Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.

Slides:



Advertisements
Similar presentations
The Lone Star College System 13 Locations spread across 1,400 square miles 5 Colleges 2 University Centers 5 Centers System Office & Training Center 4,800.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Building Codes, Zoning Ordinances
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PRESENTATION ON TURNKEY CONSTRUCTION.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
The Must-See event for the World of Architecture and Construction MADE expo is the Italys leading international architecture, building and construction.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
National CAD Standard In a world where globalization is invading and distinction is becoming the rule, We feel the urge to pass some of the knowledge.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.
MasterFormat™ April 7, 2005 Kevin R. Miller.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Capabilities Presentation Please select the button above that best describes your interest to learn more about how Formare Technica, Ltd. can help you.
Chapter 18 Working Drawings.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
MasterFormat™ March 17, 2004 Kevin Miller.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Design Considerations for Telecommunications Pathways and Spaces
Construction Contract Documents
CONSTRUCTION BLUEPRINT READING
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Construction Specifications
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Construction Specifications Foreman’s Development Series
Construction Project Management: Technology driven answers for schedule and budget savings.
Division 17/25 Organizational Model for Technology and Communication Systems “What has changed – What has not” James C. Waddell, RCDD Formare Technica,
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Hands-on Networking Fundamentals
The ANSI/TIA-606B Administration gmail.com Edit December
Construction Drawing Occupational Safety and Fundamentals
Welcome to Lunch & Learn Simplify Your Digital Workflow with Smarter Solutions.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Formats ACT 380.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
UF Telecom Standards Overview ITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
SIGNAMAX CABLING SYSTEM. Signamax Cabling System The Signamax Cabling System Design Principles and Installation Practices are based on the requirements.
A few different things… ID 206 construction + materials II.
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
Chapter 6: Writing the Front Matter and Executive Summary.
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
ETP 1138C Week #2 Advanced print reading basics (Types of Engineering documentation) This week we will cover the following topics in class: We will introduce.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Estimating and Scheduling CEE 492
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
Construction Documents
(Refer to Chapter 2 of the textbook)
What happened to Division 17? and what is CLA?
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The Lone Star College System
FIVE PROJECT PHASES.
Presentation transcript:

Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology

Archi-Technology, LLC Agenda Background Design Process Current Model and History Division 17 “T” Series Drawings New Process Next Steps

Archi-Technology, LLC Background To understand what is “Division 17”, you must first understand: –What is CSI –That there are already Divisions 1-16 –What a Performance Specification consist of –Relationship between the Drawings and the Specifications –Where the Construction Industry is –Where the Telecommunication Industry is

Archi-Technology, LLC Background CSI - Construction Specifications Institute –One of the documents that CSI produces, jointly with CSC - Construction Specifications Canada is the MasterFormat TM –The MasterFormat TM is a master list of numbers and titles for organizing information about construction requirements, products and activities into a standard sequence –The MasterFormat was introduced in 1963 and the current edition is the 1995 edition

Archi-Technology, LLC Background The MasterFormat consist of the following: Front End - Intro, Bid Forms, Conditions, Etc. Division 1 - General Requirements Division 2 - Site Construction Division 3 - Concrete Division 4 - Masonry Division 5 - Metals Division 6 - Woods and Plastics Division 7 - Thermal and Moisture Protection

Archi-Technology, LLC Background Division 8 - Doors and Windows Division 9 - Finishes Division 10 - Specialties Division 11 - Equipment Division 12 - Furnishings Division 13 - Special Construction Division 14 - Conveying Systems Division 15 - Mechanical Division 16 - Electrical

Archi-Technology, LLC Background Architects use this MasterFormat to organize the requirements for a new building or renovation The architect is typically the lead design professional for a project and also manages the Front End and Division 1 requirements Here is how the process works

Archi-Technology, LLC Process First a customer identifies a need Who hires a lead design professional to establish a project scope and budget –typically this is an architect, but does not always need to be The lead design professional then assembles a team of engineers and consultants who work together to create a schematic design and estimate

Archi-Technology, LLC Process Once this Schematic Design (SD) is reviewed, modified as required and approved, which includes being within budget, the design team then begins detailed design efforts The Design Development (DD) is also reviewed, typically at 50% and 90% along with the revised estimates

Archi-Technology, LLC Process These reviews include individuals from the operations and maintenance group(s) The project team prepares the construction documents (CD) and the project is put out to bid Addenda are issued as required to clarify the bid documents Bids are received and the contract(s) is awarded to the successful bidder(s) and Construction begins

Archi-Technology, LLC Process This is typically about the time when it becomes obvious that technology has not been effectively addressed during the design process Resulting in design changes and eventually change orders to the construction contracts and disruptions to the construction timelines and plans All of which are somehow the fault of the “new” technology system requirements

Archi-Technology, LLC Process The main construction project is completed and the contractors turn over the record copy drawings and manuals to the O&M group Meanwhile, the technology systems managers wade through what they were given and often need to continue to rework, enhance or otherwise modify the results As-built drawings usually arrive 3-6 months later as hard copy prints, if at all

