BST use in experiments Feedback from ALICE, ATLAS, CMS, LHCb Sophie Baron, BI-TB on BST17 october 20131.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Applications developed by EN-ICE clients. 2 EN-ICE Workshop – 23 April 2009 Developed by people outside EN-ICE making use of: Our integrated solutions.
LHC’s Second Run Hyunseok Lee 1. 2 ■ Discovery of the Higgs particle.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
J. Varela, LIP-Lisbon/CERN LEADE WG Meeting CERN, 29 March 2004 Requirements of CMS on the BST J. Varela LIP Lisbon / CERN LHC Experiment Accelerator Data.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Stepper Motor Control, PLC vs VME Herb Strong, Pam Gurd Spallation Neutron Source Oak Ridge National Laboratory October 17, 2007.
COGGING MEETING Cogging Semi-Fine Adjust without collisions? Fine Adjust When? Cogging Meeting – Sophie BARON.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE1102 ATLAS CMS LHCb Totals
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
BCID Reset T.Dai, H.Boterenbrood, E.Pasqualucci Mar. 26 th 2009 MDT JTAG and BCID/ECID Reset Meeting 1.History; 2.BCID of First Bunch.
Signals between LHC Machine & ALICE David Evans ALICE TB 13 th December 2005.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
Physical Views Component: A component is a physical unit of implementation with well-defined interfaces that is intended to be used as a replaceable part.
Sophie BARON, PH-ESSLEADE, 15/06/06 1 TTC upgrade Status May 2006  Overview  AB/RF optical links  Receiver crate  Status and schedules  Documentation.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
SMI 7 May 2008B. Franek SMI++ Framework Knowledge Exchange seminar 1 SMI++ Object-Oriented Framework for Designing and Implementing Distributed Control.
CERN Richard Jacobsson, CERN LEADE meeting, March 29, Physics trigger RS TFC SwitchThrottle OR/Switch VELO FEST FEOT FE Clock Orbit Clock Orbit.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Fabio Follin Delphine Jacquet For the LHC operation team
Wednesday
Hand-shake Signals Between LHC Machine and Experiments
Javier Serrano CERN AB-CO-HT 29 February 2008
TTC signals: Global Trigger and Global Muon Trigger
RF-TTC Joint News LEADE, June 2008
Safe mode transmission
Monday 21st January & night
Strategy for long-term support of the TTC system
LHC Morning Meeting - G. Arduini
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday Ramp single nominal bunches for loss maps
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
1v1.
LHC Fast Timing Commissioning
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 27th August & night
ACR display works in progress Claudio Bortolin – Università di Udine
DCS for LHC IF Peter Chochula 28 june 2019.
Beam instrumentation and background monitoring
Presentation transcript:

BST use in experiments Feedback from ALICE, ATLAS, CMS, LHCb Sophie Baron, BI-TB on BST17 october 20131

Main Usage UTC time and beam related information (Orbit number) directly inserted to the event data of experiments (with source and identity information) - CMS, LHCb, ALICE Injection pre-pulse, occasionnally - LHCb, ALICE Beam mode for – cross-checking DIP - All experiments – Automatic switching of TTC experiments bunch clock (between LHC Bunch Clock and an internal source): foreseen in TTC hardware, but finally managed by software using DIP for more flexibility 17 october 2013Sophie Baron, BI-TB on BST2

Feedback on BST « The BST system provides a very convenient method of receiving these beam-related data as the number of components needed to implement the receiver is minimal, by comparison to say, the GMT system. » CMS « The BST system is a very useful interface between experiment and machine and we intend to use it in the future as well, or what ever alternative is prepared in the machine upgrade program. » LHCb « We only use the BST system for monitoring/cross- checking purpose, so if all of a sudden BST would disappear, we would not cry… But if it stays or changes, we would probably still want to receive the signals, one never knows when they could become useful. » (..) ATLAS 17 october 2013Sophie Baron, BI-TB on BST3

Future… Many paths of exchanging information between LHC and experiments exist for the moment (BST, GMT, DIP,...). Each experiment found its own way to use them. Since the LEADE or LPC committees do not exist anymore, we feel a strong need from the experiments to know better how the informations will be exchanged between LHC and experiments in the future, and to take part on discussions on the subject. 17 october 2013Sophie Baron, BI-TB on BST4