1 Regional Report San Joaquin River Hydrologic Region
2 San Joaquin River Hydrologic Region
3 Watersheds and Water Sources Local Surface Water Development Imports & Exports (State, Federal) Groundwater Recycled Water
4 San Joaquin River Hydrologic Region Applied Water Uses Source: California WaterPlan Update 2005
5 San Joaquin River Hydrologic Region Water Supplies Source: California WaterPlan Update 2005
6 Regional Supply Challenges/Actions Surface Water: Concern over the long-term availability of external supplies; concern over the long-term stability of the existing surface water supplies. Restoring Ecosystem: Restore the ecosystem along the San Joaquin River below Friant Dam while maintaining water supply reliability for other purposes. Integrity of Sacramento-San Joaquin levee system Groundwater
7 Regional Water Management Planning California Water Plan 50 Urban Water Management Plans Prop. 50 & 84 Integrated Regional Water Management Plans Groundwater Management Plans (AB 3030) City & County General Plans (SB 221/610) Court actions Other regional and sub regional plans on water rights, water quality, ESA, contracts/transfers, and flood control
8 Climate Change Temperature increase Snowpack decrease River runoff timing and magnitude changes Effects on water rights Water supply change Water use increase Water temperature increase increase dam releases for temperature control for species Tidal effects threat to delta islands and supply facilities relocation or modification of outfall facilities
9 Flood Management National Flood Insurance Program FEMA Floodplain Map Modernization Local ordinance updates, technical assistance Flood Subventions Project funding available from Propositions 1E and 84 FloodSafe California Develop and implement regional flood management to protect communities Proposition 1E Flood control subventions Stormwater flood management Flood protection corridors and bypasses
10 Region Accomplishments Development of a Comprehensive plan for the flood management system of the Sacramento and San Joaquin River regions. Development of the Vernalis Adaptive Management Plan as a 10-year test program. Upper San Joaquin River Basin Storage Investigation. Farmington Groundwater Recharge and Seasonal Habitat Program. South San Joaquin County Surface Water Supply Project – various Cities & South San Joaquin Irrigation District to plan for a water treatment plant on the Stanislaus River.
11 Looking to the Future Evaluate new local surface storage projects and investigations for water storage development. Implement groundwater conjunctive use projects. Increase efforts on water use efficiency & water recycling programs. Urban expansion. IRWM
12 IRWM Projects