Petroleum Engineering 406 Floating Drilling

Slides:



Advertisements
Similar presentations
WELD TESTING.
Advertisements

Manufacturing Processes Lab I, MET 1321 Inspection and Testing Welds
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
PETE 203 DRILLING ENGINEERING
Present Procedure for cutting stuck casing on Drilling PLATFORM
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
Petroleum Engineering 406
MATERIALS TESTING.
STEAM TRAPS.
Lawrence Livermore National Laboratory DOE Tri-Lab Assessment of BP Flange Connector Spool & 3 Ram Capping Stack June 26, 2010 Lawrence Livermore National.
Petroleum Engineering 406
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Gas Transmission Pipelines
Petroleum Engineering 411 Well Drilling
BASIC MUD LOGGING.
Pipe Supports and Restraints
ISO Wellhead Integrity
Design of an Aerospace Component
NAVAL MATERIALS.
LECTURE # 38.
CONNECTION DESIGN Connections must be designed at the strength limit state Average of the factored force effect at the connection and the force effect.
Pump Installation Vigyan Ashram, Pabal.
CHECK VALVES Check Valves Some Characteristics of Check Valves :
Engineering Non-destructive testing (NDT). Engineering Why use NDT? Components are not destroyed Can test for internal flaws Useful for valuable components.
Confidential to SMD JIP
STEAM HEATING.
Hydronic Mechanical Controls
General Design Guidelines
Compressed Air Piping Systems by Asahi/America
Pressure Vessels.
Lesson 18 Casing Design Example
Griner Drilling Service
Gas Exploration Team Hail 7 Casing Design. Overview Wellbore Schematic Design and load assumptions Design Factors Casing Strings & Connections Details.
IRP21: It’s Almost Over 2010 ICoTA Roundtable. Driven by events Suggested by various regulatory bodies We did have a choice ‘We’ could write this or let.
Hoan Bridge Failure Analysis Hoan Bridge Failure Analysis Wisconsin Department of Transportation City of Milwaukee, WI December 13, 2001 City of Milwaukee,
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
Petroleum Engineering 406 Lesson 9b Station Keeping.
Industry Fundamentals and Occupational Safety Unit 6
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Destructive Examination & Testing 2 Destructive Examination Destructive Examination renders the weld or material unfit for further service.
Petroleum Engineering 406 Floating Drilling
Welding Design 1998/MJ1/MatJoin2/1 Design. Lesson Objectives When you finish this lesson you will understand: Mechanical and Physical Properties (structure.
1 Petroleum Engineering 406 Floating Drilling Lesson 11a Motion Compensation.
Trouble Shooting How to Recognize Improper Installations January 2013 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages 1 -
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Beams - structural members supporting loads at various points along the member. Transverse loadings of beams are classified as concentrated loads or distributed.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Petroleum Engineering 411 Well Drilling
WELDED CONNECTIONS I.
IS:800 Section 13 FATIGUE. Introduction Mechanism of Fatigue Fracture Factors Affecting Fatigue Strength Design Strength & Cumulative Fatigue Damage IS:800.
Mould Maintenance Presented By S.K Mandal.
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
OBJECTIVES Discuss the procedure recommended for brake drum removal.
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Design Factors Collapse Corrected
Fans & Heaters technical seminar
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Welcome! Drafting 2323: Pipe Drafting
MATERIALS TESTING. Why are metals tested ? Ensure quality Test properties Prevent failure in use Make informed choices in using materials Factor of Safety.
CONNECTION Prepared by : Shamilah
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Lab8: Fatigue Testing Machine
Lab8: Fatigue Testing Machine
LIFT,ESCALATOR AND MOVING WALKS
Structural Fasteners Chap. (4) Non-Structural (A-307) Bolts A325
Gas Transmission Pipelines
Presentation transcript:

Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser

Lesson 10A - The Drilling Riser Riser Components Riser Tensioning Fatigue Kill/Choke Lines Inspection & Maintenance Reentry

