© 2008 Prentice Hall, Inc.6 – 1 Operations Management Lecture 5 – Managing Quality PowerPoint presentation to accompany Heizer/Render Principles of Operations.

Slides:



Advertisements
Similar presentations
TQM and Quality Control
Advertisements

“Statistics is the science of gaining information from numerical data.” -- Moore Definitions of Statistics Statistics: “the science of data involving collecting,
Chapter 2 Managing Quality.
Managing Quality Chapter 5.
Operations Management
Operations Management Managing Quality Chapter 6
© 2006 Prentice Hall, Inc.6 – 1 Operations Management Chapter 6 – Managing Quality © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Chapter 6 Managing Quality.
Managing Quality.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Operations Management Managing Quality Chapter 6
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
© 2008 Prentice Hall, Inc.6 – 1 Operations Management Chapter 6 – Managing Quality PowerPoint presentation to accompany Heizer/Render Principles of Operations.
© 2006 Prentice Hall, Inc.6 – 1 Operations Management Chapter 6 – Managing Quality © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Managing Quality 12 July Introduction What: quality in operations management Where: Quality affects all goods and services Why: Customers demand.
Operations Management
BMM 3633 Industrial Engineering. Learning Objectives:  Define the meanings of product quality, cost of quality and quality conformance.  Describe the.
Copyright 2006 John Wiley & Sons, Inc. Quality Management Chapter 3.
Operations Management Managing Quality Chapter 6
Chapter 6: Managing Quality BUSI Quality What is quality? In what ways does quality impact the organization? What are some of the reasons why we.
TOTAL QUALITY MANAGEMENT (TQM)
Total Quality Management(TQM) The word “total” conveys the idea that all employees, throughout every function and level of organization, pursue quality.
Operations Management
1 Management of Quality Operations Management Session 4.
1 IES 331 Quality Control TQM / Quality Systems and Standards Week 15 September 13-15, 2005.
© 2008 Prentice Hall, Inc.6 – 1 Operations Management Chapter 6 – Managing Quality PowerPoint presentation to accompany Heizer/Render Principles of Operations.
6 Quality Management and International Standards
Operations and Supply Chain Management
Chapter 9 Six Sigma Quality.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Six-Sigma Quality Chapter 9.
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
Quality Prepared By: Ali Siddiqi.
1-1 1 Quality Management Chapter Total Quality Management (TQM) Total quality management is defined as managing the entire organization so that.
© 2006 Prentice Hall, Inc.6 – 1 Operations Management Chapter 6 – Managing Quality © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 8 1.
© 2006 Prentice Hall, Inc.6 – 1 Managing Quality Ch6 Production Planning and Control.
6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 6 6 Managing Quality PowerPoint presentation to accompany Heizer and Render Operations.
Lec#6 Project Quality Management Total Quality Management Ghazala Amin.
Quality and Productivity Management Deming, TQM, and 6 Sigma.
Quality Control and Management. Quality and Cost of quality “Quality is the totality of features and characteristics of a product or service that bears.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
6 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 6 6 Managing Quality PowerPoint presentation to accompany Heizer and Render Operations.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 3 Roberta Russell.
TOTAL QUALITY MANAGEME NT (TQM). Total Quality Management TQM is a philosophy which applies equally to all parts of the organization. TQM can be viewed.
Quality: Management of Quality Pertemuan 11 Mata kuliah: J Manajemen Operasional Tahun: 2010.
© 2006 Prentice Hall, Inc.6 – 1 Operations Management Chapter 6 – Managing Quality © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
12-1 Purchasing, Inventory, And Quality Control Purchasing & Suppliers Purchasing & Suppliers Purchasing Procedures & Inventory Control Purchasing Procedures.
© Wiley Total Quality Management by Adnan khan.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2005 Wiley1 Total Quality Management Chapter 5.
Definition: Total Quality Management Total Quality Management is a management approach that originated in the 1950s and has steadily become more popular.
DEFINITIONS Juran defined it as 'fitness for purpose'. Crosby, another quality guru, defined quality as 'conformance to requirements'. Feigenbaum, who.
GROUP MEMBERS: Muniandy A/L Songappen (816530) Sumitra Subramaniam (816714) Yeoh Hoei Zu (814695) Nitha K.Madhavan ( TITLE : MANAGING QUALITY OPERATIONS.
6 - 1© 2014 Pearson Education, Inc. Managing Quality 6 © 2014 Pearson Education, Inc.
6 - 1© 2014 Pearson Education, Inc. Managing Quality PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
6 - 1 Copyright © 2014 Pearson Canada Inc. Heizer, Render, Griffin Operations Management Canadian Edition Chapter 6: Managing Quality Slides adapted for.
Operations Management
Operations Management Framework
6 Managing Quality PowerPoint presentation to accompany
Introduction to Quality and Statistical Process Control
6 Managing Quality PowerPoint presentation to accompany
TOTAL QUALITY MANAGEMENT (TQM)
Quality Certification
6 Managing Quality PowerPoint presentation to accompany
Operations Management
6 Managing Quality PowerPoint presentation to accompany
Presentation transcript:

