K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
Commissioning data are taken with individual chambers TP data autotriggered Cosmic rays data  ( different configuration) Different cosmic track angle.
Trouble shooting Before starting to work on a problem, first we have to understand the problem Once the problem is understood, we will try to “isolate”
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
A.meneguzzo, 03 april 2002 LNL- MB3 chamber test with cosmic triggers Some results on the tests performed on the MB3 chambers produced in Legnaro are presented.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
CMS WEEK – MARCH06 REVIEW OF MB4 COMMISSIONING DATA Giorgia Mila
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
DT calibration software: tentative release schedule S.Bolognesi & S.Maselli & G.Mila Alignement&Calibration Meeting, 25 January 2008, CERN.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Production ad Quality control of RPCs for the CMS muon barrel system
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
Calibration Status of the art – the first tTrig calculated from data
Barrel RPC Conditions Database
ScECAL+AHCAL+TCMT Combined Beam FNAL
Performance of MDC during New Data Taking
Series 5300 Lithium Cell Formation System
Limited Streamer Tube Project Summary
Presentation transcript:

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site2 Quality Control 1. QC of components (Al-plates, I-beams, HVB, HVC, FEB) 2. QC during mechanical production (wire tension, position, corner block position, 1.strip/I-beam) 3. QC after mechanical production/ during assembly with HV & FE (Gastightness, HV test in air & gas, noise, efficiency, mean time) 4. Storage of QC data

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site3 WIRE POSITION QC requirement: -Tolerance: nominal position 100  m, measure FE & HV end - Record in data base Aachen: Measure every wire position before closing layer, exchange till all positions are within limit System calibrated with LED- system and reference bar Output: Output: final file with only positions within limits Positions of wire, 1.strip & corner blocks POSITION OF 1.STRIP QC requirement: -Tolerance is 500  m, nominal? - Record in data base - Correction? Aachen: Measured 3-4 times along strip Output : paper document [4] CORNER BLOCK POSITION QC requirement : -Measure corner block w.r.t. closest wire before closing SL - Record in data base Aachen : Measured Output : Paper document [4] Recording without correction Non-straight strips ? More positions?

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site4 Wire Tension QC requirement: QC requirement: measure individual wires before closing the layer, allowed range 230 – 325 gr, no recording Aachen: ALL wires are measured and stored in a local file Frequency range phi 79.3 – 83.3 Hz, theta 90 – 98 Hz Wires with frequencies outside this range get replaced Output: Output: file with all wire tensions, only within tolerances (ASCII-> root)

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site5 Planarity Planarity of individual layers, SL007 below 200 micron SL Planarity, for first 14 SL measured for every layer. Later just top layer + cover. Output: Excel-file per SL Planarity of Honeycomb-panels Measured at Aachen: Hight over flat table (several points per HC) -> HR talk Output: local file

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site6 Quality Control 1. QC of components (Al-plates, I-beams, HVB, HVC, FEB) 2. QC during mechanical production (wire tension, position, corner block position, 1.strip/I-beam) 3. QC after mechanical production/ during assembly with HV & FE (Gastightness, HV test in air & gas, noise, efficiency, mean time) 4. Storage of QC data

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site7 Gas Tightness Gas Tightness ( ) QC requirement: QC requirement: 2 methods (pressure drop, oxygen content) Record in DB Aachen:  Pressure drop at 2 levels (2 HV-covers, FE+HV) for all SL   excellent results  Oxygen content just started recently  Information to store: 1 time constant per SL with final settings, Web accessible Pressure drop measurement is more relevant! Gas tightness is essential for operation of CMS Muon system. We should make an effort to have good gas tightness. Time constants around 1000 are feasible.

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site8 Pressure drop: P i = pressure at t=0 P a = pressure after t>0 Results from Pressure Drop QC requirement:  >135 min With two HV covers, time constant on average  ~1500 min In final conditions (FE+HV)  = 1200 min QC Requirement Our observations: Recommended to first measure with two HV covers (check of FE-cover tightness during second measurement) In case of leakage,  <5 min If additional sealing required, usual close to corner-blocks

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site9 HV Test in Air (7.2) Aachen Method: 1. Ramp-up strips (2.5 kV) and cathodes (-2 kV) without HVB for 10 min, granularity: Connect HVB and ramp-up to V wire/strip/cath = 3.9/1.9/1.6 kV 3. Monitor currents with a resolution of 10 nA. Require rest-currents 200 nA per HV channel Time dependance observed (increase by ~10 during days, then stable) Changes triggered by HV problems in gas: Increased HV-values in air, aiming at values for HV stability in gas: Strips 1.8 kV (gas) -> 3.3 (air) 3.8 kV 3.8 kV Cathodes 1.4 (gas) -> 2.5 (air) 3.1 kV Keep HV for several hours. Over night run before starting with gas. Current fluctuations. Tested with one SL.More statistics needed. In QCD common current-limit. We observe I wire/strip/cath ~ 10 / 50 / 75 nA In air mainly problems with strips.

