CLOSURE OF THE BRITANNIA SANITARY LANDFILL SITE – IS IT THE END OR JUST THE BEGINNING? 2004 NATO/CCMS Pilot Study on Prevention and Remediation in Selected.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

NC SWANA FALL 2014 MEETING Presented by Ed Mussler P.E., Wilmington, NC October 2014 DWM Post-Closure Landfill Use Concepts and Considerations.
Anchorage Regional Landfill Landfill Gas-to-Energy Project
Overview Operation and Management Lease Agreement started September 19, County has received approximately $9.5 M in revenue: –$7.4 M.
Barnstable County Commissioners Summary Report Municipal Solid Waste Disposal Alternatives Analysis April 7, 2010.
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
Landfill Gas 101 HALTON REGION Public Works - Waste Management Services May 15, 2014 – MWA Spring Workshop, Hockley Valley Resort Presented by: Art Mercer,
Zero Waste Operational Plan Policy & Services Committee 3/13/2007.
The purpose of the facility is to provide a state-of-the-art 300-bed replacement for the aging Matsqui-Sumas-Abbotsford (MSA) General Hospital. The facility.
Madison’s Sustainable Design and Energy Committee: Notes from Portland, Oregon October 3, 2005.
Taking the Mystery out of Economic Development Tools Chris Eng, Chisago County HRA-EDA.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
2013 BUDGET General Fund Revenues$84,870,998 Expenditures Divisional 69,635,424 Non-Divisional 5,695,509 Transfers 9,540,065 84,870,998 $ Nil * Capital$14,788,522.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Brownfields: Emerging Issues in Redevelopment The Economics of Green Presented to: Rutgers, New Jersey Agricultural Experiment Station September 16, 2008.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
PUBLIC PRIVATE PARTNERSHIPS (Alternate Financing and Procurement-Ontario) LARRY J. McCABE, CHIEF ADMINISTRATIVE OFFICER.
2010 Budget Overview April 7, Overview This is the 2010 Budget document as recommended by the Budget Steering Committee to be presented to Council.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Meeting the challenge of housing growth in Birmingham
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Fourth Meeting June 26, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Third Meeting May 22, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Genesis Solar Module Brochure ™
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Single Stream Recycling Where are We? NRRA Annual Conference June 7, 2011.
Economics of The Yankee Ridge Wind Farm Project Mark E. Hardwidge Rachael Jabusch.
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
Creating a Win-Win Relationship Presented by: John McCarthy GO Airport Express.
Construction Category Management Planning Version 1.1 (May 2015)
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
CITY OF SANTA BARBARA Budget Overview APA Citizens Academy Paul Casey, Assistant City Administrator October 15, 2013.
Airport Shuttle Agreements Presented by: John McCarthy GO Airport Express.
Beyond Barriers: A Housing Model for Families with Substance Abuse Issues.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Solving Challenges Others Cannot Virginia’s Public Private Partnership Law Toyo University Tokyo, Japan Christopher D. Lloyd September 29, 2008.
CSD-14 New York 2 May  A Government of Canada program that partners with cities in the developing world to address urban challenges.
Natural Resource Partners L.P. RBC Capital Markets 2 nd Annual MLP Conference Dallas, TX November 16, 2006.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Utilities Department Solid Waste System Tipping Fees November 11, 2008.
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Sustainable Energy Utility B.C. Ground Water Association March 30 th,2007.
Solid Waste Association of North America City of Brandon’s “Presentation on Methane Gas Utilization” May 14, 2009 – Winnipeg.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
Alcoa’s Response to Climate Change Lee Califf Director, Government Affairs.
Regional Recycling Solutions, LLC.   County purchased 103 acres in July of 1993 from Greene Land Company  Elchin Inc purchases 40 acres in April 1998.
Manitoba Association of Regional Recyclers “Presentation on Methane Gas Recovery” Tom Keep Community Development Coordinator – Environment November 7,
1 McMaster Innovation Park Executing on a Vision Presentation to the Kirkendall Neighbourhood January 10 th, 2008 Zach Douglas.
Proposed Hotel and Convention Center City Council Meeting December 10, 2013.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
Pellicer Flats August 23, pellicer Flats 3 Contracts Purchase and Sales Agreement with Option – Purchase Parcel I for 735 acres – Option for additional.
INDIAN CREEK GOLF CLUB Post Flood Analysis September
Presented By: Budget & Research Department Karen Rhodes-Whitley FY STATUS REPORT & THREE-YEAR FINANCIAL FORECAST SUMMARY FISCAL YEARS
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Kawartha Lakes Municipal Airport
Why Renewable Natural Gas
First Nation Waste Management Initiative
Developing a MRF Public-Private Partnership in the City of Dallas
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Background We’koqma’q began their fish farming operations in 2011.
Integrated Bilateral Agreement (IBA) 2018 to 2028
Delta Water Supply Project
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

CLOSURE OF THE BRITANNIA SANITARY LANDFILL SITE – IS IT THE END OR JUST THE BEGINNING? 2004 NATO/CCMS Pilot Study on Prevention and Remediation in Selected Industrial Sectors Cardiff, Wales May 2004 By Larry Conrad, P.Eng. Manager, Waste Operations Waste Management Division Regional Municipality of Peel

The Britannia Sanitary Landfill Site Located in south central Canada in the Province of Ontario

Approximately 200 acres Located in the City of Mississauga, Region of Peel Region of Peel: population of 1 million The Britannia Sanitary Landfill Site

The Britannia Hills Golf Course What Makes Britannia Hills Unique? Partnership between City of Mississauga and Region of Peel Operation of golf course and landfill gas power generation facility on a common property

