1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.

Slides:



Advertisements
Similar presentations
TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
Advertisements

Ray Lundquist, NASA GSFC
James Webb Space Telescope Optical Telescope Element (OTE) Mirror Coatings Ritva. A. Keski-Kuha, Charles W. Bowers, Manuel A. Quijada NASA/Goddard Space.
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
The James Webb Space Telescope Knox Long STScI. JWST – Successor to HST Introduction Webb Science Webb Hardware Summary.
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
ISIM Integration & Test Mike Drury JWST-PRES
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
KU Leuven MIRI team meeting
James Webb Space Telescope Update Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate.
Twenty years ago IRAS gave us what is still our best view of the mid  infrared sky.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Constellation Orion Visible Light Constellation Orion Infrared Light.
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
Mark Clampin Observatory Project Scientist Goddard Space Flight Center 217 th American Astronomical Society Meeting JWST Telescope Optics: Progress Report.
Hubble Fellows April 21, 2006Peter Stockman, STScI James Webb Space Telescope © David A. Hardy/
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
Hubble Science Briefing Delivering JWST Science, from Exoplanets to First Light: The Near-InfraRed Imager and Slitless Spectrograph (NIRISS) March 6, 2014.
James Webb Space Telescope Integrated Science Instrument Module Status Jamie Dunn JWST/ISIM Manager JWST Partner’s Workshop May 19, 2009 JWST-PRES
NIRCam ETU Testing at LMATC, Palo Alto Kailash C. Sahu.
Page 1 JWST Project Status AAAC, October 12, 2005 John C. Mather JWST Senior Project Scientist NASA GSFC.
The Integrated Science Instrument Module Ground Test Matt Greenhouse ISIM Project Scientist NASA Goddard Space Flight Center 23 July 2010.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
European Extremely Large Telescope - Status April ESO.
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
1 JWST Multi-Mega FE Model Studies Terry Fan/Swales Aerospace Mark McGinnis/Swales Aerospace Glenn Grassi/MSC.Software John Johnston, PH. D./GSFC May 4.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
James Webb Space Telescope (JWST) Project Status for the AAS Town Hall Phil Sabelhaus JWST Program Manager January 5, 2010.
1 Massimo Stiavelli Space Telescope Science Institute Studying the First Galaxies with the Hubble and the Webb Space Telescopes Hubble Science Briefing.
AAAC Presentation JWST Status Eric P. Smith JWST Program Scientist.
Hubble Science Briefing
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Telescopes Key Words Optical Telescopes: make use of electromagnetic radiation in the range of visible light Refraction Telescopes: use lenses Reflecting.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
Kailash C. Sahu NIRCam: Status Update 1m Cold, space-facing side
High resolution magnetoresistive position sensor for the JWST Tobias Junginger.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Seeing the First Light The James Webb Space Telescope Amber N. Straughn Lead Scientist for JWST E/PO Paul Geithner JWST Observatory Manager jwst.nasa.gov.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Hubble Science Briefing
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 Using In-situ Cryogenic Radiometers to Measure the Performance of a Large Thermal Vacuum Chamber Michael DiPirro 1, Edgar Canavan 1, James Tuttle 1,
The INS NIRCam Team.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Hubble Space Telescope By Brittany Bellows Physics 1040 – Spring 2011.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Deploying JWST Bob Giampaoli JWST Chief Systems Engineer Northrop Grumman.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Capitalization style for Presentation Title is “Title Case”
James Webb Space Telescope
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Systems Engineering Management
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
James Webb Space Telescope
Presentation transcript:

1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011

2 JWST Architecture is Driven by Science JWST sees in the infrared because that is where the science is Large telescope optics collect and focus light Telescope and Scientific Instruments are cold for sensitivity Sunshield allows the telescope and instruments to get cold JWST is lightweight and deployable so it can be launched economically L2 is an ideal place for an infrared observatory

3 JWST Design

4 4 Launch Segment Launch Vehicle Payload Adapter Launch Site Services Ariane Launcher Provided by NASA Provided by NG Provided by Space Telescope Science Institute (STScI) Provided by ESA Provided by CSA The Whole JWST System Ground Segment Science and Operations Center (SOC) Common Systems Institutional Systems Deep Space Network Space Telescope Science Institute Observatory Segment Optical Telescope Element (OTE) Spacecraft Element (SE) Spacecraft Bus Integrated Science Instrument Module (ISIM) JWST Observatory NIRCamNIRSpecFGS MIRI Sunshield OTE + ISIM (OTIS)

5 Primary Mirror Segments  All 18 flight primary mirror segments and one spare have been fully assembled  10 of 18 flight primary mirrors are through final polish, 8 through coating  Completed vibration acceptance testing on 5 of 18 flight mirrors  6 coated mirrors are being prepared for final cryo-optical verification Mirror Assembly at Ball Coated Primary Mirror at QCI Preparation for Shipment to XRCF Inspection at Tinsley

6 Primary Mirror Testing  Completed cryo deformation testing of all flight mirrors (XRCF tests 1-5)  First of three final cryo verification tests starts this April (XRCF tests 6-8) Element Progress

7 Secondary Mirror Assembly  Flight Secondary Mirror is through cryogenic deformation testing and is currently in final polishing Element Progress

8 Telescope Structure Mirror Backplane Pathfinder complete – To be delivered to NGAS 3/11 Flight Deployable Tower Assembly Under construction Flight Secondary Mirror Support Struts fabrication complete Element Progress

9 Telescope Assembly Tooling Page 9 Critical early demonstration of the primary mirror segment assembly (PMSA) installation process Simulated Primary Mirror Segment Element Progress

10 U.S. Science Instrument (NIRCam) Shortwave Camera Lens First Fold Mirrors in Cryo Test Flight Long Wave Filter Wheel Element Progress Engineering Test Unit

11 European Space Agency (ESA) Science Instruments (NIRSpec & MIRI) Page 11 Flight Mid-Infrared Imager (MIRI; ESA) Element Progress Flight Near-Infrared Spectrograph (NIRSpec; ESA) Element Progress

12 Canadian Space Agency (CSA) Science Instrument (FGS/TF) Page 12 Flight Fine Guidance Sensor/Tunable Filter Element Progress

13 Integrated Science Instrument Module (ISIM) Page 13 ISIM preparing for cryogenic testing Element Progress The ISIM holds the science instruments and also provides common services such a power and thermal control

14 Telescope Testing Chamber at Johnson Space Center 14 Largest simulation of deep space ever attempted will be done here Notice people for scale Telescope and science instruments installed in the test chamber Element Progress

15 Primary Mirror Segments 15 Program Phases Today Concept DevelopmentDesign, Fabrication, Assembly and Test Formulation Authorization Preliminary Design Review (PDR) / Non-Advocate Review (NAR) (Program Commitment) Launch Commissioning / science operations... Initial Confirmation Review (ICR) Phase A Phase B Phase C/D Phase E Formulation Implementation … Technical Non-Advocate Review (T-NAR) Critical Design Review (CDR) Backplane Center Sections – PF and Flight

16 JWST is well into development. Much of the flight hardware and the critical tooling and facilities needed to assemble and test it have been built or are being built. JWST’s cost has grown and its development schedule has slipped since 2008 when NASA made cost and schedule commitments to Congress. An independent review was conducted in 2010, and in response some organizational changes have been made and remaining development is being replanned, but work to go is clear and progress continues. Program Status

17 The JWST team has made much progress and the JWST system is coming together Final design and construction of flight hardware and critical tooling and facilities is nearing completion Summary

18 JWST is Awesome!