© 2008 Prentice Hall, Inc.6 – 1 Operations Management Lecture 5 – Managing Quality PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 7e Operations Management, 9e

© 2008 Prentice Hall, Inc.6 – 2 Recap  Defining Quality  What is Quality  Basic Quality function  Quality Assessment Criteria  Principle dimensions of quality  Quality and Strategy  Implications of Quality

© 2008 Prentice Hall, Inc.6 – 3 Recap…  Cost of Quality  Leaders in Quality  Ethics and Quality Management  International Quality Standards  ISO 9000  ISO14000

© 2008 Prentice Hall, Inc.6 – 4 Outline – Continued  TQM & Deming 14 points  Total Quality Management  Continuous Improvement  Six Sigma  Employee Empowerment  Benchmarking  Just-in-Time (JIT)  Taguchi Concepts  Knowledge of TQM Tools

© 2008 Prentice Hall, Inc.6 – 5 Outline – Continued  Tools of TQM  Check Sheets  Scatter Diagrams  Cause-and-Effect Diagrams  Pareto Charts  Flowcharts  Histograms  Statistical Process Control (SPC)

© 2008 Prentice Hall, Inc.6 – 6 Learning Objectives When you complete this chapter you should be able to:  Understanding TQM concepts and approaches  Explain Six Sigma  Explain how benchmarking is used  Explain quality robust products and Taguchi concepts  Use the seven tools of TQM

© 2008 Prentice Hall, Inc.6 – 7 TQM Encompasses entire organization, from supplier to customer Stresses a commitment by management to have a continuing, companywide drive toward excellence in all aspects of products and services that are important to the customer

© 2008 Prentice Hall, Inc.6 – 8 Deming’s Fourteen Points 1.Create consistency of purpose 2.Lead to promote change 3.Build quality into the product; stop depending on inspection 4.Build long-term relationships based on performance, not price 5.Continuously improve product, quality, and service 6.Start training 7.Emphasize leadership

© 2008 Prentice Hall, Inc.6 – 9 Deming’s Fourteen Points 8.Drive out fear 9.Break down barriers between departments 10.Stop haranguing workers 11.Support, help, improve 12.Remove barriers to pride in work 13.Institute a vigorous program of education and self-improvement 14.Put everybody in the company to work on the transformation Table 6.1

© 2008 Prentice Hall, Inc.6 – 10 Seven Concepts of TQM  Continuous improvement  Six Sigma  Employee empowerment  Benchmarking  Just-in-time (JIT)  Taguchi concepts  Knowledge of TQM tools

© 2008 Prentice Hall, Inc.6 – 11 Continuous Improvement  Represents continual improvement of all processes  Involves all operations and work centers including suppliers and customers  People, Equipment, Materials, Procedures

© 2008 Prentice Hall, Inc.6 – Do Test the plan 3. Check Is the plan working? 4. Act Implement the plan 1.Plan Identify the improvement and make a plan Shewhart’s PDCA Model Continuous Improvement Kaizen Zero Defects

© 2008 Prentice Hall, Inc.6 – 13 Six Sigma  Two meanings  Statistical definition of a process that is % capable, 3.4 defects per million opportunities (DPMO)  A program designed to reduce defects, lower costs, and improve customer satisfaction 6666

© 2008 Prentice Hall, Inc.6 – 14 Six Sigma Mean Lower limitsUpper limits 3.4 defects/million ±6  2,700 defects/million ±3 

© 2008 Prentice Hall, Inc.6 – 15 Six Sigma Program  Originally developed by Motorola, adopted and enhanced by Honeywell and GE  Highly structured approach to process improvement  A strategy  A discipline - DMAIC 6666

© 2008 Prentice Hall, Inc.6 – 16 Six Sigma 1.Define critical outputs and identify gaps for improvement 2.Measure the work and collect process data 3.Analyze the data 4.Improve the process 5.Control the new process to make sure new performance is maintained DMAIC Approach

© 2008 Prentice Hall, Inc.6 – 17 Six Sigma Implementation  Emphasize defects per million opportunities as a standard metric  Provide extensive training  Create qualified process improvement experts (Black Belts, Green Belts, etc.)  Set stretch objectives This cannot be accomplished without a major commitment from top level management