Closure & Transition of the Britannia Sanitary Landfill

From Landfill to Golf Greens Britannia Opened in 1980 Planned to close in 1992 Golf course design created for end-use of landfill

Planning the Course

Planning the Course

Building the Course Environmental Health & Safety Region of Peel requirements regarding the final cap Challenges to building a golf course at Britannia:

Opening the Course May 1999 Partnership with Mississauga, golf course operator 1999: Received awards from municipal associations

Beyond 2000: Britannia Hills and Britannia Landfill Site Conclusion: Landfill and recreation can be compatible when planned carefully and constructed

Beyond 2000: Britannia Hills and Britannia Landfill Site The Landfill was closed June 30, 2002 after 22 years of operation The Golf Course and the Landfill Site

Britannia Hills: Phase II Peel is embarking on exciting new initiatives Britannia Hills Phase II, a championship 27 hole golf course

Britannia Hills: Phase II Peel needed to do three things: 1.Conduct a market and financial analysis 2.Negotiate agreement with City of Mississauga for construction and operation of Britannia Hills: Phase II 3.Relocate public waste and recycling drop off facilities

Britannia Hills: Phase II Market analysis showed strong support. In Ontario, 2.1 million golfing participants. Britannia Hills is well located. Financial analysis indicated 11% return on capital investment by year 5. Total capital investment of $13,135,000 $3,135,000 for Phase I $10,000,000 for Phase II

Britannia Hills: Phase II A very important component of Phase II expansion was the development of management agreement with City of Mississauga to construct and operate the facility Discussions based on five negotiating principles

Britannia Hills Phase II 1.Equal partners. Will share equally rewards and risks (exception for environmental) 2.Partnership Agreement must provide “win-win” for both parties 3.Mississauga must receive a return for its management expertise 4.The Region must receive financial recognition for the capital investment 5.Creation of a reserve fund. Equal contributions from net profit. Reserve to fund all future capital expenses

Britannia Hills Phase II Financial Projections Revenue$2.4M$2.9M$3.3M Costs(2.1M)(2.2M)(2.2M) Profit0.3M0.7M1.1M Total Rounds43,00048,00053, Hole28,00029,00030,000

Britannia Hills: Phase II $10,000,000 Capital Cost broken down: Golf Course Construction:$3.5 million Building Construction:$4.0 million Equipment Purchases:$0.9 million “Grow In”, permits, etc:$1.6 million

Britannia Hills Phase II Resulting Contract between Peel and City of Mississauga: –A 99 year management and operating agreement –Equal split of net revenues until Peel’s capital repaid. City then retains 100% revenue and responsibility for all costs – maintenance, recapitalization and course operations –City assumes control of reserve fund. To be maintained through revenues –City agrees to lease the land for construction of the new community recycling center (CRC) for period of up to 99 years at $2.00 per annum

Britannia Hills Phase II Phase II concept includes: 18 hole championship course 9 hole short course and training academy for juniors and new golfers –Who knows may be even the next Mike Weir? Double ended driving range 12,000 sq. ft. clubhouse with banquet facilities for 250 guests

Britannia Hills Phase II

Britannia Landfill Gas Project Currently LFG collected through leachate collection system and flared on site to control odours The Region was happy with the existing situation Landfill Gas Development Industry and Federal Government not happy

Landfill Gas Project Definition 1.The Region was not interested in investing any funds into the project 2.The Region would fully cooperate in the development of the project 3.The successful proponent would be required to take over the existing components in operation at the site 4.The project was not an environmental remediation program

Landfill Gas Project Definition 4.The project to take a back seat to the development of the golf course  In no way could it impact the construction, operation, or the future development opportunities of the golf course 5.Greenhouse gas credits generated were to be kept by Region and not sold on the open market

Britannia Landfill Gas Project Peel issued 2 Stage Proposal for a Design/Build Gas-to-Energy System Stage 1: Identify proponents. Resulted in eight submissions Stage 2: Invite detailed submissions for evaluation. –All submissions received proposed electrical generation to be fed into the Ontario Hydro power grid at approximately $70 per MWH. Award – GRS Comcor Environmental Ltd. –To build their plant off site

Britannia Landfill Gas Project Ontario Hydro Will Not Purchase the Power

Britannia Landfill Gas Project Proposal to Ontario Clean Water Agency –Combine power from the landfill and their on-site generators and sell electricity to local utility Too expensive, but unanimous enthusiasm for concept Market identified – Lakeview Waste Water Treatment Plant Lakeview is owned by the Region and operated under contract by the Ontario Clean Water Agency

Aerial View of the Lakeview Sewage Treatment Plant

Britannia Landfill Gas Project Agreement reached for 20 year period: GRS-Comcor forms partnership with Integrated Municipal Services to create a new company- IGRS Region guarantees IGRS $69/MWh for 5 years. Adjusted by CPI over remaining 15 years –Annual premium of $315,000 based on Utility prices of $55.06/MWh for first 10 years

Britannia Landfill Gas Project Royalties ($3.45/MWh) paid to the Region. Effective price $65.55/MWh for first 5 years After 10 years capital repaid, IGRS drops price by $9.99/MWh

Britannia Landfill Gas Project The gas will be combusted in three Superior Cooper 16 cylinder, 13,200 cubic-inch turbocharged engines rated at 1875 kW each The engines were built in 1986 for landfill gas service and are equipped with hospital grade mufflers This equipment was successfully permitted for operation in the U.S.A. on landfill gas and was imported to Canada for reuse

Beyond 2000: Britannia Hills and Britannia Landfill Site Public Works Region of Peel “To be recognized as the Industry Leader in Public Works”