Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.

Slides:



Advertisements
Similar presentations
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
Advertisements

Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Timing Properties of T0 Detectors At PHOBOS Saba Zuberi, Erik Johnson, Nazim Khan, Frank Wolfs, Wojtek Skulski University of Rochester.
Stephen KahnParticle ID Software Mice Collaboration Meeting Page 1 Particle ID Software Steve Kahn Brookhaven National Lab 27 March 2003.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
1 EMCal design MICE collaboration meeting Fermilab Rikard Sandström.
Scintillation Detectors
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Construct two layers of hadron calorimeter and test Makoto Harada High Energy Physics Laboratory Faculty of Physics Department of Science Shinshu University.
GlueX Particle Identification Ryan Mitchell Indiana University Detector Review, October 2004.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
May 31, 2008 SuperB PID sessionMarko Starič, Ljubljana Marko Starič J. Stefan Institute, Ljubljana Report on hardware tests and MC studies in Ljubljana.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
PHOBOS TOF Construction Status
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Electromagnetic Calorimeter for HADES at SIS100: MAMI and CERN test results Lead-glass modules Tests -  beam at MAMI energy resolution -  - /e - beam.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
ECAL PID1 Particle identification in ECAL Yuri Kharlov, Alexander Artamonov IHEP, Protvino CBM collaboration meeting
RPC upgrade for the HADES Tracking: MDC e -,e + identification with RICH- TOF/PreShower  0.4 GeV/c TOF is not sufficient- Pre-Shower p,  identification.
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Feasibility study of Heavy Flavor tagging with charged kaons in Au-Au Collisions at √s=200 GeV triggered by High Transverse Momentum Electrons. E.Kistenev,
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
TOF Emittance Pion Emittance Measurement with the TOFs? Mark Rayner 11 December 2008.
The Lead Glass Detector Overview, Experience and Direction.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
The Performance of the ALICE experiment for cosmic ray physics B. Alessandro, V. Canoa, A. Fernández, M. Rodríguez, M. Subieta for the ALICE Collaboration.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
Rita Carbone, RICAP 11, Roma 3 26/05/2011 Stand-alone low energy measurements of light nuclei from PAMELA Time-of-Flight system. Rita Carbone INFN Napoli.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.
Prospect of SiPM application to TOF in PANDA
Overview of SuperB Particle identification, and work towards the TDR
FSC status and plans Pavel Semenov IHEP, Protvino
MDT and analog FEE mass production:
IHEP group Shashlyk activity towards TDR
CLAS12 Forward Detector Element PCAL
Chris Smith California Institute of Technology EPS Conference 2003
On behalf of CEPC calorimeter working group
Времяпролетный детектор PANDA
Particle ID Diagnostics in the MICE Beamline
Presentation transcript:

Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005

Purpose of the Forward TOF Particle ID: –π/K separation up to 1.8 GeV/c. Level-1 Trigger: –Fast forward charged track count. Calorimetry: –Tag hadronic showers in the forward calorimeter. Forward TOF Particle ID: 70 ps time resolution 1% momentum and length resolutions

Current Design (and possible improvements) (Not to Scale) 42 bars Scintillators: 252 ×6 × 1.25cm Eljen-200 or Bicron Beam Hole: 12 × 12 cm Hole Photomultiplier Tubes: XP2020 Electronics: Alberta CFD JLab F1TDC fADC Would thicker be better? Is this the best we can do for... timing? fringe field? Need more experience with this (esp. range)...

Outline of Prototyping I: Finished/Ongoing 1.IHEP Test Beams – 2001 to present -- < 80ps resolution is achievable with 200 × 6 × 1.25cm bars -- December 2005 tests will look at 250cm bars IU Cosmic Ray Tests – Spring First measurements were made with a 250 × 6 × 1.25cm bar -- Find 88ps resolution in the center region (2 bars) TRIUMF Beam Test – Summer/Fall Low energy π/μ/e beam used on two layers of scintillators -- Probing time resolution for a variety of dE/dx and all positions -- Discriminator performances

Outline of Prototyping II: 3 Year Plan 1.IU Cosmic Ray Tests – 2006 to Spring Another round of tests with the IU cosmic ray stand ps is not sufficient; look at bar thickness. -- Try a variety of phototubes. -- Use Alberta CFD and commercial CFD and LED. 2.Hall-B Electron/Photon Tests (with LGD) – Fall 2007 Run -- Take the final design to the Hall-B alcove test -- Scan 2 walls of 10 bars each (one full length; one half length). -- Correlate with the LGD and tagger. 3.Magnetic Field Tests (with LGD) – Make sure everything works in the fringe field.

