Clara Gaspar, November 2012 Experiment Control System LS1 Plans…

Slides:



Advertisements
Similar presentations
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Advertisements

ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
L. Granado Cardoso, F. Varela, N. Neufeld, C. Gaspar, C. Haen, CERN, Geneva, Switzerland D. Galli, INFN, Bologna, Italy ICALEPCS, October 2011.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
The PC The PC is a standard computing platform, built around a EISA bus (1988) –IBM compatible –“Intel Architecture” from Intel or AMD or other companies.
ITE 1 Chapter 5. Chapter 5 is a Large Chapter It has a great deal of useful information about operating systems. You will find this VERY helpful when.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
(Preliminary) Results of Evaluation of the CCT SB110 Peter Chochula and Svetozár Kapusta 1 1 Comenius University, Bratislava.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Responsibilities & Planning DCS WS L.Jirdén.
* Critical in the sense of fast intervention SIEMENS – CERN EN/ICE annual meeting Nuremberg, December the 13 th 2012 Industrial Controls Engineering Department.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Overview of PVSS 3.6 Oliver Holme IT-CO. 16/11/2006JCOP Project Team Meeting New features in 3.6 New Installer for PVSS on Windows New Qt User Interface.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Systec CAN-USB Box ― Overview and Status JCOP Team Meeting 2 November 2006 Beat Jost/Cern-PH.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
Infrastructure availability and Hardware changes Slides prepared by Niko Neufeld Presented by Rainer Schwemmer for the Online administrators.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Windows Terminal Services for Remote PVSS Access Peter Chochula ALICE DCS Workshop 21 June 2004 Colmar.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Explain the purpose of Microsoft virtualization. Objective Course Weight 2%
Clara Gaspar, February 2010 DIM A Portable, Light Weight Package for Information Publishing, Data Transfer and Inter-process Communication.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
CERN IT Department CH-1211 Genève 23 Switzerland M.Schröder, Hepix Vancouver 2011 OCS Inventory at CERN Matthias Schröder (IT-OIS)
XNAT 1.7: Getting Started 6 June, Introduction In this presentation we’ll discuss:  Features and functions in XNAT 1.7  Requirements  Installing.
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
Combining safety and conventional interfaces for interlock PLCs
The Post Windows Operating System
of the Upgraded LHCb Readout System
PVSS an industrial tool for slow control
ICE UPGRADE PLAN Philippe Gayet on behalf of EN-ICE.
CMS DCS: WinCC OA Installation Strategy
Institute of Nuclear Physics Polish Academy of Sciences
PVSS Evolution in Relation to Databases
CV PVSS project architecture
JCOP Workshop November 2015
G.Thomas & D.Davids (CERN) & O.Holme (ETH Zurich)
WinCC-OA Upgrades in LHCb.
CMS Operational Experience
TRT DCS status and LS1 plans
The LHCb Run Control System
Presentation transcript:

Clara Gaspar, November 2012 Experiment Control System LS1 Plans…

Clara Gaspar, November 2012 ECS Infrastructure ❚ Current Control PCs are old, so: ❙ New, more powerful machines ❘ Virtual machines x group projects ❙ New Operating Systems: ❘ Windows 2008S-R2 64 bits only ❘ Linux SLC6 64 bits only ❙ New WinCC-OA 3.11 ❘ No more PVSS… ➨ Need to “move” and “upgrade” ALL PVSS projects 2

Clara Gaspar, November 2012 ECS Interfaces ❚ Effects on Hardware Interfaces ❙ PCI slots no longer available ❘ SPECS -> New ethernet based SPECS (coming…) ❘ Peak CAN Interface -> ? ❙ Virtual Machines -> no direct HW connections ❘ Systec CAN-USB (direct USB cables) -> New box USB to ethernet (under discussion) ❘ Ethernet: Ok ❙ Other Hardware? 3

Clara Gaspar, November 2012 New SPECS 4 Fan Sub Detector Master cards Master Ports New Modules ECAL6222 HCAL271 PRS4101 IT261 TT241 OT6242 VELO22 1 TPU11 RICH14141 RICH25192 Total ❚ Preliminary… ❚ Run Specs Server in CCPC ❚ PVSS Project in Control PC

