MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

RF Specification discussion MICE RF workshop 16 th April 2012.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
RF Cavity / Coupling Coil Module
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Resource Loaded Schedule and Budget Profile
Completion of the MICE-US construction project
Overview of the RFCC Module and 201-MHz Cavity Design
MICE CM31 Schedule summary
Presentation transcript:

MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1

MICE Step VI 2MICE Project Board - March 8, 2012 Alan Bross

RF Cavities for MICE 3MICE Project Board - March 8, 2012 Alan Bross X 2

A Review: 201 MHz Cavity Test Treating NCRF cavities with SCRF processes The 201 MHz Cavity – Achieved 21 MV/m – Design gradient – 16MV/m – At 0.75T reached MV/m However, No observed damage! 4MICE Project Board - March 8, 2012 Alan Bross

MICE Prototype Cavity Conditioning It didn’t 5MICE Project Board - March 8, 2012 Alan Bross Design Gradient

201 MHz Cavity Running Limited by RF Power Page 6MICE Project Board - March 8, 2012 Alan Bross

201 MHz Prototype Spark damage -None Note: Stored energy available to sparks  100J (100X that of 805) Page 7MICE Project Board - March 8, 2012 Alan Bross

Coupler Ceramic Cu migration Page 8MICE Project Board - March 8, 2012 Alan Bross TiN Coated Ceramic

Production Cavity Status  Ten RF cavities (two spares) at LBNL now  All 11 beryllium windows received at LBNL  Ten ceramic RF windows  Six tuner flexures are being fabricated at Fermilab (DONE)  Components for 6 actuators are being fabricated  RF loop coupler design has been updated to eliminate the gap between the outer coax and the RF loop & clearance issues to the body port  Fabrication of fixturing complete  Preparation of the cavity surface: mechanical smoothing  EP preparation in progress at LBNL  Delays due to safety review  EP to start after the ES & H approval.  Measurements of the remaining six cavities to start after EP;  Each cavity will be tuned to a center frequency after EP. 9 MICE Project Board - March 8, 2012 Alan Bross

RF – Single Cavity System Test (SCTS) For tests in the MTA 10 On track for start of assembling this system in May MICE Project Board - March 8, 2012 Alan Bross  Vacuum vessel delivered  Tuners complete  Actuators in production  New couplers due – early May

SCTS Check engineering and mechanical design – Fully define the fabrication process – Incorporate any design changes into the RFCC vacuum vessel design Test of the RF tuning system with 6 tuners and actuators on a cavity and verify the frequency tuning range Obtain hands-on experience on assembly and procedures 11MICE Project Board - March 8, 2012 Alan Bross

SCTS II Cavity installation – Develop fixturing for inserting the cavities into the vacuum vessel – Beryllium windows – RF couplers and connections – Water cooling pipe connections – Vacuum port and connections – Tuners and actuator circuit – Mounting and alignment of the tuners onto the cavity is critical to alignment of the cavity in the vacuum vessel – Alignment of actuator (through the vacuum vessel wall) to the tuner is important 12MICE Project Board - March 8, 2012 Alan Bross

SCTS III Aligning cavity with hexapod support struts – Test developed MathCAD alignment software program Vacuum vessel support and handling Verify operation of the getter vacuum system Investigate RF processing of MICE cavities Test with RF power – Explore max stable operating regime – Test MICE RF power delivery components (waveguides, etc). – Can test operation at LN 2 temperature 13MICE Project Board - March 8, 2012 Alan Bross

MICE RFCC lite Test in MTA MICE Project Board - March 8, 2012 Alan Bross14

MICE RF Power Systems MICE Project Board - March 8, 2012 Alan Bross 15

RF system components Andrew Moss 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module LBNLCERN 300 kW Amplifier HT Supplies Daresbury DL Test System At present Auxiliary Systems Not found

Test system at Daresbury Andrew Moss

Amplifier status Refurbishment of LBNL and CERN RF components: –First medium power (250 kW) amplifier and power supply system tested 2008 –Refurbishment and rebuild of first high power (2 MW) amplifier complete October 2009 –Power supplies for first 2 MW amp operational –Two further 300 kW amplifiers awaiting repair –Two refurbished 2 MW CERN amplifiers partly tested, awaiting assembly and high power test Need to build 3 more sets of power supplies One more 300kW amplifier to buy/acquire Andrew Moss