2004 IU Cosmic Rays Summary PMT: XP2020 TDC:LeCroy 2228A (50ps least count) ADC:LeCroy 2249A and IU fADC CFD:Ortec and University of Alberta Scint:250 × 6 × 1.25cm Three movable cosmic ray telescopes in a logical OR. Scintillator is enclosed in a light-tight box (the “coffin”).

2004 IU Cosmic Rays Summary Attenuation Length = ± 4.2 cm Velocity = ± 0.09 cm/ns Time Resolution = 88 ps

2005 TRIUMF Test Beam Summary First two weeks of June and 250 MeV/c π/μ/e beams. Full size and half size scintillators.

Same electronics as cosmic ray tests: PMT: XP2020 TDC: LeCroy 2228A (50ps least count) ADC: LeCroy 2249A and IU fADC CFD: Ortec and University of Alberta Scint: 250 × 6 × 1.25cm 2005 TRIUMF Test Beam Summary

Sample ADC and TDC from one bar end MeV/c π/μ/e beam -- 3 Moyal distribution fit to ADC -- 3 Gaussian distribution fit to TDC e+e+ e+e+ μ+μ+ μ+μ+ π+π+ π+π+

2005 TRIUMF Test Beam Summary Four scans along a front bar. Mean ADC from the two bar ends are superimposed. Attenuation Length = ± 3.4 cm pion muon electron

2005 TRIUMF Test Beam Summary Anomalies in ADC vs TDC Good e+e+ μ+μ+ π+π+ Severe time-walk for electron e+e+ e+e+ e+e+ μ+μ+ μ+μ+ μ+μ+ π+π+ π+π+ π+π+ Double-peak electron Double-peak muon -- Similar behavior for both Alberta and Ortec CFD. -- Needs further analysis. -- Need more tests with different discriminators.

2005 TRIUMF Test Beam Summary π/e separation μ/e separation π/μ separation Four scans along a front bar. TDC differences from the two ends are superimposed. Very consistent run to run results. Nonlinearities are likely due to ADC vs TDC anomalies. Very Important. Needs to be investigated further.

Three Outstanding Design Issues 1.The 88ps resolution for the 252 × 6 × 1.25cm bars is not acceptable. Try doubling the bar thickness. 2.Understand the discriminator issues. Try out a few commercial models (CFD and LED). 3.Explore different phototube options. Can we find something better than the XP2020 for timing and performance in a magnetic field?

Phase I Prototype (2006): Cosmics PLAN: Use the existing IU cosmic ray test stand to explore: -- bar thickness -- discriminators -- phototubes BUDGET: Phototubes: 12k ( e.g. Hamamatsu R9779, Hamamatsu R2083, Hamamatsu R1828, Electron D744, Photek PMT340) Discriminators: 12k (e.g. Ortec 935, Phillips 7106, 708, 710, 715, 730) 2006 Request = 24k

Phase II Prototype (2007): Test Beam PLAN: Test 2 walls of 10 scintillators each (one long horizontal wall and one short vertical wall) in November 2007 along with the LGD. -- use electrons and photons from Hall-B -- scan bars for time and position resolutions. -- correlate the timing with the LGD and the tagger. BUDGET: Phototubes: 18k (instrument 20 bars with XP2020) Scintillators: 5k High Voltage: 25k Cables: 5k Supplies: 6k 2007 Request = 59k

Phase III Prototype (2008): Magnet PLAN: Test the prototype in the magnet fringe field. BUDGET: No new money anticiptated Request = 83k