TIPP Conference, June 10, 2011 1 Mechanics and Assembly of the Silicon Vertex Detector for PHENIX Walter Sondheim - LANL Mechanical Project Engineer; VTX.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
1 The Forward Silicon Vertex Detector Upgrade for the PHENIX Experiment at RHIC Douglas Fields University of New Mexico Feb. 12, 2011 Douglas Fields, WWND11,
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
PHENIX FVTX Status of Mechanical and Thermal Design Work Eric Ponslet, Shahriar Setoodeh, Roger Smith HYTEC Inc. Los Alamos, NM May 2, 2007.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
PHENIX FVTX Status of Mechanical and Thermal Design Work Eric Ponslet, Shahriar Setoodeh, Roger Smith HYTEC Inc. FVTX Collaboration Meeting Albuquerque,
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
The PHENIX Forward Silicon Vertex Tracker Eric J. Mannel IEEE NSS/MIC October 29, 2013.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
Robert Pak DOE Review Jan. 19, Robert Pak 1 DOE Review Jan. 19, 2005 VTX HBD PHENIX Central Region From VTX Proposal (dims in mm) Integrate Detector.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
Stave Tooling & Plans for Future Stave-building (Tim)
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Evidence for Strongly Interacting Opaque Plasma
Micro Vertex Detector of PANDA Strip Detector
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
WP9 ITS Mechanics and Cooling
Simulated vertex precision
Vertex Detector Mechanical R&D Design Questions and Issues
WG4 – Progress report R. Santoro and A. Tauro.
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

TIPP Conference, June 10, Mechanics and Assembly of the Silicon Vertex Detector for PHENIX Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX Detectors

PHENIX Experiment at RHIC: The PHENIX experiment at RHIC is now in its 11 th year of data taking. Experimental configuration for RUN in 2012: TIPP Conference, June 10, central arms; electrons, photons, hadrons2 muon-spectrometer arms; muons Vertex Region* * VTX installed for current run cycle, FVTX next year’s run cycle

PHENIX Experiment at RHIC: TIPP Conference, June 10, Available space for Vertex Detector mm between the Central Magnet pole tips along the beam axis. The original 3.0 inch diameter Beryllium beam pipe was replaced with a inch ID x.020 wall NEG coated Beryllium beam pipe, now installed for this run cycle mm

VTX Design Criteria: TIPP Conference, June 10, VTX - Barrel Detector: –2 pixel sensor layers at a radius = 25.0 and 50.0 mm Fine granularity, low occupancy –50µm x 450µm pixel size, ALICE LHCB1 read-out chip –AC Coupled read-out, required coolant 10  F »To prevent de-lamination –2 stripixel layers at a radius = and mm Unique sensor design from BNL Instrumentation –80µm x 1000µm pixel pitch, SVX4 read-out chip –DC Coupled read-out, required 0  F, »Avoid increase leakage current from radiation damage –  acceptance ~ 2  –|  | acceptance < 1.2 –Dimensional structural stability to 25  m Φ1000mm 440mm Φ548mm 800. mm

VTX - Pixel layers 1 and 2: TIPP Conference, June 10, PEEK mounting block Omega shaped cooling tube;.504 mm thick, M55J, 8 ply.063 ply thickness Thermal plane; 16.1 x x.381 mm, M55J Graphite Cyanate Ester, 6 ply.063 ply thickness Ground wire Bonding agent HYSOL EA9394 PEEK hose barb Assembled pixel stave: stave + sensors + readout chips + bus, readout is split in half – left bus and a right bus Sensor 10cm Bus Extender Total < 60cm (70cm) Assembled pixel stave with bus extender attached, interface with SPIRO readout card Closest sensors to beampipe, radiation length should be kept to a minimum –Stave design uses Carbon composite technology, Omega shaped bonded to backside of thermal plane to create cooling channel. Bonded assembly must meet mechanical tolerance for flatness of 100. microns prior to bonding of sensor modules –Layers 1 & 2; 4 sensor modules per ladder, Layer ladders layer ladders per half barrel

Improve track segment construction –BNL sensor design provides 2 dimensional, single sided readout –Readout uses FNAL’s SVX4 chip; 128 channels per chip, 340K channels for layers 3 & 4 –Layer 3; 5 sensor modules per ladder, 8 ladder assemblies per half barrel –Layer 4; 6 sensor modules per ladder, 12 ladder assemblies per half barrel TIPP Conference, June 10, VTX - Stripixel layers 3 and 4: SVX4 chips Readout bus Sensors Layer 4 stave with sensor modules being located on stave using vacuum tooling, prior to bonding Interconnection between top layer and bus layer using PariPoser material Sensor Module

Stripixel stave construction: TIPP Conference, June 10, Layer 3 & 4 stave assembly: designed to allow for individual electronic modules and bus to be mechanically attached to stave backside – not bonded. Face Sheets; K13D2U with EX1515 Cyanate Ester resin,.408mm thick, 6 ply layup,.063 ply thickness. Size for layer 3 – x 36.1 mm, layer 4 – x 36.1 mm* Carbon Foam Core; Allcomp K3, 4.2mm thick PEEK pieces Aluminum end-block, grounds cooling tube Aluminum rectangular cooling tube; 3.18 x 6.35 x.38 wall (mm) Bonding agent HYSOL EA9396 *Layer 3 stave shown in exploded view, assembly flatness tolerance 100. microns

