NIOWAVE www.niowaveinc.com Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGEMENT. PLANNING - PROGRESS.
Advertisements

American Welding Society Nashville Section
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
PPAP Requirements Training
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Qualification for Brazing
First Article Inspection Report
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Comments to Manufacturing QA documentation
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
Tim Haeberle API SC Winter Meeting
1 Inspection and Testing Approved for Public Release.
Materials Bratislava 11/12/13 April 2005 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure Equipment Directive.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
API Spec 6A Tensile Test Spec Reference Requirements Tim Haeberle API SC Summer Meeting.
Documentation Traceability and documentation is required.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Compressor status AWAKE Technical Board meeting 19 August 2015.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Status of Activities at CERN
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Full document available on EDMS Metallurgical qualification of AISI 316L TIG welded tubes Summery - Richard French.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Supplier Quality Improvement
Duties and Responsibilities
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Beam Vacuum Interconnect Design Options Ray Veness.
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
WELDING PROCEDURES and WELDERS QUALIFICATION
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preparation of functional/engineering specifications for HL-LHC
CLEAN UP & INSPECTION.
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Cryostat procurement, status and plan, QA/QC
مرکز پژوهش و مهندسی جوش ايران تابع سازمان گسترش و صنایع نوسازی ایران
CERN Engineering Specification
Flexible lines assembly
National Laboratory Association
Analysis of niobium material
Superconducting RF Crab Cavities
Inspection and Testing
For the benefit of business and people
Dennis Harwig and Bill Mohr, EWI
SNS PPU Helium Vessel Design and Assembly
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval Presented 12/5/2014

NIOWAVE Requirement for Manufacturing Readiness 2 #Requirements Submitted to CERN Approved by CERN 1Niobium material samples according to Section /24/201410/31/2014 2material certificates and quality control of raw materials (including RRR measurements) 10/24/ /31/2014 3material certificates of welding consumables (whenever applicable) 10/24/ /31/2014 4Functional and manufacturing drawings (with tolerances) 10/24/ /5/2014 5Design reports demonstrating that welds are designed to withstand the specified load cases (refer to Section 3.6.1) 10/13/ /16/2014 6Welding plan including: Welding maps 11/7/ /14/2014 Welding and brazing procedure qualification record including CERN acceptance criteria in Section 4.2 (WPQR and BPQR) 11/7/2014 Welding and brazing procedure specification (WPS and BPS) 11/7/201411/14/2014 Welders perfomance qualification (GTAW), Welding and Brazing Operators Perfomrance Qualifications (electron-beam welding and vacuum brazing) - WPQ, WOPQ and BOPQ 11/14/2014 BOPQ only 7Manufacturing procedures (whenever required by Annex 6.3) 10/15/2014 8Test procedures (whenever required by Annex 6.3) 11/21/2014 9EB welded and vacuum brazed samples according to the requirements specified in Section /15/ /31/ NDT personnel qualifications 11/14/ Manufacturing and inspection plan (MIP) - list of all manufacturing and quality control operations 11/7/2014

NIOWAVE 1. Niobium Material Samples Submitted: –Layout for Tensile Test Dog Bones (3mm Nb sheet) –L-shaped Dog Bone (25mm NbTi plate) –Round Dog Bone (16 mm Nb disk) Approved 10/31 3

NIOWAVE 2. Material Certificates and Quality Control Initially submitted on October 13, 2014: –3mm Niobium sheet (Ningxia) –133mm diameter Niobium rod (Heraeus) –25mm NbTi plate (Ningxia) Resubmitted to CERN with SS certs on 10/24 –316LN stainless Approved 10/31 4

NIOWAVE 3. Material Certificates of Welding & Brazing Consumables & Certs Approved 10/31 –Braze inserts made from CERN supplied 316LN stainless 5

NIOWAVE 4. Functional and Manufacturing Drawings Initially submitted on October 13, 2014: –Beamtube braze flange assembly A –Beamline port tube and adapter assembly –Transition ring pipe –Beamline transition ring –Beamtube A part 1 –Beamtube A part 2 –Beamline pusher block –Beamtube braze flange –83.1 mm tube blank 30” long Approved 11/5 6

NIOWAVE 5. Weld Design Reports Design reports demonstrating that welds are designed to withstand the specified load cases as specified in Section –Required on an as needed basis if design changes from specification drawing –CERN to complete design reports if necessary NO Design Reports for the Beamtube assembly at this time Approved by CERN on 10/16 7

NIOWAVE 6. Welding Plans Documents for Beamtube Assembly: –Weld map (submitted 11/7) –Weld matrix (submitted 11/7) –Braze procedure specification (BPS) (submitted 11/7) Nb to SS –Welding procedure specification (WPS) (submitted 11/7) Nb to Nb Nb to NbTi –Welding and brazing procedure qualification records (submitted 11/7) –Welder and braze tech performance qualification* Braze operator qualification to be submitted 11/14 Weld operator qualification in progress *Supplier to provide operator qualification 8

NIOWAVE 7. Manufacturing Procedures Submitted October 15, 2014 –Nb forming and handling procedure –Acid etching procedure –Cleanroom processing –Dimensional controls Feedback received 11/5 9

NIOWAVE 8. Test Procedures Test procedures to be provided –Radiography (ASTM E , contractor) –Leak check (Niowave) To be submitted 11/14 Leak Check Certificate 10

NIOWAVE 9. EB Welded & Vacuum Brazed Samples Sent October 15, 2014: –Braze coupon tension test –Braze coupon peel test –Weld sample for RRR test –NWV-EBW-001 Weld sample layout –NWV-EBW-002 Weld sample layout –NWV-EBW-003 Weld sample layout –NWV-EBW-004 Weld sample layout –NWV-EBW-005 Weld sample layout Approved 10/31 11

NIOWAVE NDT Personnel Qualifications Qualifications for all NDT test technicians to be be provided –Leak check technicians (Niowave) –Radiography technicians (supplier) To be submitted 11/14 NDT Technician Qualifications 12

NIOWAVE Manufacturing and Inspection Plan (MIP) MIP for Beamtube Assembly is established Submitted 11/7 Brazed Flange Manufacturing Process 13