Archi-Technology, LLC Process One reason why technology requirements are not included in the main construction project is because: –Technology is not adequately included in the current model used by the Architects to organize the requirements of a building This is illustrated by the fact that technology requirements take up only 2 of the 300 plus pages in the 1995 CSI - Master Format

Archi-Technology, LLC Process Currently, the construction industry places the Technology and Communications requirements at the tail end of Division 16 - Electrical Requirements Not only are 2 pages insufficient, the location fosters the perception that telecommunications industry is a subset of the the electrical industry and therefore also a subcontract

Archi-Technology, LLC Current Model Communications 710 Communication Circuits 720 Telephone and Intercommunication Equipment 740 Communication and Data Processing Equipment 770 Cable Transmission and Reception Equipment 780 Broadcast Transmission and Reception Equipment 790 Microwave Transmission and Reception Equipment

Archi-Technology, LLC Current Model Sound and Video 810 Sound and Video Circuits 820 Sound Reinforcement 830 Broadcast Studio Audio Equipment 840 Broadcast Studio Video Equipment 850 Television Equipment 880 Multimedia Equipment

Archi-Technology, LLC Current Model A second reason that the telecommunication design is not in sync with the formal design process is because there is often a separate RFP for the telecommunication requirements which places the design responsibility on the contractor –who does not start a detailed design process until after winning the bid

Archi-Technology, LLC Why Division 17 This results in construction project designs that go out to bid with little or no coordination for technology –other than a few outlet boxes and conduit stubs –or a note to “ coordinate in field with owner”

Archi-Technology, LLC Why Division 17 These two reasons explain why there is often: –no space allocated in the building for Technology –no money in the capital budget for the required Technology Infrastructure –And typically not much time left to resolve the issues

Archi-Technology, LLC Reasons The reasons for this go back to the FCC break up of Bell System BIC’s Engineers and REA Practices were the resources architects depended on to provide requirements for telephone service inside a building With the break up, the services that these BIC engineers had traditionally provided became the responsibility of the building owners

Archi-Technology, LLC Reasons BICSI was formed to help address this issue Also at this time companies like IBM and AT&T offered proprietary solutions These solution were then superceded by the standards that have evolved and exist today Formal communication with the A/E/C design professionals has typically been limited to a particular system, if at all

Archi-Technology, LLC Impacts of Division 17 Edge of Property to Entrance Facility –Ductbank requirements for multiple access providers –Physical redundancy as well as logical redundancy –Master planning impacts –Private inter-building pathways on a campus –Roof tops are now a leased space

Archi-Technology, LLC Impacts of Division 17 Entrance Facility to Tenant Equipment Room –Increased space requirements to accommodate multiple access providers and service providers –Telecommunication riser rooms in core of building not just slots and sleeves –Associated space and revenue considerations –Affects on leasing, marketing and tenant retention - “The Wired Building”

Archi-Technology, LLC Impacts of Division 17 Tenant Equipment Room to Workstation –Increased equipment room sizing –Impact of space program –Coordination of pathways –Building automation –Architectural, Mechanical and Electrical Impacts

Archi-Technology, LLC Impacts of Division 17 At the Workstation –Additional space considerations related to CPU, monitors, printers, keyboard/mouse –Cabling –Increased BTU per workstation –Conference rooms and multimedia requirements Surfaces, Lighting and pathways

Archi-Technology, LLC Impacts of Division 17 On the Design Team –Architect, Engineer, Consultants Space program and system demands –Budgets Capital versus Operational –Design Issues Another element to integrate –Example: Card Access on Fire System, Security System, Door Hardware, Elevator and Code Issues

Archi-Technology, LLC Impacts of Division 17 On the Construction Team –General Contractor A new sub contractor –Construction Manager Unfamiliar with requirements –Construction Coordination Traditional models not inclusive –Timeline Impacts from outside of construction project

Archi-Technology, LLC Impacts of Division 17 On the Owner Team –Master Planning and Program Interdependency on Telecommunications Systems –IS/IT Departments Learn to work in construction environment –Facilities and Documentation Strategically managed to maximize the ROI

Archi-Technology, LLC Division 17 It has now become clear that we need to add a “T” to the AMEP design process Some have called it the “4th utility” The goal has been to establish an effective and comprehensive model that can be used to plan, build and also manage technology infrastructures in a manner consistent with the design industry

Archi-Technology, LLC Division 17 Division 17 is this model It can be used to organize a comprehensive set of performance specifications, cost estimates and series of Technology drawings Division 17 can completely manage a stand alone technology project or serve as an integrated component of a complete building/project design

Archi-Technology, LLC Division 17 Sections Front End General Cable Plant LAN Voice Audio/Video WAN Architectural, Electrical and Mechanical Intra Building Communication Systems Building Automation and Control Security, Access and Surveillance