Riser system for a floating drilling rig RISER TENSION SLIP JOINT INNER BARREL SLIP JOINT OUTER BARREL UPPER BALL JOINT KILL AND CHOICE LINES RISER JOINTS LOWER BALL JOINT BOP Mudline Riser system for a floating drilling rig Marine riser = drilling riser, get returns to surface, well control, communications link

Integral Marine Riser Joints Choke and kill lines are integral with the marine riser , flanged connections; clamp, etc

Integral Marine Riser Connector Flanged connection - 6 bolts NOTE: Choke and Kill Lines O-ring type seals - inspect when running

Integral Marine Riser Connector

Marine Riser Flexible Joint Flexible joint, binding from high tensile forces, inject lubricant, up to 1,500,000 lbf!

Upper Section Marine Riser System. MARINE RISER DIVERTER ASSEMBLY FLEXIBLE JOINT RISER TENSIONING LINES TELESCOPIC JOINT KILL AND CHOKE LINES Upper Section Marine Riser System.

A diverter system. Mud returns L.P. Annular Control valve Vent line Re-directs flow from rig floor to blooey line (10”+), downwind, do not shut in, erosion -10E8

Figure 6-6. Vertical steel loops used for kill / choke line transition around the ball joint.

Schematic diagram of riser with imposed forces The Drilling Riser MEAN WATER LEVEL RISER ELEMENT Schematic diagram of riser with imposed forces Optimum riser tension to minimize damage to riser and wear-and-tear on tensioners, sag

Applied tension in riser, kips Maximum stress Mean tension Stress in riser, kips Minimum stress Applied tension in riser, kips Tension in riser must be not too low and not too high. Set at 118 kips - will fluctuate 100-136 kips ~ 15%

Riser Considerations: Riser Metallurgy is very important. Correct heat treatment is essential. 80,000 psi min. yield strength and good toughness is preferred. Preheating, welding & normalizing after welding is critical for riser integrity & long life.

Riser Considerations: No Field Welding on Riser! Fatigue of riser cannot be measured prior to some indication of failure. Routine inspection required.

Riser Considerations: Fatigue is an embrittlement of the metal. It often starts in the vicinity of welds or other places of high stress concentration. Fatigue is caused by cyclic loading.

Riser Inspection: Visual Inspection of the riser should occur every time the riser is run. Check all the seals Check all the sealing areas

Riser Inspection: A complete inspection should be made annually. Dyes: Will detect cracks. To use dyes, paint must be removed. Magnetic Particle Inspection: Sand blast areas around welds prior to magnetic particle inspection.

Riser Inspection: Ultra-Sonic Inspection: May detect cracks below the surface. This test is run inside pipe. Paint removal is not necessary. X-Ray Inspection: Is for cracks inside the metal. It may miss surface cracks. *No one technique will find all the cracks.

Riser Instrumentation: Heavy Gauge: Pointer attached to guide line moving in front of graduated board. Riser Angle Indicator (at ball joint):

Riser Instrumentation: Accurate Positioning System: For detecting and monitoring vessel position.

Ball Joint: Vessel is offset Riser tension is inadequate A Ball Joint Angle > 4 degrees is an indication that something is wrong! Vessel is offset Riser tension is inadequate

Ball Joint: Must decrease ball joint angle before operations are resumed. Remedial Action: Decrease Offset Increase Riser Tension

Vessel to Seafloor Guidance System Guidelines are used for guiding equipment from the vessel to the seafloor. Selection and care of guidelines is critical.

Vessel to Seafloor Guidance System Guidelines should not be tensioned beyond 1/3 of breaking capacity But…inadequate tension is the most common cause of failure in guidelines

Vessel to Seafloor Guidance System Tension should be maximum when landing the BOP stack, or when landing the riser onto the stack. When the guidelines are not being used to run equipment, tension may be slacked off to ~ twice the weight of the line in seawater.

Table 6-1. Recommendations for Conventionally Used Guidelines As water depth increases, larger diameter guidelines must be used. Higher tensioning is required. Don’t forget to limit tension to < 1/3 of breaking strength.