Clara Gaspar, November 2012 Ethernet to USB 5 ❚ Simplified block diagram - Preliminary… ❚ Use PVSS “Scattered” Systems: ❚ Run OPC Server & PVSS OPC Client in each CCPC ❚ PVSS Project away on Control PC

Clara Gaspar, November 2012 ECS Interfaces ❚ Effects on Hardware Interfaces ❙ In general for HW access from virtual machines: ❙ Separate the HW access & the supervisory layer ➨ By making more use of scattered projects / distributed DIM Servers… ❙ Software: New 64 bit OSs: ❘ New drivers (SPECS, Systec) ❘ New OPC Servers: 〡 CAEN, WIENER, ISEG, ELMB ➨ Working versions exist 6

Clara Gaspar, November 2012 WinCC-OA 3.11 ❚ Siemens Strategy: ❙ Base all their SCADA products on the PVSS core (i.e. Event Manager,Data Manager, etc.) ❘ Simatic WinCC (Their old product) ❘ Simatic WinCC Open Architecture (old PVSS) ❚ Implications: ❙ Installation directory changes ❙ Manager names change ❘ WCCILpmon, WCCILevent, etc. ❘ WCCOActrl, WCCOAui, etc. 7

Clara Gaspar, November 2012 WinCC-OA 3.11 ❚ Implications (continued): ❙ New JCOP framework: ❘ All CERN managers re-built: 〡 WCCOAdim, WCCOAdip, WCCOAsmi, etc. ❙ Luckily stay the same: ❘ The Project directory structure ❘ All functions used in Ctrl scripts and User Interfaces ❘ The C++ API for managers and ctrl extensions ❙ In general: everything still works! (and we can mix projects of different versions) 8

Clara Gaspar, November 2012 WinCC-OA 3.11 ❚ Improvements ❙ Several, reported here: ❘ w_0212_3_11_e.asp&sid=&seite_id= w_0212_3_11_e.asp&sid=&seite_id ❘ They claim better performance… ❘ Otherwise I found nothing really useful for us… ❚ But we need to install it: ❙ Because we need the support for the new PCs, operating systems, 64 bits, etc. 9

Clara Gaspar, November 2012 Migration Strategy ❚ Procedure (draft): ❙ Keep the old PCs up. ❙ Copy project to new machine ❙ “Upgrade” Project ❙ Test project ➨ We will try to create tools to ease the procedure and of course document the exact detailed procedure to follow. 10 To be done by Sub- system Teams

Clara Gaspar, November 2012 Migration Strategy (detail) ❚ Current plan: ❙ Old PCs will be renamed  prefix with “old” ❘ Ex.: r2dcs02w (running Windows 2003 SP2, PVSS 3.8 SP2)  r2dcs02w (running Windows 2008 SP2, WinCC 3.11)  old PC will be kept as oldr2dcs02w ❘ Auto-start of DIM and PVSS will be disabled ❙ New PC with the same name and new OS prepared ❘ New WinCC installed, all configurations, privileges etc. ported over (to the extent possible) ❘ Projects will also be copied over ❙ New and old computers can run in parallel, but the WinCC projects and some DIM stuff can not! ❘ This allows manual going forth and back in case there is a need to check 11

Clara Gaspar, November 2012 Migration Strategy ❚ “Details” to be sorted out: ❙ “PVSS” Archive ❘ WinCC-OA 3.11 needs a new schema version (Once upgraded old project can not use archive anymore) ➨ Clone archive? ❙ Project Upgrade x Project Recreation ❘ Projects seem to “age” (get heavier and slower) ➨ Create new ones and (ascii) import all dps? ❙ Projects in PCs with HW (Specs for ex.) ❘ If HW replacement not available yet ➨ Leave DIM/OPC Server there, migrate project 12

Clara Gaspar, November 2012 Manpower & Responsibility ❚ Each sub-system: ❙ Is responsible for upgrading and testing their projects (there will be docs and tools) ❙ Should give us their preferred schedule, so that we can give support… ❙ Can give us comments and requests for (central) improvements, we are open… ❙ Can discuss with us all other upgrades in their sub-systems, we would like to help… 13

Clara Gaspar, November 2012 Conclusion ❚ No PVSS projects after LS1… ❚ We need your collaboration… 14