RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
RF Cavity / Coupling Coil Module
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
US Construction Project: SSs, PRY, Cavities and test program 1.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Resource Loaded Schedule and Budget Profile
Completion of the MICE-US construction project
MICE RF System Power Supplies, Control and Monitoring Status report
Overview of the RFCC Module and 201-MHz Cavity Design
Presentation transcript:

RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting 32—RAL February 11, 2012

RF Summary - Zisman2 Outline Introduction RF cavity status RF power issues RF control and monitoring Testing issues Schedule Summary

February 11, 2012RF Summary - Zisman3 Introduction RF system required for Steps 5 and 6 Responsibility shared between two institutions —LBNL responsible for cavities [D. Li] o as part of RFCC modules —Daresbury Lab responsible for RF power sources and distribution system [A. Moss] o refurbishing power sources (originally from LBNL and CERN) o planning for installation of power systems in Hall o planning coax distribution system from power source to cavity Shared responsibility implies need for careful attention to interface issues

February 11, 2012RF Summary - Zisman4 RF Cavity Status (1) Complete or in progress —TiN-coated Be windows (11) available for RFCC-1 —ceramic RF windows (10) delivered —first set of 6 tuner arms in production at Fermilab o 6 actuators being fabricated —input coupler design improved (based on results from prototype test) —fixturing for electropolishing ready o awaiting ES&H approval to start (~1 month job to do 10 cavities) —single-cavity test vessel completed o delivery to Fermilab happens this month

February 11, 2012RF Summary - Zisman5 RF Cavity Status (2) To be done —physical (CMM) measurements to document cavity shape o few weeks work —frequency measurements o all cavities will be deformed to reach central frequency of 201 MHz —RF conditioning (without and with magnetic field  await first CC) No unresolved issues (yet)

February 11, 2012RF Summary - Zisman6 RF Power Issues (1) First amplifier tested to 1 MW —test with new TH116 tube to 2 MW full power level remains to be done o need to get this finished! —worthwhile to understand whether output power could be higher o permits “headroom” for amplitude regulation –and expected loss of performance as tube ages o accommodates transmission losses —however, there is some risk involved in finding out Review committee (December ’11) made a number of comments that merit our consideration —Moss to prepare response for comment by Tech Board o low tube lifetime (15K hrs at ISIS) –and imminent lack of supplier for additional tubes o need for headroom for control o maintenance challenge behind shield wall o amplifier sticks out above magnetic shield wall

February 11, 2012RF Summary - Zisman7 RF Power Issues (2) Other review comments —concern expressed about 4-in. coax power handling capability o suggested testing system at MTA before ordering waveguide —concern that specifications for RF system undefined —suggested that adjustable phase shifters were unnecessary complication Review comments and proposed responses discussed —tube availability is a real issue, but not much can be done o have 4 tubes now (£45K) o have purchased spare glass tubes as insurance —tube degradation information at 50 Hz (vs. MICE 1 Hz) o don’t really know scaling, so some “exposure” here –not a go-no-go issue —control headroom not accounted for, nor losses in transmission thru coax o not clear whether we need this control (see later) –could be we get less than 2 MW to cavity (  lower voltage)  or we cool cavities (not presently considered for routine operation)

February 11, 2012RF Summary - Zisman8 RF Power Issues (3) Proposed responses (cont’d) —investigated removal of phase shifters o looks sensible; get ~2% loss of acceleration compared with optimum phase o simplifies the plumbing –relieving maintenance concern o likely improves operational reliability —cursory look at amplifier position indicates field should be modest o power supplies on mezzanine are another story

February 11, 2012RF Summary - Zisman9 RF Power Issues (4) Proposed responses (cont’d) —4-in. coax should be okay with slow-fill ramp o much less reflected power (10%) –standard Fermilab operation mode —waiting for test not viewed as necessary o delay in order puts $ at risk o potentially disrupts MTA program Issues raised at this meeting —check whether more bellows are needed to simplify coax installation —check CAD model to make sure latest RFCC is used —need to start on LLRF design o have DL people to do this –need help from LBNL (Doolittle) —need better understanding of MICE requirements (timing; stability; …) reflected power

February 11, 2012RF Summary - Zisman10 RF Control & Monitoring Most hardware needed for first system built and tested now —test to 2 MW in March 2012 —on track for full test at RAL in Sept Desire to have second system available at DL before sending system 1 to RAL —at risk due to “cash-flow” problems o need to define “drop-dead” date for purchases to stay off of critical path Modulator (operational) 20 kV PSU & Aux. rack – front view

February 11, 2012RF Summary - Zisman11 Testing Issues Prudent to test full system after delivery to RAL —desirable to duplicate MTA single-cavity vacuum vessel at RAL o will minimize disruptions to MTA Not obvious (to me) that test of coax at MTA is justified Prudent to carefully test amplifier above 2 MW —compensation for losses —headroom for control o measurements of amplitude and phase jitter are valuable MUST understand, document, and demonstrate specifications of system —needed for LLRF design —Li and Moss propose timing workshop to get requirements (before CM33) —need general RF parameter discussion/workshop o phase and amplitude stability requirements –and means to achieve them

February 11, 2012RF Summary - Zisman12 Schedule (1) Planned schedule for RF power Current work in progress: —RF testing of System #1 with new 4616 and TH116 tubesNov 11 to Mar 12 Future work (Step V): time-scales to be confirmed —Assembly of CERN TH116 amplifier (System #2) (July 2012) —Test CERN amplifier at Daresbury (December 2012) —Develop RF Control Systems —Pack & ship complete system #1 to RAL (January 2013) —Install RF System #1 in MICE Hall (May 2013) —Test complete RF system #1 at RAL (September 2013) —Construct & test 4616 #2 amplifier, power supply & controls —Construct & test TH116 #2 power supply & controls —Test complete RF system #2 at DL —Pack & ship system #2 to RAL —Install RF System #2 in MICE Hall —Test complete RF system #2 at RAL Tasks in red are required for TIARA (deadline in brackets)

February 11, 2012RF Summary - Zisman13 Schedule (2) RF cavity cleaning should begin shortly —about 1 month job Single-cavity vacuum vessel fabrication complete —delivery to Fermilab this month o can test/process cavity to full field without B field –repeat with CC when ready o tests tuner mechanism and thermal performance o could test LN-temperature operation –risky, so do not use best cavity for this —open question: how many MICE cavities should be tested

February 11, 2012RF Summary - Zisman14 Summary Steady progress on all aspects of RF system —RF power system review very valuable o responses should be reviewed by Tech Board before finalizing o need to separate required testing from “feel-good” testing o explore risks/benefits of testing above 2 MW Time to get serious about specifications —timing workshop and detailed parameter discussions should happen prior to CM33 o important to have one RF group, not two half-groups Desirable to have complete second power system at DL before first system ships to RAL Desirable to have second single-cavity test vessel at RAL