRP Part- A : 17 modules to be implemented Other Modules Disconnection/Dismantling Network Analysis MIS Identity & Access Mgmt System Security Requirement Maintenance Management Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

7. Module – Metering, Billing & Collection Objective Benefits Metering - An Effective meter reading system to enhance effectiveness of measurement process, allows accurate metering for all customers & tapping revenue loss through the identification and handing of exceptions Billing and Collection - ensure the timely and accurate billing and collection Automatic collection of meter data Interfacing with Spot billing devices & MRI data for uploading meter readings incl consumer meter readings Meter reading plan generation Monitoring meter reading plan Monitoring Customer exception Automatic Overdue alerts; Bill correction & amendments online Integration & flexibility of using SBMs Decentralized payment processing & centralized reconciliation; Daily reconciliation of cash and bank Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

8. Module – Asset Management (WAMS) Objective Benefits Accounting & maintaining the vast fixed asset base efficiently, with following features: Easy data migration from legacy Easy to update asset data as asset base grows dynamically Easy to integrate with other applications for accurate data exchange (GIS/Maintenance etc) Scalable for growing requirements of utilities Billing & Collection Life cycle analysis Manage various depreciation policies Manage the budgets for assets Manage extensive reporting using built-in reporting tools and business analytics Manage the compliance related to process/statutory requirements Work Orders Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

9. Module – GIS based Integrated Network Analysis Objective Benefits Perform several types of analyses on balanced or unbalanced three-phase, two phase and single- phase systems that are operated in radial, looped, meshed or mixed configurations. Create "what-if" studies and performing simulations to evaluate the impact of modifications to existing network. Online Creation and editing of network Online Load flow and voltage drop analysis Optimization studies like capacitor placement, network reconfiguration, conductor up-gradation, express feeder, load balancing & load allocation etc. Network design reports, cost estimates, financial analysis Integration with New connection module for checking network capability, augmentation requirement (if any) Can generate Single Line Diagrams (SLD) based on GIS Surveyed Data of Electric Lines & various equipments and it enables HT/ LT network analysis of the system. The SLD depicts the location of pole, transformer, distance between poles and other network features. Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

10. Module – Meter Data Acquisition System Objective Expected Benefits To acquire meter data from System & Selected consumer meters automatically from remote avoiding any human intervention, Monitor important distribution parameters, use meter data for accurate billing purposes and generate exceptions and MIS reports for proper planning, monitoring, decision support and taking corrective actions on the business activities by the management. To provide continuous on line monitoring & logging of parameters on real time basis Voltage, Phase to Phase and Phase to Neutral Current on each phase, Power factor, Frequency Power - Active / reactive / Apparent Energy – Active, Reactive and Apparent To provide continuous on line monitoring & logging of above mentioned parameters & MIS report for System outage / downtime feeder wise Energy balancing at sub stations Daily peak loads feeder / transformer wise Peak Load of the Station Bus bar profile; Daily Log sheets & required reports Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

11. R-APDRP – Outcomes Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka

Town Integration Energy Audit Schedule MBC live (100% implementation) 12. R-APDRP Phase A – Go-live Status of Karnataka Scheduled date for Go live / integration of all towns Sep 2015 Town Integration Energy Audit Schedule Month Up to Jan’ 13 Up to Feb’ 13 Up to Mar’ 13 Up to Apr’ 13 Up to May’ 13 Up to Jun’ 13 Up to Jul’ 13 Aug’ 13 Up to Sep’ 13 Up to Oct’ 13 Nov’ 13 Dec’ 13 Jan’ 14 Feb’ 14 Mar’ 14 Apr’ 14 Up to May’ 14 Up to Jun’ 14 Jul’ 14 Aug’ 14 Sep’ 14 Oct’ 14 Nov’ 14 Dec’ 14 Jan’ 15 Feb’ 15 Mar’ 15 Apr’ 15 May’ 15 Jun’ 15 Target 10 18 40 50 53 55 75 91 98 Achieved 6 31 46 51 60 ESCOM MBC live (100% implementation) Full Stack with EA BESCOM 25 16 CESC 12 6 GESCOM 21 11 HESCOM 29 26 MESCOM 1 TOTAL 98 60

13. R-APDRP Part – A – Financial Progress Rs in Crores ESCOM NO.OF TOWNS TOTAL PROJECT COST LOAN SANCTIONED (Convertible to Grant ) PFC DISBURSEMENT DETAILS TOTAL EXPENDITURE INCURRED FROM PFC FUNDS FROM OWN FUNDS TOTAL BESCOM 25 272.80 252.00 146.65 104.16 31.47 135.63 MESCOM 11 38.75 29.05 7.24 10.63 17.87 CESC 12 28.94 28.91 16.64 13.14 HESCOM 29 55.31 54.66 31.56 28.35 GESCOM 21 35.21 34.11 19.20 3.19 22.39 98 431.01 398.7 221.29 172.09 45.29 217.38 * Rs. 31.47 crores spent for metering out of BESCOM funds, which needs to be approved in the revised DPR by PFC. Restructured Accelerated Power Development & Reforms Programme (R-APDRP), Karnataka