RF Power Distribution 19MICE Project Board - March 8, 2012 Alan Bross

Status/Plan of RF Power System Amplifier test system tested to 1 MW with power supplies; Coax system designed to phase match RF into each cavity, all coax lines are the same length and have the same number of elbows; Hybrids will be used to split RF power and give good isolation, reject load can be small as balanced reflected; power will be directed back to triode, this should not present an issue; Cavity phasing can be done using a combination of LLRF and limited range high power phase shifters; Nitrogen gas pressure will be used to extend the peak voltage stand off of the coax guides. 20MICE Project Board - March 8, 2012 Alan Bross

External RF Review Panel Report Tube lifetime is around 15,000 hours on ISIS at 50 Hz ~ 4MW – MICE will run at 1Hz and 2MW so lifetime should be extended Power output will degrade over time to around 50% of initial level, therefore the effective cavity gradient will also degrade over time Currently no spare tubes – Option to purchase 2 more TH116 tubes, however there will be no more, production of glass assemblies has ended – ISIS tubes are removed from service at power level of ~1MW Amplifiers will be difficult to maintain behind shield wall – Layout changes suggested to allow access to work on systems 4616 amplifier currently appears above shield wall and may see some magnetic field – no information found on what level is acceptable from manufactures or other lab experiments, however as the tube has a very small electron drift gap – Not that concerned at the moment, will have to fix what goes wrong in the hall. Power supplies include many transformers, circuit breakers, PLCs and many other magnetic components 21MICE Project Board - March 8, 2012 Alan Bross

Cavity Filling Issue Using a slow fill approach, the forward power is switched on in a ramped way to reduce reflected power effect Can reduce reflected power to a tenth of forward wave Example from FNAL Using digital LLRF this is simple to achieve Nitrogen will be used in the coax guides – SF 6 also option, used routinely in MTA 22MICE Project Board - March 8, 2012 Alan Bross

RF Power System - Summary RF testing to 2MW will be done before August, 2012 RF review has prompted a new round of optimisation of coax distribution that looks to make things easier in a number of areas, space around the amplifiers, lower transmission loss, easier to install Coax should be filled with N2, slow cavity filling will be needed to avoid breakdown inside the guides, RF tests at the MTA are required to prove this as an acceptable design RF specification is being refined and needs to be approved Discussions about LLRF control/experiment timing need to be understood and build a team to look at solutions 23MICE Project Board - March 8, 2012 Alan Bross

Moving Towards MICE Step VI MICE Project Board - March 8, 2012 Alan Bross 24

Towards Step VI The following schedule is not resource loaded [So you know what quality factory to apply], but is based on detailed estimates from Fermilab’s Technical Division (for coil tests), Qi Huan Company (parts fab & coil winding), Meyer Tool (cryostat assembly & vacuum test) and MICE’s current understanding of our technical progress. – I have added a 30% float to the Fermilab work on testing/training the windings – Final CC magnet assembly time is based on a preliminary estimate by Vladimir Kashikhin I have requested that Fermilab PPD-TD make a first pass at a detailed estimate No commitment from Fermilab to do this job at this moment – I have used the latest input from Derun Li and Steve Virostek regarding fabrication times at Qi Huan and HIT and logistics in China & between China and the US – This plan also assumes that a second Coupling Coil magnet assembly area/team is operational (Currently under discussion with interested parties) which adds flexibility w/r to manpower availability And given the modular nature of the coupling coil magnet (next talk), distributing the assembly work is possible. In addition it does not include details of installation and commissioning of the RF power system at RAL It does not include all components (& how all is funded), but it presents a first draft at developing a full plan to meet the MICE target date of 2016 for starting Step VI 25MICE Project Board - March 8, 2012 Alan Bross

26MICE Project Board - March 8, 2012 Alan Bross

27MICE Project Board - March 8, 2012 Alan Bross

MICE Step VI Schedule uncertainties Coupling coils constitute the major schedule driver – Tests results from first winding crucial Release Qi Huan to produce more – Releasing drawings for fabrication However: – The RF power system installation is a very large task and stresses MICE resource availability Particularly in the UK (start of installation interleaved with Step IV running) – The availability of UK funding for the last AFC and LH 2 system is at present uncertain – FY13 funding in the US at the moment looks “dire” 28MICE Project Board - March 8, 2012 Alan Bross

Conclusions A test of the production MICE RF cavities is on schedule to begin this summer in the MuCool Test Area at Fermilab – This will test all aspects of MICE cavity operation and can test at gradients much higher than will be seen in MICE Although not in the final B field configuration Preparations are well along to have a new test facility (Solenoid Test Facility) ready to begin testing the first MICE CC winding this summer at Fermilab We have a preliminary estimate for fabrication of the CC cryostats and expect to be able to begin their procurement process this FY(US) This first detailed look at large parts of the Step VI schedule lends credibility to our Target 2016 start within the caveats as indicated 29MICE Project Board - March 8, 2012 Alan Bross