© 2008 Prentice Hall, Inc.6 – 18 Employee Empowerment  Getting employees involved in product and process improvements  85% of quality problems are due to process and material  Techniques  Build communication networks that include employees  Develop open, supportive supervisors  Move responsibility to employees  Build a high-morale organization  Create formal team structures

© 2008 Prentice Hall, Inc.6 – 19 Quality Circles  Group of employees who meet regularly to solve problems  Trained in planning, problem solving, and statistical methods  Often led by a facilitator  Very effective when done properly

© 2008 Prentice Hall, Inc.6 – 20 Use internal benchmarking if you’re big enough Benchmarking Selecting best practices to use as a standard for performance  Determine what to benchmark  Form a benchmark team  Identify benchmarking partners  Collect and analyze benchmarking information  Take action to match or exceed the benchmark

© 2008 Prentice Hall, Inc.6 – 21 Best Practices for Resolving Customer Complaints  Make it easy for clients to complain  Respond quickly to complaints  Resolve complaints on first contact  Use computers to manage complaints  Recruit the best for customer service jobs

© 2008 Prentice Hall, Inc.6 – 22 Just-in-Time (JIT) Relationship to quality:  JIT cuts the cost of quality  JIT improves quality  Better quality means less inventory and better, easier-to- employ JIT system

© 2008 Prentice Hall, Inc.6 – 23 Just-in-Time (JIT)  ‘Pull’ system of production scheduling including supply management  Production only when signaled  Allows reduced inventory levels  Inventory costs money and hides process and material problems  Encourages improved process and product quality

© 2008 Prentice Hall, Inc.6 – 24 Taguchi Concepts  Engineering and experimental design methods to improve product and process design  Identify key component and process variables affecting product variation  Taguchi Concepts  Quality robustness  Quality loss function  Target-oriented quality

© 2008 Prentice Hall, Inc.6 – 25 Quality Robustness  Ability to produce products uniformly in adverse manufacturing and environmental conditions  Remove the effects of adverse conditions  Small variations in materials and process do not destroy product quality

© 2008 Prentice Hall, Inc.6 – 26 Quality Loss Function  Shows that costs increase as the product moves away from what the customer wants  Costs include customer dissatisfaction, warranty and service, internal scrap and repair, and costs to society  Traditional conformance specifications are too simplistic Target- oriented quality

© 2008 Prentice Hall, Inc.6 – 27 Unacceptable Poor Good Best Fair Quality Loss Function High loss Loss (to producing organization, customer, and society) Low loss Frequency LowerTargetUpper Specification Target-oriented quality yields more product in the “best” category Target-oriented quality brings product toward the target value Conformance-oriented quality keeps products within 3 standard deviations L = D 2 C where L =loss to society D =distance from target value C =cost of deviation

© 2008 Prentice Hall, Inc.6 – 28 Tools of TQM  Tools for Generating Ideas  Check sheets  Scatter diagrams  Cause-and-effect diagrams  Tools to Organize the Data  Pareto charts  Flowcharts  Tools for Identifying Problems  Histogram  Statistical process control chart

© 2008 Prentice Hall, Inc.6 – 29 //// ////// ///// ////// /// // / Hour Defect A B C / // / Seven Tools of TQM (a)Check Sheet: An organized method of recording data

© 2008 Prentice Hall, Inc.6 – 30 Seven Tools of TQM (b)Scatter Diagram: A graph of the value of one variable vs. another variable Absenteeism Productivity

© 2008 Prentice Hall, Inc.6 – 31 Seven Tools of TQM (c)Cause-and-Effect Diagram: A tool that identifies process elements (causes) that might effect an outcome CauseMaterialsMethods ManpowerMachinery Effect

© 2008 Prentice Hall, Inc.6 – 32 Seven Tools of TQM (d)Pareto Chart: A graph to identify and plot problems or defects in descending order of frequency Frequency Percent ABCDEABCDEABCDEABCDE 80 % of the firm’s problems are a result of only 20% of the causes

© 2008 Prentice Hall, Inc.6 – 33 Seven Tools of TQM (e)Flowchart (Process Diagram): A chart that describes the steps in a process

© 2008 Prentice Hall, Inc.6 – 34 Seven Tools of TQM (f)Histogram: A distribution showing the frequency of occurrences of a variable Distribution Repair time (minutes) Frequency

© 2008 Prentice Hall, Inc.6 – 35 Seven Tools of TQM (g)Statistical Process Control Chart: A chart with time on the horizontal axis to plot values of a statistic Upper control limit Target value Lower control limit Time

© 2008 Prentice Hall, Inc.6 – 36 Forthcoming lecture- Managing Quality (Quality Tools implications and problem solving)