LNL M.Biasotto, Roma, 22 novembre 2001 1 Some notes on WP6 INFN Testbed.

Slides:



Advertisements
Similar presentations
DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
Advertisements

E. Ferro, CNAF, aprile LCFG: testbed upgrade Enrico Ferro INFN-LNL.
Andrew McNab - Manchester HEP - 15 February 2002 Testbed Release in the UK EDG Testbed 1 GridPP sources of information GridPP VO GIIS and Resource Broker.
LCFG overview and future Michael George University of Liverpool
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.
LNL CMS M.Biasotto, Bologna, 29 aprile LNL Analysis Farm Massimo Biasotto - LNL.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
INFN - Ferrara BaBarGrid Meeting SPGrid Efforts in Italy BaBar Collaboration Meeting - SLAC December 11, 2002 Enrica Antonioli - Paolo Veronesi.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
C. Loomis – Testbed: Status… – Sep. 5, 2002 – 1 Testbed: Status & Plans Charles Loomis (CNRS) Sept. 5, th Project Conference (Budapest)
1 Deployment of an LCG Infrastructure in Australia How-To Setup the LCG Grid Middleware – A beginner's perspective Marco La Rosa
The EDG Testbed Deployment Details The European DataGrid Project
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
CERN LCG-1 Status and Issues Ian Neilson for LCG Deployment Group CERN Hepix 2003, Vancouver.
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
How to Install and Use the DQ2 User Tools US ATLAS Tier2 workshop at IU June 20, Bloomington, IN Marco Mambelli University of Chicago.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Budapest, September 5th, 2002 DataGrid Accounting System DGAS Current status & plans Stefano Barale INFN Budapest, September.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Ariel Garcia LCG cluster installation, EGEE training, Ariel Garcia - IWR LCG Cluster Installation Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
22nd April 2002 Steve Traylen, RAL, 1 LCFG Installation Steve Traylen. LCFG – A tool for installation and configuration. UK HEP SYSMAN,
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
LCG LCG-1 Deployment and usage experience Lev Shamardin SINP MSU, Moscow
E. Ferro, CNAF, april Enrico Ferro INFN-LNL Installation of a LCFG server.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
Yannick Patois - Datagrid Software Repository Presentation - March, n° 1 Datagrid Software Repository Presentation CVS, packages and automatic.
1 DataTAG-WP4 and GLUE ( mainly from A.Ghiselli II INFN-Grid workshop) Mirco Mazzucato Gridstart meeting at HPC Cetraro.
The EDG Testbed The European DataGrid Project Team
Site Certification Process (Round Table) Fabio Hernandez IN2P3 Computing Center - Lyon October
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
CERN 19/06/2002 Kickstart file generator Andrea Chierici (INFN-CNAF) Enrico Ferro (INFN-LNL) Marco Serra (INFN-Roma)
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
Stephen Burke – Sysman meeting - 22/4/2002 Partner Logo The Testbed – A User View Stephen Burke, PPARC/RAL.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
2007/05/22 Integration of virtualization software Pierre Girard ATLAS 3T1 Meeting
Testbed: Status & Plans
The EDG Testbed Deployment Details
WP4-install status update
Leanne Guy EGEE JRA1 Test Team Manager
LCG experience in Integrating Grid Toolkits
The EU DataGrid Fabric Management Services
Presentation transcript:

LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed

LNL M.Biasotto, Roma, 22 novembre Integration Team is late in releasing the officiale software for Testbed 1 Integration Team is late in releasing the officiale software for Testbed 1 INFN WP6, for the deployment of INFN testbed sites, activated a little working group to: INFN WP6, for the deployment of INFN testbed sites, activated a little working group to: –integrate all software needed (Globus, WPs middleware, Applications) –prepare an LCFG toolkit for automatic installation and configuration of testbed machines (CE and SE) –setup general services (VO LDAP server, Replica Catalog, Resource Broker, ecc.) at CNAF –provide documentation and help to site admins INFN WP4 people (Andrea, Enrico, Marco, Massimo) involved in the setup of WP4 tools (LCFG) INFN WP4 people (Andrea, Enrico, Marco, Massimo) involved in the setup of WP4 tools (LCFG)

LNL M.Biasotto, Roma, 22 novembre Problems with WP4 tools WP4 tools deployed in 7 INFN sites WP4 tools deployed in 7 INFN sites Main WP4-installations problems found: Main WP4-installations problems found: –kernel SCSI support (solved by Enrico and Andrea) –LCFG Server Installation Guide (problem found also ny Nikhef) –Lack of sync between WP4 CVS and web site (now should be solved) –Problem with large SCSI disks (solved by Andrea) –updaterpms doesnt install some packages that rpm –i does –other bug reported with Bugzilla

LNL M.Biasotto, Roma, 22 novembre Integration Team ? One of the main problems: RPM lists One of the main problems: RPM lists –Integration Team didnt provide the lists of RPM needed to setup a CE/SE –many incompatibilities and inconsistencies trying to install all software (we often resorted to option –force) Lack of documentation on the details to configure Globus services in order to correctly setup a CE/SE Lack of documentation on the details to configure Globus services in order to correctly setup a CE/SE

LNL M.Biasotto, Roma, 22 novembre Work in progress LCFG toolkit (set of configuration files) for automatic installation and configuration of testbed machines LCFG toolkit (set of configuration files) for automatic installation and configuration of testbed machines LCFG Globus object for configuration of Globus components LCFG Globus object for configuration of Globus components Help to INFN site admins (LCFG hot-line: , Enricos number) Help to INFN site admins (LCFG hot-line: , Enricos number) Web page with some results, SCSI kernel and obj-globus rpms: Web page with some results, SCSI kernel and obj-globus rpms: –

LNL M.Biasotto, Roma, 22 novembre Conclusions Lack of Integration Team Lack of Integration Team User-friendly tools fro managing configuration files and RPM lists User-friendly tools fro managing configuration files and RPM lists Improve software-quality: ready to use tool Improve software-quality: ready to use tool Network boot Network boot