H. Hayano, KEK, 10072014 New SRF Facility at Belgrade SRF-WG.

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Ultrasonic washer and HPR The 3nd IHEP-KEK SC collaboration meeting Ultrasonic Washer and HPR device for 9-cell 1.3GHz Cavity Zhongquan.Li, Jiyuan Zhai,
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
US Cavities Status and Plan Mark Champion 01 October 2009.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Accelerator R&D status in cooperation with CERN and KEK 1.BSM, BHM (T. Mitsuhashi) 2. Crab Cavity (Y. Morita) 3. X-band Acc. Structure (T. Higo) 10 th.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Detail plan of S1-Global H. Hayano (KEK),
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Vertical Electro-Polishing activities at CEA Saclay
Status and plans for the 3.9 GHz section of XFEL
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
Status of cavity fabrication facility at KEK
Vertical Electropolishing at Marui & KEK
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
Effort Torwards Improving Large Scale Production for SC Cavities
Recent results of Vertical-EP at KEK-Marui
C50 Cavity pair Assembly Changes
Status of Cryogenics Facilities Design
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Accelerator Module Test Facility
IHEP Cryomodule Status
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG

Outline of proposed Program 2012 supplementary budget, Industry-University cooperation, Center Of Innovetion (COI) program Targeting years future social needs, innovative technology development center based on Industry-University cooperation is to be facilitated. KEK and industries proposed: (1) Pollution removal with electricity generation technology, (2) International electricity network, (3) New alternative resource material generation, (4) Ozone layer generator, In the futer. To make innovation to solve above subject, Seeds technologies are; (a) superconducting accelerator technologies (b) technologies of quantum-beam utilization (c) cryo-technologies Energy Environment Resource SC accelerator Industrialization of, compact sized of, SC accelerator = ILC

Earth CleanerInternational Energy Network Ozone layer generator Compact material analyzer for new resource material Laboratory university project Overall view of proposal

4 New SRF facility : promotion of superconducting accelerator utilization New building (80m x 30m) is under construction at North of STF SC cavity inspection & process, vertical test, cryomodule assembly, cryomodule test

Satellite View of new building location

Building location detail New SRF building STF building

Construction status of new building Construction compeletion will be end of Jan. 2015

List of new device to be installed (1) A large size clean room for ILC cryomodule assembly (2) EP facility to develop industrial EP (3) 4-cavities Vertical test stand (4) ILC Cryomodule assembly tools (5) Helium Cryogenics (6) Cryomodule test stand (to be installed later ) with (1) Center control room (2) KEK researcher room (3) Industry room (4) Small meeting room (5) Exhibition space

ISO-4, ISO-6 clean rooms, with dual cavity rail ISO4 & ISO6 Clean Rooms for ILC cryomodule assembly

Flat-floor Clean Room, ventilating to side wall For easy floor cleaning, easy rail dip cleaning Cavity outside wash room HPR

Block diagram of vertical EP system (VEP) HPR Scrubber Wast water tank EP system EP tank

Vertical EP (VEP) Cavity mount stage vertical horizontal Mounting at horizontal, Electrode insertion in vertical, EP at vertical. Cavity:fixed Electrode: rotation EP acid flow:vertical H2 gas flow:suction from top Motor driven

VEP Cavity vertical position during electrode insertion and EP Cavity horizontal position during cavity and EP header installation Use as a horizontal EP is also possible.

VEP Electrode Insertion HPR (Nozzle rotation type) VEP

HPR (High Pressure water Rinsing) Top view Side view Front view from EP floor Clean Room side Clean Room side EP floor Side(2F) Take-out To Clean room Mount From EP room HPR Cavity: no rotation, but up and down Water nozzle: rotation

DESY AMTF Under Building 4-cavity Vertical Test Stand, following DESY AMTF KEK new vertical test cryostat Vertical Test

Hanging 4 cavities with jacket and pipe Vertical Test TESLA cavity with jacket TESLA cavity w/o jacket

Cryomodule assembly tool Cryomodule Assembly tools, following to DESY/Saclay XFEL facility

Cryomodule assembly tool Cryomodule Assembly tools, following to DESY/Saclay XFEL facility

Experiment Hall South half-side 7t crane North half-side 15t crane View from control room View from east to west

Resident space 1 st floor, exhbition space and stairs, view from entrance 2nd floor, open space and control room

Plan of Start-up schedule JFY2013JFY2014JFY2015JFY2016 building facility Module Test facility COI project Design and construction Design and fabrication Kept in ATF Installation and commissioning Design and fabrication COI project start Organizing industry-university cooporation And project planning We are here Budget came here

End of Slide