Archi-Technology, LLC Division Summary Section Cable Plant 17100Cable Plant Overview 17110Communication Equipment Rooms 17120Main Equipment Rooms and Service Entrances 17130Interior Pathways 17140Exterior Pathways 17150Backbone Requirements 17160Horizontal Requirements 17170Testing, Identification and Administration 17180Cutover & Training 17190Support & Warranty

Archi-Technology, LLC Division Detail Section Communication Equipment Rooms Equipment Racks/Cabinets/Shelves Cable Management – Vertical & horizontal Patch Panels Fiber Patch Panels Backboards Termination Blocks Aluminum Ladder Rack Tie Wraps D rings and T Posts Grounding Bars

Archi-Technology, LLC Division 17 - Specifications A performance specification specifies the minimum quality requirements for how a product shall be manufactured and installed CSI SectionFormat consists of 3 Parts –PART 1 - GENERAL - administrative –PART 2 - PRODUCTS - materials –PART 3 - EXECUTION - installation

Archi-Technology, LLC Division 17 - Specifications PageFormat PART 1- GENERAL 1.1 WORK INCLUDED A.Provide all labor, materials, tools, and equipment required for the complete installation of work called for in the Contract Documents PART 2 - PRODUCTS 2.1 FLOOR MOUNTED RACKS A.Racks shall meet the following physical specifications: 1. 19” rack mounting space foot high. PART 3- EXECUTION 3.1 FLOOR MOUNTED RACKS A.All racks shall be anchored to the floor. B.Provide vertical and horizontal cable management in the front and back.

Archi-Technology, LLC Division 17 - Specifications The Division 17 Organizational Model provides the framework for preparing the specifications, but it is not the source The origin of specifications arose from drawing notes that became too numerous to fit on a drawing and have evolved into the Project Manuals present today So a new series of drawings for the Telecommunication requirements was developed

Archi-Technology, LLC “T” Series Drawings To prepare these drawings, the technology industry must be able to obtain accurate base files (floor plans) to prepare a set of “Technology” Drawings to plan and communicate the technology requirements with clients and other design professionals The following is a summary of the types of drawings that should be created:

Archi-Technology, LLC “T” Series Drawings T0 – Campus or Site Plans Exterior Pathways and Inter-Building Backbones T1 – Layout of complete building per floor Serving Zone Boundaries and Backbone Systems T2 – Serving Zones Drawings Drop Locations and Cable ID’s T3 –Communication Equipment Rooms Plan Views - Tech and AMEP and Elevations - Racks and Walls T4 – Typical Drawings Faceplate Labeling, Firestopping, ADA, Safety, DOT, etc.. T5 – Schedules (spreadsheets) for cutovers

Archi-Technology, LLC Review –We have identified that there is a gap between the Technology and Construction Industry –We understand some of the history of how it has happened –We have an organizational model for the performance specifications –and We have a Drawing Series that is dedicated to Technology

Archi-Technology, LLC New Process The key now is for telecommunication consultants to become part of the established design and construction process This is not always easy and is often challenged One method is for the customer to include telecommunication requirements in the project scope when selecting an architect or lead design professional

Archi-Technology, LLC New Process A second step is to have the “architect” incorporate the Division 17 requirements from the earliest stages of planning through the design and construction stages by including a Technology Engineer or Consultant in the process

Archi-Technology, LLC D 1-16: Scope SD DD CD BID CA/CM CO Manage D 17 Next Steps Scope SD DD CD BID CA/CM CO Manage SECTION DESIGN BUILD CUTOVER This will enable D17 to provide input to the D1-16 designs during the design phase and not as Change Orders During Construction 2nd Step is to Integrate 1st Step is to Educate and Synchronize with the Process

Archi-Technology, LLC New Process For this to happen, Telecommunication Consultants must prepare the project requirements using: –Performance Specifications based on The proposed Division 17 Organizational model The existing CSI master format, section format and page format documents –Organized Series of CAD Drawings

Archi-Technology, LLC New Process Then Telecommunication Contractors, Installers and Integrators must learn to interpret and work from: –Performance Specifications based on The proposed Division 17 Organizational model The existing CSI master format, section format and page format documents –Organized Series of CAD Drawings.

Archi-Technology, LLC Next Steps Support Division 17 as it evolves into an industry standard organizational model for Technology Infrastructures Use Division 17 as a basis for establishing communication with the existing design industry (A/E/C) Use Division 17 to create time, space and money on new construction projects

Archi-Technology, LLC Next Steps BICSI has submitted proposal to CSI Review of MasterFormat is underway with next edition out 2002 Join your local CSI Chapter and give the telecommunication industry a voice and a face The CSI Manuals of Practice will help you learn first hand how the design and construction industries work

Archi-Technology, LLC Next Steps Download, review and comment on the information from the Division 17 web site located at: Contribute to Division 17 and make it work for you The burden is on the telecommunications industry to learn how the design and construction industry works

Archi-Technology, LLC Next Steps