1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.

Slides:



Advertisements
Similar presentations
Lean Six Sigma Project Presentation Template
Advertisements

Project leaders will keep track of team progress using an A3 Report.
6 SIGMA VS. KAIZEN/LEAN Manufacturing Systems Analysis.
1 © 2006 Superfactory™. All Rights Reserved. Design for Lean and Six Sigma Superfactory Excellence Program™
TPS House (Liker, The Toyota Way.).
June 2003Dr. Joan Burtner Industrial Engineering1 A Six Sigma Student Success Program Presented to:  Dr. Horace Fleming Executive Vice President and Provost.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Six Sigma Dr. Ron Tibben-Lembke SCM 462 Dr. Ron Tibben-Lembke SCM 462.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
What is Six Sigma? A goal of near perfection in meeting customer requirements A sweeping culture change effort to position a company for greater customer.
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Using Six Sigma to Achieve CMMI Levels 4 and 5
SIX SIGMA AND LEAN SIX SIGMA Gülser Köksal METU 2008.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Using Microsoft Project for Implementation of Six Sigma Projects A Tools and Tips Presentation Nora Gessert, Pcubed.
“Safety is a Measure of Success”
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
DMAIC Process Storyboard
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Roberts Tool Company, Inc Strategic Planning Presented at SEA Webex January 10, 2011.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Items Required for Process Hand-off
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Define Tollgate Checklist
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Six Sigma Overview Presented by: >. Agenda What is Six Sigma? History of Six Sigma Six Sigma Methodology When to use Six Sigma? Different Six Sigma belts?
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
The Value Driven Approach
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Designing products, services, and processes that satisfy both client.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Project Chartering & Approval Process
Rapid - Lean Six Sigma: Executive Overview Leading in a Lean Six Sigma Environment University of Washington – Tacoma Key Bank Professional Development.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
TM 720: Statistical Process Control DMAIC Problem Solving

Lean Six Sigma Road Map Improvement Process Road Map
Six Sigma.
LEAN SIX SIGMA PROJECT TEMPLATE
High Density Polyethylene Pipes Quality Improvement
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Questioning: Foundation for an Effective Champion …
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

1

2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer needs, disciplined use of facts, data and statistical analysis. Attention to managing improving and reinventing business processes. Proactive vs Reactive A way of thinking – Culture Change Works for both Manufacturing and Service processes Welch

3 Outcomes and Questions Outcomes Cost reduction Productivity improvement Market- share growth Customer retentions Cycle-time reduction Defect reduction Culture change Product/service development Initial Questions What does each process need What does each process provide How is the process evaluated Who is responsible for the process Proactive How long will my customers be satisfied with my current performance. There are always competitors What can we achieve that we had not thought of.

4 DMAIC D - Define M - Measure A - Analyze I - Improve C - Control Approaches 1.Project Team Full time black belts Part time team members Duration 1- 4 months 2.Kaizen Lead by black belt All members full time Define function done before Duration: 1week or less

5 Define Goal: The team and its sponsor reach agreement on the scope, goals, financial targets and performance targets for project. Steps: 1.Review draft project charter from sponsor. 2.Validate problem exists & important and goals are reasonable 3.Validate Financial benefits ( current vs target results) 4.Create and Validate process map and scope 5.Create Communication Plan ( who and when to keep informed) 6.Develop Project Plan ( schedule, budget, milestones) If necessary do Define step as a mini - Kaizen

6 Measure Goal : understand the current state of the process and collect reliable data on process speed, quality and costs that you will use to expose the underlying causes of the problems. Steps: 1.Create/validate a value stream map to confirm current process flow. A basic process map with defect rate, processing time, complexity, queue time, setup time 2. Identify the outputs, inputs and process variables relevant to your project 3.Create a data collection plan including operational definitions for all measures 4.Create a data analysis plan ( statistical methods to be used) 5.Use accurate and calibrated measurement instruments 6.Collect data to establish baselines 7.Update value stream maps with new data 8.Make quick hit improvements

7 Analyze Goal: To identify the causes affecting the key input and output variables tied to project goals Steps: 1.Identify Value-Added vs non Value-Added steps (Conduct Value Analysis) 2.Compare your current process metrics to benchmarks (Process Cycle Efficiency) 3.Analyze the process flow for bottlenecks, constraints, rework points for impact 4.Analyze data collected in Measure step. 5.Generate theories to explain potential causes 6.Narrow the search 7.Collect additional data to verify root cause

8 Improve Goal: To learn from pilots of the selected solution(s) and execute full scale implementation Steps: 1.Develop potential solutions based on the root causes found in the Analyze step. 2.Develop Criteria, evaluate, select, and optimize best solutions. 3.Develop “To Be” value stream map. ( what metrics you want to see) 4.Develop and implement pilot solution. 5.Confirm attainment of project goals 6.Develop and execute full-scale implementation plan

9 Control Goal: To complete project work and hand off improved process to process Owner, with procedures for maintaining the gains Steps: 1.Develop supporting methods and documentation 2.Launch Implementation 3.Lock in Performance gains 4.Monitor implementation 5.Develop Process Control Plans and hand-off control to process owner 6.Audit the results 7.Finalize Project 8.Validate performance and financial results

10 Videos Funny 6 Sigma Lean Mfg Cartoon