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site10 Distribution of rest-currents for strips and cathodes Can we use rest-currents at this level as problem indicator? Time dependence (storage time, relaxation time of meas.)

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site11 HV Test in Gas HV Test in Gas (7.5) QC requirement: ramping up and down HV not stable QC requirement: „Conditioning is performed ramping up and down HV several times. This procedure stops if after N trials a channel is not stable... After several hours must be stable with 5% of disconnected channels and with a current per channel below 50 nA.“ Our observations:  Ramping-speed is crucial.  Rest-currents for strips & cathodes about 100 nA.  Current fluctuations (limited by trip-limit 5 mA) stay for several days. Are they critical?  Define stable running.

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site12 Aachen Procedure HV Training in Gas  Flush with gas for ~8 h (6 vol.exchanges).  Ramp-up in steps: Noticed: gas distribution inside SL very slow. HV wireHV strip HV cathode  HV OverNight~8-10 h OverNight~8-10 h Total time: Good SL ~3 days Incl.problem finding & repair (~1/3): weeks If problem, search for channel and disconnect (sometimes repair (glue, loose DC)). Very time consuming! Complicated by HV grouping. No. of SL with HV problems in gas: 5/8 -> too high for MP

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site13 Results of HV Training in Gas Question: What to do with close-to-limit cases (e.g V for wires, 1200 for cathodes, 1780 for strips? Despite high voltage settings in air, problems in gas. Fraction of disconnected channels < 1% Except SL 005 (10), Sl 010 (4) Longterm stability: 2 SL have been operating for ~4 weeks. Occasionally current over threshold, subsequent ramp-up smoothly.

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site14 Summary HV Remarks  The HV training is most critical/time consuming step in the commissioning phase.  50% cells which got cleaned in air, could not hold the HV in gas.  Ramping speed seems critical (< 10/5/5 V/sec).  What are typical rest-currents for strips and cathodes?  Can we use rest-currents in air as a problem indicator? Could avoid opening of SL and time consuming repair after cable harness and connector installed.  We need an agreement what to do with close-to-limit cases.  It seems advicable to ramp-up in air to higher voltages to reduce problems in gas.  Cathode voltages for test and operation. What to store from tests: on SL summary page (final settings, duration, number & cause of disconnected cells), Web accessible

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site15 Front-end/Testpulse System Tests done at Aachen: 1) Contact test, on average exchange 1 FEB per SL 2) Testpulses, check if all channel see testpulses of 2 V, threshold 15 mV 3) Cosmics data taking -> TH talk QC requirement: QC requirement: Rates 1 SL completely tested: SL 015 cells 41 (FEB3-9), 47 (FEB3-15), 119 (FEB8-7), 135 (FEB9-7), 170 (FEB11-10) <50% expected hits

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site16 TDC spectrum and Mean time t max = 370 ns Efficiency ~ 99% Probability for a 4.hit on a track Mean time Typical TDC spectrum for one cell Meantime=

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site17 A Typical Cosmics Output File (SL 15) Noise ~ 30 Hz Efficiency ~ 0.98 Afterpulse probability ~ 0.08 Meantime [mm] ~ 20 RMS [mm] ~ Residua l [mm] ~ 0.4 RMS [mm] ~ line: Meantime left/right with RMS

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site18 Summary of SL Status SL Summary Sheet File from cosmics data taking

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site19 Marinas Proposal from last CMS week Can local directories be linked ? Platform independent tools File format, units etc.

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site20 Relevance of QC Information for future Data Analysis very relevant for muon reconstruction not essential Some data are very relevant for muon reconstruction, like corner block position needed for alignment. Other data, like wire tension, are not essential for data analysis but for chamber operation. QC during production has different meaning (monitoring correction). Divide QC data in 2 groups [app.no. of data per SL]: QC until values are within limits Wire position [200] Wire tension [200] Rest-currents [25] Values just noted but no correction 1.strip position [4] Gastightness [1] No.of dead channels [0-10] Corner block position [4] O 2 -content [1] Noise [200] Efficiency [200] Mean time [6 x 200] Planarity [50] HV settings [3] Presently accessible via www

K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site21 QC Data Storage QC during production Store QC data Controlling For public access For future reconstruction Use of information for muon reconstruction DB HTML based Others Get started: Place priorities! Which data most urgently needed for public access (operation of chambers at ISR, alignment testbench, etc). Aim of data storage. Schedule. I’d estimate ~4 weeks for this amount of data in Aachen. Gastightness, O 2 -content HV settings No.of dead channels Corner block position 1.strip position Noise Efficiency Mean time