Cross section Temperature profile, layer 4 ladder Surface temperature, layer 4 ladder Thermal/Mechanical analysis: Thermal load for pixel stave is watts Each ladder’s mass summary: –Structure/Si-detector/Readout chips 16.4 grams –Coolant: 6.5 grams (3M-NOVEC 7200) –Total:23.0 grams –  :11.5  C* 23.  C with a tube –Gravity sag < 2. microns –Pressure tested TIPP Conference, June 10, *Calculations using Nastran- Mat9 software Design goal to keep DC coupled sensors at 0  C: Coolant wall temperature at -6  C Peak temperature 3.2  C Temperature rise between coolant and sensor 5.55  C Pixel stave analysis Stripixel stave analysis

Space-frame and Barrel Mounts, exploded view: TIPP Conference, June 10, Pixel layer 1 & 2 barrel mounts, M55J and Allcomp K3 Carbon foam, 3.6mm thick panel assembly Stripixel layer 3 & 4 barrel mounts, M55J and Allcomp K3 Carbon foam, 6.3mm thick panel assembly Main beam (2), POCO Graphite, extension attaches FVTX detector Center gussets CN60 cloth, 2.mm thick Space frame shell, CN60 cloth with EX1515 resin, 1.5mm thick Space-frame flexure, 1 of 3 on each half

Space-frame component fabrication and assembly: TIPP Conference, June 10, Space-frame shell: Vacuum jig machining cut-outs Layer 4 barrel mount on assembly jig Space-frame shell tooling Layer 2 barrel mount on assembly jig All work at LBNL Composite Shop

FVTX detector: Silicon tracking in the forward regions of PHENIX; –1.2 < |  | < 2.4 –  acceptance = 2  Each FVTX assembly; –4 tracking stations (Disks) Silicon mini-strips, 2.8 – 11.2mm 75. micron pitch (radial direction) FPHX readout chip (FNAL design) ~1.1M channels of readout TIPP Conference, June 10, FVTX detector exploded view from VTX assembly

FVTX Station Disks: TIPP Conference, June 10, View of a Station Disk assembly with large Wedges attached to both sides Each Wedge covers 15 degrees, each sensor covers 7.5 degrees, Wedges on both sides of Disk staggered by 7.5 degrees front to back – hermetic coverage in phi Each disk assembly is pressure tested to 30. psi, cycled 5 times The disk assembly bonding agent was Hysol EA9396

Large Wedge construction: TIPP Conference, June 10, Silicon sensor, 320. microns HDI, 334. microns Carbon back- plane, 1.56 mm, K13D2U with EX1515 resin Spacers – POCO graphite, AXM5Q, 2 versions of each low and high profile Hirose DF18 series connector, 100 pin for large and 60 pin for small Hirose H.FL series mini-coax for bias Separate ground connection point for Carbon Each wedge assembly is mounted to a station disk by 2 #2 screws and 2 locating pins FPHX read-out-chips, 13 on each side of sensor, 128 channels each, 410. microwatts per channel, 1.36 watts/wedge

Large Wedge analysis: TIPP Conference, June 10, ° 16.5° 12° 410 µW/Channel Base Temperature 13.53° C Thermal path for heat generated on large Wedge Delta T on large Wedge is ~7.47 degrees C Heat from FPHX chips passes through HDI into Carbon backplane – through POCO graphite thermal block to Station Disk where coolant flows around perimeter – NOVEC 7200 coolant Delta T from Disk to Wedge ~ 8. degrees C In analysis a temp constraint was set to keep peak FPHX chip temp at 21 degrees C Bonding of all elements of Wedge assembly, made using Arclad 7876 transfer adhesive, 50. micron thick

Station Disk construction, Stations 2, 3 & 4 Large Disk: TIPP Conference, June 10, K13C2U uni-fiber face sheets,.40mm thick Carbon loaded PEEK pieces Mounting tab to Cage, one of three 3 holes for alignment flags around perimeter Polyimide “bobbins” Hardware to mount and align Wedges to Disk Carbon loaded PEEK cooling channel R=182.0mm

FVTX construction: TIPP Conference, June 10, FVTX cages and station disks being fabricated, tested and assembled at the LBNL composite shop.

Metrology, FVTX wedge disk: TIPP Conference, June 10, One of micron cross-hair targets on Silicon wedge sensor used to verify relationship of sensors on a disk to <10. microns

Metrology, Half VTX assembly: TIPP Conference, June 10, Half VTX assembly being optically surveyed: all ladders to global monuments in assembly. These will again be surveyed in relationship to monuments in the PHENIX hall. Expected detector positioning will be known to ~50. microns in the hall.

CAD vs. As-Built: TIPP Conference, June 10, Demonstration of importance of constructing an accurate CAD model of experimental assemblies, installation of VTX proceeded just as modeled.

VTX & FVTX collaboration institutions: Brookhaven National Laboratory Columbia University Ecole-Polytechnique Iowa State University Kyoto University Los Alamos National Laboratory New Mexico State University Oak Ridge National Laboratory RIKEN Riken-Brookhaven Research Center Stony Brook University University of New Mexico TIPP Conference, June 10,