PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.

Slides:



Advertisements
Similar presentations
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Potential for Graphite Oxidation in Dry Wall ICF Chambers El S. Mogahed, I. N Sviatoslavsky, J. G. Murphy, H. Y. Khater, M. H. Anderson, and G. L.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
A variety of load cases, ranging from nominal to degraded or abnormal operating conditions, were studied both numerically and analytically. The reviewers.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November 2013.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Melting Probe Progress Meeting: Summary of the experiments done and their influence on the new design E. Kaufmann, G. Kargl, N. Kömle Space.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Beam screens in IT phase 1
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
New Fast Wire Scanners in 4L1 and 11L1 - Vacuum outgassing measurements and vacuum pressure simulations – (Friederike Salveter, Jose Antonio Ferreira Somoza,
The Stripping Foil Test Stand in the Linac4 Transfer Line
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
1 MONTECARLO CALCULATIONS OF PRESSURE PROFILES FOR THE ESRF DIPOLE/CROTCH AREA R. Kersevan – Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Vacuum for DTL G.Vandoni on behalf of the TE/VSC Linac4 team 13 September, 2011G.Vandoni, TE-VSC1 Acknowledgements M.Malabaila, J.Hansen, A.Mongelluzzo,
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
Two-beam module layout
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Vacuum System P. Chiggiato TE-VSC
Stress and cool-down analysis of the cryomodule
SAES Project: Combination of NEG module and sputter ion pump
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Leak Detection Tutorial Work
Thermo-mechanical simulations jaws + tank
CEPC Vacuum System Dong Haiyi 2017/11/5.
XFEL Vacuum System Commissioning
COOLING & VENTILATION INFRASTRUCTURE
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Christian Hammill, Wayne State University
Phase II Collimators : design status
ISRC and LEBT Vacuum System Design
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Presentation transcript:

PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1

Why re-sectorising this sector? At the moment the sector valves are foreseen to be positioned right before and right after the stripping foils; LIU - PSB Ho-H- Injection Meeting 2 A different sectorisation would allow: -Less radiation for TE/VSC during pumping and leak detection. -More space for replacement of stripping foils. -Less problems to find space for primary pumping and venting. -The controlling of the initial phase of the pumpdown and venting was tested: no problems occurred (report under validation). Foil Dump

Several Case Study (1) LIU - PSB Ho-H- Injection Meeting 3 Option1 Option2 Option3 1.BASE LINE DESIGN, always for 1 ring. 2.Sector valve at the third manifold to the left of the injection zone and after the stripping foil. Modification of manifolds required. 3.Sector valve at the third manifold to the left of the injection and at the third to the right. Modification of manifolds required. = Sector Valve

Several Case Study (2) LIU - PSB Ho-H- Injection Meeting 4 Option 4 Option 5 4.Sector valve at the first manifold to the left of the injection and after the dump. With double SIPs between BSW 1&2. 5.Sector valve at the first manifold to the left and at the first manifold on the right. With double SIPs between 1&2 and 3&4. The pump down curve for all the options has been studied: following last meeting decisions we will focus on Option 4 and 5.

Pump down studies: option 1 LIU - PSB Ho-H- Injection Meeting 5 The pump down of a sector is divided in two stages: 1.A fixed TMP group takes care of the pump down from atmospheric pressure down to 1*10 -6 mbar; 2.At 1*10 -6 mbar the sputter ion pump are flashed and switched on. The time from atmospheric pressure to 1*10 -3 mbar will take about 15 minutes, according to the stripping foil experimental tests. If we consider that at 1*10 -7 mbar a first low intensity beam can be sent 5 to 6 hours after the end of the intervention including the leak detections, if the dumps are conditioned before. SIP ON TMP ON SIP Connections TMP &

Pump down studies: option 4 LIU - PSB Ho-H- Injection Meeting 6 TMP gate 2X SIP Option 4 The intervention time is about 2 hours more than option 1, with the dump conditioned.

Evaluation of the conditioning time for option 5 LIU - PSB Ho-H- Injection Meeting 7 Slope 1 (◦C/h)T 1 (◦C)Slope 2 (◦C/h)T 2 (◦C) Dump Vacuum Chamber Steady state reached in about 4 hours! M. Delonca

Evaluation of the conditioning time for option 5 LIU - PSB Ho-H- Injection Meeting 8 At 1*10 -7 mbar, the beam is hitting the dump, heating it following the temperature curves shown before. The whole surfaces of the dump and of the chamber are considered to be heated up to the maximum temperature.

Evaluation of the conditioning time for option 5 LIU - PSB Ho-H- Injection Meeting 9 With option 5 the conditioning of the dump will take place every time the dump is vented, increasing the intervention time by 2.5 hours (with the baseline SiC dump). No outgassing dynamic effects induced by the beam or unknown cables and switched are taken into account: the shown graph is the best scenario we will have. 45

Pressure Profile studies : Option 1, 4 and 5, comparisons LIU - PSB Ho-H- Injection Meeting 10 Position (m) Read Pressure Point 0 No sublimators taken into account!!

Intervention probability Option 1: high risk for the foil integrity and foil mechanical assembly, high risk for MTV mechanical assembly (high intervention dose). Option 5: same as option 1, more stainless steel surface and dumps and we lose the dump conditioning every time the system is vented to air equal longer time to achieve nominal beam (2.5h+less personal dose for pumping and leak detection). Option 4: same as for option 1. More stainless steel surface, but not critical. More space in injector zone (less personal dose for pumping and leak detection) and no loss of the dump conditioning. LIU - PSB Ho-H- Injection Meeting 11

Conclusions The displacement of these sector valves would allow for a safer intervention scenarios. The conditioning time has been evaluated for the worst case scenario of a SiC dump with broken contact for its cooling. In this scenario, the maximum temperature reached by the dump is around 240 ◦C, while the surrounding chamber heats up to 105 ◦C. Based on measured outgassing rates and excluding dynamic effects, we have calculated that: The venting to air of the dump has a limited effect on the pressure in the vacuum sector: max a factor 2 higher for about 2.5 hours. The impact on the duty time should be limited to 2 to 3 hours max. Other materials than SiC would have a much higher effect on the pressure ( e.g. graphite, more than a factor of 10 higher); as a consequence they should not be vented; The position of the valve can be changed from option 4 to option 5 whenever dump materials equivalent to SiC are chosen. No change to option 5 is possible for other materials or sliced SiC dump. Anyhow, option 5 will lead to a longer intervention time (at least 2.5 hours) than option 4. LIU - PSB Ho-H- Injection Meeting 12

Stripping foil venting – pumpdown testbench LIU - PSB Ho-H- Injection Meeting 13 -Injection during pumpdown to slow down the descent in pressure in its initial phase; -Injection at known different fluxes, checking the foil integrity; -Report about it under approval; Flowmeter (venting phase) Injection (Pumpdown phase)